§ 157.20: On-site technical regulations.
(A) Abandoned wells. All wells shall be abandoned in accordance with the rules of the Railroad Commission; however, all well casings shall be cut and removed to a depth of at least ten feet below the surface unless the surface owner submits a written agreement otherwise. No structures shall be built over an abandoned well. (B) Blowout prevention. In all cases, blowout prevention equipment shall be used on all wells being drilled, worked-over or in which tubing is being changed. Protection shall be provided to prevent blowout during gas operations as required by and in conformance with the requirements of the Commission and the recommendations of the American Petroleum Institute (API). The operator must equip all drilling wells with adequate blowout preventers, flow lines and valves commensurate with the working pressures involved as required by the Commission. (C) Chemical and materials storage. All chemicals and/or hazardous materials shall be stored in such a manner as to prevent, contain, and facilitate rapid remediation and cleanup of any accidental spill, leak, or discharge of a hazardous material. Operator shall have all material safety data sheets (MSDS) for all hazardous materials on site. All applicable federal and state regulatory requirements for the proper labeling of containers shall be followed. Appropriate pollution prevention actions shall be required and include, but are not limited to, chemical and materials raised from the ground (e.g., wooden pallets), bulk storage, installation and maintenance of secondary containment systems, and protection from stormwater and weather elements. (D) Compliance. Operator shall comply at all times with all applicable federal, state and city requirements. (E) Discharge. No person shall place, deposit, discharge, any oil, naphtha, petroleum, asphalt, tar, hydrocarbon substances or any refuse including wastewater or brine from any gas operation or the contents of any container used in connection with any gas operation in, into, or upon any public rights-of-way, alleys, streets, lots, storm drain, ditch, sewer, sanitary drain or any body of water or any private or public property in the city. (F) Drill stem testing. All open hole formation or drill stem testing shall be done during daylight hours. Drill stem tests may be conducted only if the well effluent during the test is produced through an adequate gas separator to storage tanks and the effluent remaining in the drill pipe at the time the tool is closed is flushed to the surface by circulating drilling fluid down the annulus and up the drill pipe. (G) Drilling fluids. Low toxicity glycols, synthetic hydrocarbons, polymers and esters shall be substituted for conventional oil-based drilling fluids. (H) Drilling notice. The operator shall provide 48-hour notice to the City Manager or his designee before the start of drilling operations. (I) Drip pans and other containment devices. Drip pans and other containment devices shall be placed or installed underneath all tanks, containers, pumps, lubricating oil systems, engines, fuel and chemical storage tanks, system valves, connections, and any other areas or structures that could potentially leak, discharge, or spill hazardous liquids, semi-liquids or solid waste materials. (J) Dust, vibration and odors. All drilling and production operations shall be conducted in such a manner as to minimize, so far as practicable, dust, vibration or noxious odors, and shall be in accordance with the best accepted practices incident to drilling for the production of gas and other hydrocarbon substances. All equipment used shall be so constructed and operated so that vibrations, dust, odor or other harmful or annoying substances or effects will be minimized by the operations carried on at any drilling or production site or from anything incident thereto, to the injury or annoyance of persons living in the vicinity; nor shall the site or structures thereon be permitted to become dilapidated, unsightly or unsafe. Proven technological improvements as identified by the City Manager or his designee in industry standards of drilling and production in this area may be adopted as they become available if capable of reducing factors of dust, vibration and odor. (K) Electric lines. All electric lines shall be located in a manner compatible to those already installed in the surrounding area or subdivision. (L) Electric motors. Only electric prime motors shall be permitted for the purpose of pumping wells. No electric power shall be generated on location. All electrical installations and equipment shall conform to the city's ordinances and the appropriate national codes. (M) Emergency response plan. At the time of application of the special use permit, the operator shall submit to the City Manager or his designee, and the Fire Department, an emergency response plan establishing written procedures to minimize any hazard resulting from drilling, completion or production of gas wells. Said plan shall use existing guidelines established by the Commission, TCEQ, Texas Department of Transportation and/or the USEPA. The emergency response plan shall be kept current with any additions, modifications, and/or amendments concerning all construction related activities, natural gas operations and/or natural gas production. Updated plans shall be submitted to the City Manager or his designee, and the Fire Department, within two business days. A copy of the emergency response plan shall be kept on site. (N) Equipment painted. All production equipment on the site shall be painted and maintained at all times, including pump units, storage tanks, buildings and structures. (O) Explosives. Under no circumstances shall explosives of any type be used during any phase of drilling, re-drilling, working, re-working, deepening, re-entering, activating, converting, fracturing or completing the gas well without the prior consent of the Fire Department. The operator shall provide a notice to the City Manager or his designee and the Fire Department prior to such activities. The notice shall identify the date that the explosive charges will be used, the date and means of transporting the explosive charges and the transportation route to and from the drill and/or operation site that will be used for the delivery of the explosive charges. (P) Fire notice. In the event of a fire or discovery of a fire, smoke or unauthorized release of flammable or hazardous materials on any property, the operator shall immediately report such condition to the Fire Department in accordance with the city fire code. The reporting limits for hazardous materials release shall conform to the requirements of the Commission and not exceed any state or federal permitting limit. A copy of the hazardous materials release records required by the TCEQ shall be forwarded to the Fire Department on an annual basis. (Q) Fire prevention; sources of ignition. Fire fighting apparatus and supplies as approved by the Fire Department and required by any applicable federal, state or local law shall be provided by the operator, at the operator's cost, and shall be maintained on the drilling site at all times during drilling and production operations. The operator shall be responsible for the maintenance and upkeep of such equipment. Each well shall be equipped with an automated valve that closes the well in the event of an abnormal change in operating pressure. All well heads shall contain an emergency shut off valve to the well distribution line. (R) Fracing operations. All formation fracture stimulation operations shall be conducted during daylight hours unless the operator has notified and obtained permission from the City Manager or his designee for operations during nighttime hours. The following requirements shall apply to all fracture stimulation operations performed on a well: (1) At least 48 hours before operations are commenced, the operator shall post a sign, which complies with section 157.20 of this chapter, at the entrance of the well site advising the public of the date the operations will commence and an anticipated completion date. (2) A watchperson shall be required at all times during such operations. (3) At no time shall the well be allowed to flow or vent directly to the atmosphere without first directing the flow through separation equipment or into a portable tank. (S) Fresh water wells. It shall be unlawful to drill any well, the center of which, at the surface of the ground, is located within 200 feet to any existing fresh water well. The measurement shall be in a direct line from the closest well bore to the fresh water well bore. (1) The operator of a gas well shall provide the City Manager or his designee with a "pre-drilling" and "post-drilling" water analysis and flow rate from any existing fresh water well on-site, within 500 feet of the gas well. The operator of a gas well shall also provide the City Manager or his designee with a "pre-drilling" and a "post-drilling" water analysis from the fresh water well if the well is transferred to private or public use. (2) An operator may drill a fresh water well, in compliance with state law, to use for drilling and completion operations within 200 feet of the well bore, however, a well that is used for drilling and production operations is excluded from the 200-foot setback for future wells drilled on the permitted pad site. (3) A copy of the Texas Water Development Board permit shall be provided to the City Manager or his designee along with the geographic coordinates of every water well within 500 feet of the well bore. (4) A copy of all plugging and abandonment reports filed with the state and/or transfer of ownership notice shall be provided to the City Manager or his designee and the Department of Public Works. (T) Gas emission or burning restricted. No person shall allow, cause or permit gases to be vented into the atmosphere or to be burned by open flame except as provided by law or as permitted by the Commission. If the venting of gases into the atmosphere or the burning of gases by open flame is authorized as provided by law or as permitted by the Commission, then such vent or open flame shall not be located closer than 500 feet from any building not used in operations on the drilling site and such vent or open flame shall be screened in such a way as to minimize detrimental effects to adjacent property owners. (U) Gas lift compressor. Any on-site compressor used to "lift gas" shall be designed to comply with the noise requirements of this section. (V) Gas processing on site. Except for a conventional gas separator or line heater, no refinery, processing, treating, dehydrating or absorption plant of any kind shall be constructed, established or maintained on the premises without appropriate city permits and a certificate of occupancy. (W) Grass, weeds and trash. All drill and operation sites shall be kept clear of high grass, weeds, and combustible trash. (X) Hazardous plan. Hazardous Materials Management Plan (HMMP) and all material safety data sheets (MSDS) for all hazardous materials that will be located, stored, transported and/or temporarily used on the operations site shall be submitted to the City Manager or his designee, and the Fire Department. (Y) Installation of pipelines on, under or across public property. The operator shall apply to the city for a right-of-way use agreement on, over, under, along or across the city streets, sidewalks, alleys and other city property for the purpose of constructing, laying, maintaining, operating, repairing, replacing and removing pipelines. The operator shall: (1) Not interfere with or damage existing water, sewer or gas lines or the facilities of public utilities located on, under or across the course of such rights-of-way. (2) Furnish the Department of Public Works a site plan showing the location of such pipelines. (3) Construct such lines out of pipe in accordance with the city codes and general design standards. (4) Grade, level and restore such property to the same surface condition, as nearly as practicable, as existed prior to the laying of the pipeline. (Z) Lights. No person shall permit any lights located on any drill or operation site to be directed in such a manner so that they shine directly on public roads, adjacent property or property in the general vicinity of the operation site. To the extent practicable, and taking into account safety considerations, site lighting shall be directed downward and shielded so as to both prevent direct illumination of and minimize glare on public roads and adjacent dwellings and buildings within 600 feet. (AA) Muffling exhaust. Exhaust from any internal combustion engine, stationary or mounted on wheels, used in connection with the drilling of any well or for use on any production equipment shall not be discharged into the open air unless it is equipped with an exhaust muffler, or mufflers or an exhaust muffler box constructed of noncombustible materials sufficient to suppress noise and disruptive vibrations and prevent the escape of obnoxious gases, fumes or ignited carbon or soot. (BB) Noise restrictions for gas well permits. (1) During the drilling, re-drilling, working or re-working, no on-site activity shall produce a sound level greater than 78 dB(a) when measured at a distance of 300 feet from the drilling equipment in question. (2) During fracturing, no on-site activity shall produce a sound level greater than 85 dB(a) when measured at a distance of 300 feet from the drilling equipment in question. (3) During production, no on-site activity shall produce a sound level greater than 65 dB(a) when measured at a distance of 300 feet from an on-site equipment in question. (4) Sound level measurements shall be made with a sound level meter conforming, as a minimum, to the requirements of the American National Standards Institute (ANSI). (5) If sound levels exceed the dB(a) levels referenced in the subsection, the City Manager or his designee may require additional sound reducing techniques and devices including, but limited to, sound reducing mufflers. (CC) Organic solvents. Organic solvents, such as trichloroethylene and carbon tetrachloride, shall not be used for cleaning any element, structure or component of the drilling rig, platform, and/or associated equipment, tools or pipes. To the maximum extent practicable, high flash point Varsol shall be used. (DD) Pipe dope. Lead-free, biodegradable pipe dope shall be substituted for API specified pipe dope. (EE) Pits. All reserve pits, completion/workover pits, drilling fluid disposal pits, fresh makeup water pits, gas plant evaporation/retention pits, mud circulation pits or water condensation pits shall be lined with plastic or stored above ground in tanks. The water surface elevation of the pit may not exceed 12 inches above the existing ground elevation prior to any on-site construction of the pit. One foot of freeboard is required between the surface elevation and on top of berm. Such pits and contents shall be removed from the premises and the drilling site within 40 days after completion of the well, unless otherwise authorized by the City Manager or his designee. No washout pits shall be located with the city, unless all fluid, sludge, solid waste materials, drilling fluids, waste oil, spent completion fluids, all other liquids, semi-liquids, mud, including hazardous [material] inseparable by simple mechanical removal processes, and is made up primarily of natural material is immediately captured within a fully enclosed, above ground containment tank. (FF) Private roads and drill sites. Prior to the commencement of any drilling operations, all private roads used for access to the drill site and the operation site itself shall be at least 24 feet wide, have an overhead clearance of 14 feet, and shall be an all-weather hard surface and maintained to prevent dust, mud and rutting. In particular cases these requirements governing the surfacing of private roads may be altered at the discretion of the Department of Public Works after consideration of all circumstances including, but not limited to, the following: distances from public streets and highways, distances from adjoining and nearby property owners whose surface rights are not leased by the operation, the purpose for which the property of such owners is or may be used, topographical features, nature of the soil and exposure to wind. (GG) Public streets. No permit shall be issued for any well to be drilled within any of the streets or alleys of the city, and/or projected streets or alleys shown by the current thoroughfare plan of the city, and no street or alley shall be blocked, encumbered or closed due to any exploration, drilling or production operations unless prior consent is obtained from the Department of Public Works. Any consent from the Department of Public Works shall be temporary in nature and state the number of hours and/or days that any street or alley may be blocked, encumbered or closed. The site must not conflict with the city's thoroughfare plan. (HH) Salt water wells. No salt water disposal well shall be located within the city. (II) Signs. A sign shall be immediately and prominently displayed at the gate on the temporary and permanent site fencing erected pursuant to this section. Such sign shall be durable material, maintained in good condition and, unless otherwise required by the Commission, shall have a surface area of not less than 16 square feet with contrasting lettering not less than four inches tall and shall be lettered with the following: (1) Well name and number and site address. (2) Name of operator. (3) The emergency 911 number. (4) Twenty-four-hour telephone numbers of the operator responsible for the well who may be contacted in case of emergency. (5) Permanent weatherproof signs reading "DANGER NO SMOKING ALLOWED," in both English and Spanish shall be posted immediately upon completion of the well site fencing at the entrance of each well site and tank battery or in any other location approved or designated by the Fire Department of the city. Sign lettering shall be four inches in height and shall be red on a white background or white on a red background. Each sign shall include the emergency notification numbers of the Fire Department and the operator, well and lease designations required by the Commission. (JJ) Storage of equipment. On-site equipment storage is prohibited on the operation site. No equipment shall be stored on the drilling or production site, unless it is necessary to the everyday operation of the well. Lumber, pipes, tubing and casing shall not be left on the operation site except when drilling or well servicing operations are being conducted on the site. No vehicle or item of machinery shall be parked or stored on any street, right-of-way or in any driveway, alley or upon any operation site which constitutes a fire hazard or an obstruction to or interference with fighting or controlling fires except that equipment on the site. The Fire Department shall be the entity that determines whether equipment on the site shall constitute a fire hazard. No refinery, processing, treating, dehydrating or absorption plant of any kind shall be constructed, established or maintained on the premises. This shall include a conventional gas separator or dehydrator. (KK) Storage tanks. All tanks and permanent structures shall conform to the API specifications unless other or additional specifications are approved by the Fire Department. All storage tanks shall be equipped with a secondary containment system including lining with an impervious material. The secondary containment system shall be a minimum of three feet in height and one and one-half times the contents of the largest tank in accordance with the fire code, and buried at least one foot below the surface. Drip pots shall be provided at the pump out connection to contain the liquids from the storage tank. All tanks shall be set back pursuant to the standards of the Commission and the National Fire Protection Association. Each storage tank shall be equipped with a level control device that will automatically activate a valve to close the well in the event of excess liquid accumulation in the tank. No meters, storage tanks, separation facilities, or other aboveground facilities proposed in the floodplain shall be outside of the floodway and shall comply with the requirements for development in the Stormwater and Flood Protection Ordinance. (LL) Surface casing. Surface casing shall be run and set in full compliance with the applicable rules and regulations of the Commission. (MM) Tank battery facilities. Tank battery facilities shall be equipped with a remote load line and a lightning arrestor system. (NN) Tank specifications for gas well permit. All tanks and permanent structures shall conform to the API specifications unless other specifications are approved by the Fire Department. The top of the tanks shall be no higher than 12 feet above the terrain surrounding the tanks. (OO) Valves. Each well must have a shutoff valve to terminate the well's production. The Fire Department shall have access to the well site to enable it to close the shut-off valve in an emergency. (PP) Vehicle routes for gas well permits. Vehicles associated with drilling and/or production in excess of three tons shall be restricted to state arterials, and where local access is required, to those arterials, collectors and/or commercial routes designated on the city's thoroughfare plan. (QQ) Waste disposal. Unless otherwise directed by the Commission, all tanks used for storage shall conform to the following: The operator must use portable closed steel storage tanks for storing liquid hydrocarbons. Tanks must meet the API standards. All tanks must have a vent line, flame arrester and pressure relief valve. All tanks must be enclosed by a fence. Drilling mud, cuttings, liquid hydrocarbons and all other field waste derived or resulting from or connected with the drilling, re-drilling, working, re-working or deepening of any well shall be discharged into an above-ground, self-contained tank or a lined pit. All disposals must be in accordance with rules of the Commission and any other appropriate local, state or federal agency. Unless otherwise directed by the Commission and approved by the City Manager or his designee, waste materials shall be removed from the site and transported to an off-site disposal facility not less often than every 30 days. Water stored in on-site tanks shall be removed as necessary. All waste shall be disposed of in such a manner as to comply with the air and water pollution control regulations of the state, this section and any other applicable ordinance of the city. (RR) Watchman. The operator must keep a watchman or security personnel on the site during the drilling or re-working of a well when other workmen are not on the premises. (SS) Wellhead status after fracing. All wellheads waiting on completion, for a period greater than ten days, shall be: (1) Completed through the production casing flange with a metal plate or blind flange bolted across the head; and (2) Surrounded with a six-foot tall chain link fence having a gate and lock; and (3) The cellar shall be filled or closed; and (4) The Bradenhead shall be piped to the surface and open to the atmosphere or have an observable and adequate pressure gauge with operable test valve. (TT) Work hours. Site development, other than drilling and fracturing, shall be conducted only between 7:00 a.m. and 7:00 p.m., Monday through Saturday. Truck deliveries of equipment and materials associated with drilling and/or production, well servicing, site preparation and other related work conducted on the well site shall be limited to between the above same work hour restrictions except in case of fires, blowouts, explosions, and any other emergencies or where the delivery of equipment is necessary to prevent the cessation of drilling and production. The operator may request an exception from the City Council.
( Ordinance 3703 , § 1( Ordinance 3145 ), adopted 9/15/2015 )
Ask a question about Carrollton law
Corpus searches the Carrollton sections it holds and shows the ones that match, with their citations. Free, no sign-in.