§ 24.03.102 — Application; scope of permit requirements
Code of Ordinances, City of Beaumont, Texas (through Ord. 26-062 adopted 2026-10-06 (eCode360 BE6239 publication, data-code-date 2026-10-06, scraped 2026-11-21)) · Beaumont Building and Development Code § 24.03.102
Corpus is an independent public-information project, not the official City of Beaumont website. Stable reference: corpuslaw.us/code/d8d78277-cb01-4294-b1c4-0699cfb855d8
§ 24.03.102: Application; scope of permit requirements.
(a) Every person who shall install, cause to be installed, or permit to be installed any electrical wiring, fixtures, or equipment or shall make any alteration, addition, change, or repair within the scope of this code shall, within forty-eight (48) hours after the commencement of such work, make application for a permit therefor with the city electrical inspector. (b) There shall be one permit for each building for which rough work for electrical conductors or electrical equipment is installed. Accessory buildings, tourist cottages, or group houses shall not be considered separate buildings when the work is to be installed as one complete project and at one time, except where separate switches or meter loops are installed thereon. (c) Application for permits shall be made in writing upon forms provided by the electrical inspector's office for that purpose. With such application there shall be filed a diagram or plan showing clearly the character and kind of wiring or installation of fixtures or equipment work to be done. The plan or diagram shall show the manner in which the electrical installation is to be made, or the character of any repairs to any existing electric installation. Such application shall include the following information: (1) Street and house number; (2) Name of the owner; (3) Kind of buildings; and (4) A list of electrical fixtures and appliances to be installed. (d) The diagram or plans, and application, shall be referred to the chief electrical inspector, who shall have the authority to issue or refuse to issue a permit. (e) Plans for buildings of more than five thousand (5,000) square feet, based on exterior dimensions, or more than two (2) stories in height, shall bear the seal and signature of a professional electrical engineer licensed in the state.
( 1958 Code, secs. 11-28, 11-30 ; Ordinance 88-75 , sec. 5, adopted 8/16/88 ; 1978 Code, sec. 6-101 ; Ordinance 24-011 adopted 3/19/2024 )
Ask a question about Beaumont law
Corpus searches the Beaumont sections it holds and shows the ones that match, with their citations. Free, no sign-in.