§ 24.03.184: Final inspection.
Upon the completion of all electrical wiring or installation of fixtures or equipment in any building or on any premises, the electrical contractor shall notify the chief electrical inspector that the work is ready for final inspection, giving the electrical permit number and street address, and the chief electrical inspector shall then cause inspection to be made within twenty-four (24) hours from the time of receipt of notification (excluding Sundays, city and legal holidays) and, if any faulty or defective wiring or equipment is found, the electrical contractor shall be notified of the changes to be made in order that such work shall conform to this code. If such work is found to be correctly installed, replaced, or repaired, the electrical certificate shall state that the wiring or installation work has been installed in accordance with the provisions of this code. For each final inspection requested after the first has been made, the final inspection fee shall be paid as provided.
( 1958 Code, sec. 11-57 ; Ordinance 87-41 , sec. 11, adopted 5/26/87 ; 1978 Code, sec. 6-123 ; Ordinance 24-011 adopted 3/19/2024 )
Ask a question about Beaumont law
Corpus searches the Beaumont sections it holds and shows the ones that match, with their citations. Free, no sign-in.