For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.03.215 — Construction and restoration standards for newly constructed or overlayed streets

Code of Ordinances, City of Beaumont, Texas (through Ord. 26-062 adopted 2026-10-06 (eCode360 BE6239 publication, data-code-date 2026-10-06, scraped 2026-11-21)) · Beaumont Code of Ordinances § 14.03.215

Corpus is an independent public-information project, not the official City of Beaumont website. Stable reference: corpuslaw.us/code/f81841a9-19aa-4ece-8354-3069dba3dfa3

§ 14.03.215: Construction and restoration standards for newly constructed or overlayed streets.

(a) Generally. No agency, network provider, or public infrastructure contractor shall cause an open trench excavation or potholing of facilities in the pavement of any public right-of-way for a period of three (3) years from the completion of construction or resurfacing except in compliance with the provisions of this section. (b) Criteria for approval. No permit for excavation in the right-of-way of new streets shall be approved unless the city engineer finds that all of the following criteria have been met: (1) Boring or jacking without disturbing the pavement is not practical due to physical characteristics of the street or alley or other utility conflicts. (2) Alternative utility alignments that do not involve excavating the street or alley are found to be impracticable. (3) The proposed excavation cannot reasonably be delayed after the three-year deferment period has lapsed. (c) Exemptions for emergency operations. Emergency maintenance operations shall be limited to circumstances involving the preservation of life, property, or the restoration of customer service. Agencies, network providers, or public infrastructure contractors with prior authorization from the city engineer to perform emergency maintenance operations within the public rights-of-way shall be exempted from this section. Any agency, network provider, or public infrastructure contractor commencing operations under this section shall submit detailed engineering plans, construction methods, and remediation plans no later than the next business day after initiating the emergency maintenance operation. (d) Construction and restoration standards for newly constructed or overlayed streets and alleys. The streets shall be restored and repaired in accordance with design and construction standards adopted by the city and guaranteed in accordance with section 14.03.204.

( Ordinance 19-017 adopted 4/2/19 )

Ask a question about Beaumont law

Corpus searches the Beaumont sections it holds and shows the ones that match, with their citations. Free, no sign-in.