Sec. 18-768. - Approval procedures.

All solar energy systems constructed, reconstructed, installed, moved, or maintained within city limits shall comply with all of the following requirements: (1) Zoning. a. Solar energy systems are a permitted accessory use within all districts, whether as part of a structure or incidental to one or more structures. Solar energy systems will be permitted according to Table 18-1: Solar Energy Systems by Use District. Table 18-1: Solar Energy System by Use District Use District | Roof-Mounted Solar Energy System | Small-Scale Ground-Mounted Solar Energy System | Medium-Scale Ground-Mounted Solar Energy System | Large-Scale Ground-Mounted Solar Energy System Dwelling (D) | Allowed | Allowed | Site Plan Review | Not Allowed Dwelling/Retail (DR) | Allowed | Allowed | Site Plan Review | Not Allowed Apartment (A) | Allowed | Allowed | Site Plan Review | Site Plan Review Professional Office (1C) | Allowed | Allowed | Site Plan Review | Site Plan Review Light Retail (2C) | Allowed | Allowed | Site Plan Review | Site Plan Review Medium Retail (3C) | Allowed | Allowed | Site Plan Review | Site Plan Review General Retail (4C) | Allowed | Allowed | Site Plan Review | Site Plan Review Light Commercial (5C) | Allowed | Allowed | Site Plan Review | Site Plan Review Medium Commercial (6C) | Allowed | Allowed | Site Plan Review | Site Plan Review Light Industrial (7C) | Allowed | Allowed | Allowed | Allowed Medium Industrial (8C) | Allowed | Allowed | Allowed | Allowed Heavy Industrial (9C) | Allowed | Allowed | Allowed | Allowed (2) Building permit. a. A building permit application shall be required for the construction of all new solar energy systems and shall be accompanied by the following: i. Submit a signed application for a building permit with plans, specifications, and scope of work including the following information: 1. Property lines and physical features, including roads, for the project site; 2. Proposed changes to the landscape of the site, grading, vegetation clearing and planting, exterior lighting, screening vegetation or structures; 3. Blueprints or drawings of the solar energy system showing the proposed layout of the system, the distance between the proposed solar collector and all property lines, and the tallest finished height of the solar collector; 4. Name, address, and contact information for proposed system installer; 5. Name, address, phone number and signature of the project proponent, as well as all co-proponents or property owners, if any; 6. Zoning district designation for the parcel(s) of land comprising the project site; 7. Documentation that the owner has submitted notification to the utility company of the customer's intent to install an interconnected customer-owned generator. Off-grid systems are exempt from this requirement; 8. Large scale ground mounted systems shall provide an agreement to remove all components in accordance with all local, state, and federal laws and restore the site to its original state within 90 days of discontinued operations. ii. Payment of the appropriate permit fee as indicated in section 18-123; iii. Submit sealed as-built plans prior to final inspection. b. If required by Table 18-1: Solar Energy System by Use District, the solar energy system shall be approved through the site plan review process prior to a building permit being issued. (3) Administrative review. a. Conduct of review. Review of solar energy systems will be conducted by building permits division upon an application submission to the building official for a building permit. b. Review criteria. The building official shall review solar energy system applications based on the following criteria: i. Compliance with building code. All solar energy systems shall comply with the requirements established in chapter 18, article III, building. ii. Compliance with electric code. All solar energy systems shall comply with the requirements established in chapter 18, article VI, electricity. iii. Compliance with windstorm code. All solar energy systems shall comply with the requirements established in chapter 18, article XII, windstorm code. iv. Manufacturer specifications. All solar energy systems shall comply with the manufacturer's engineering specifications. v. Utility notification. All grid-intertie solar energy systems shall comply with the interconnection requirements of the electric utility. Off-grid systems are exempt from this requirement. c. Timing of decision. The issuing official shall render a decision on a complete building permit application within ten days, except when an extension may be agreed to by the applicant. d. Denial of an application for a solar energy system. If the standards of this article are not met, the issuing official shall deny the permit in writing with evidential support in the written record of the application process. The issuing official shall provide the written denial promptly to the applicant. e. Appeals. If administrative approval is not allowable or is denied, the applicant may appeal the decision to the board of adjustment.

(Ord. No. 2017-1518-A, § 1, 4-18-2017)