For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.02.148 — Construction requirements

Code of Ordinances, City of Beaumont, Texas (through Ord. 26-062 adopted 2026-10-06 (eCode360 BE6239 publication, data-code-date 2026-10-06, scraped 2026-11-21)) · Beaumont Code of Ordinances § 22.02.148

Corpus is an independent public-information project, not the official City of Beaumont website. Stable reference: corpuslaw.us/code/082c17c7-8c6e-49f2-8cbc-de90c30dd8a5

§ 22.02.148: Construction requirements.

(a) Before work begins under a contract for construction of sewers or water lines in a development, proof of the following must be submitted to the director by the owner of the development: (1) All construction will be in accordance with department approved plans and specifications. (2) The contractor has public liability insurance acceptable to the city in the amount of not less than two hundred fifty thousand dollars/five hundred thousand dollars ($250,000.00/$500,000.00) for bodily injury and twenty thousand dollars ($20,000.00) for property damage. (b) When all of the requirements of this section have been met, the director will issue a letter to the owner of the development giving permission to begin construction. (c) All sewer and water line installations shall be designed in accordance with criteria and specifications established by the department. (d) All engineering services shall be provided by the city for extensions to individual lots with costs thereof included in the total cost of construction. (e) All engineering services required, including resident inspection, for construction of sewers or water lines within the boundaries of developments shall be furnished by the development’s engineer. Plans, specifications and contract documents shall be approved by the department prior to construction. (f) Responsibility for resident inspection of construction shall be included in and be a part of the engineering services set forth above. During actual construction, the engineer, or his representative, shall be on the site at all times. The engineer shall have the right to halt construction when there is an indication that the plans and specifications are not being or have not been followed until such deviations are corrected to his satisfaction. The engineer shall, upon satisfactory completion of the project, issue to the director a letter certifying the construction meets the requirements of all the plans and specifications and was completed to the satisfaction of the engineer. (g) In addition to the resident inspection specified above, and where resident inspection is not a responsibility of the department, department inspectors shall visit the site periodically and, upon project completion, shall recommend to the director that final approval be given. (h) The owner of a development desiring sewer or water line extension to its boundary shall submit a written request to the director listing the lots and blocks of the property abutting the extension. Two (2) approved plats of the area to be served shall be included with the request and become the property of the city. If the area for which service is requested is part of a larger area owned or controlled by the owner of the development and which can reasonably be expected to require future extensions, then two (2) preliminary plats of the larger area shall also be submitted showing a tentative design of overall layout for the entire area.

( 1958 Code, sec. 40A-7 ; 1978 Code, sec. 28-87 ; Ordinance 08-040 , sec. 33, adopted 5/13/08 )

Ask a question about Beaumont law

Corpus searches the Beaumont sections it holds and shows the ones that match, with their citations. Free, no sign-in.