§ 26.03.005 — Easements
Code of Ordinances, City of Beaumont, Texas (through Ord. 26-062 adopted 2026-10-06 (eCode360 BE6239 publication, data-code-date 2026-10-06, scraped 2026-11-21)) · Beaumont Building and Development Code § 26.03.005
Corpus is an independent public-information project, not the official City of Beaumont website. Stable reference: corpuslaw.us/code/f5734b7d-2963-49ff-a15a-9fe97be66465
§ 26.03.005: Easements.
(a) Minimum utility easements of between ten (10) and twenty (20) feet shall be provided along rear and side lot lines when necessary for use by public and private utilities. Provided, however, that the planning commission may require easements of greater widths for the extension of main storm sewers, water lines or sanitary sewers and other utilities when it is deemed necessary. (b) Minimum drainage easements shall be required when a subdivision is traversed by a watercourse, drainage channel, stream or underground conduits. Minimum easements shall be adequate to provide for the drainage requirements as determined by the city engineer or any local drainage districts. (c) Utility easements should be laid out with the following widths and locational order for each facility. (1) A twenty-foot perimeter easement beginning at the property line; the phone line should be offset three and one-half (3-1/2) feet, the electrical lines offset seven (7) feet and the poles nine (9) feet, the sanitary sewer offset thirteen (13) feet, the cable television offset sixteen (16) feet and gas line offset at eighteen (18) feet. (2) For a twenty-foot back-to-back easement beginning at the north or east line of the easement, the phone line should be offset two (2) feet, the electrical lines offset five (5) feet and the poles seven (7) feet, the sanitary sewer line offset twelve (12) feet, the gas line offset sixteen (16) feet, and the cable television line offset eighteen (18) feet. (3) For a street right-of-way utility layout the storm sewer should be one and one-half feet behind the curb, the gas line five (5) feet, the sanitary sewer seven (7) feet with the water line on the other side of the right-of-way, electrical lines ten (10) feet, cable television twelve (12) feet and telephone at fourteen (14) feet. A five-foot utility easement adjacent to both sides of the right-of-way is required. (4) All utilities placed underground shall be at a depth of not less than twenty-four (24) inches measured from top of curb or pavement. (5) Storm sewers shall be located within a dedicated right-of-way or a dedicated storm sewer easement, but not within a utility easement.
( Ordinance 83-95 , sec. 2, adopted 9/13/84 ; Ordinance 91-83 , sec. 2, adopted 10/8/91 ; 1978 Code, sec. 24-16 )
Ask a question about Beaumont law
Corpus searches the Beaumont sections it holds and shows the ones that match, with their citations. Free, no sign-in.