§ 173.10 — Compliance inspection and sampling; right of entry
Code of Ordinances, City of Carrollton, Texas (Includes legislation through Ord. No. 4326 adopted September 1, 2026) · Carrollton City Code § 173.10
Corpus is an independent public-information project, not the official City of Carrollton website. Stable reference: corpuslaw.us/code/650919ec-26ae-400d-8a9c-0ad53f198902
§ 173.10: Compliance inspection and sampling; right of entry.
(A) The DCO shall have the right to enter the premises of any person discharging stormwater to the municipal separate storm sewer system (MS4), surface water in the state, or the waters of the U.S. to determine if the discharger is complying with all requirements of this chapter, and with any state or federal discharge permit, limitation, or requirement. Dischargers must allow the DCO ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and for the performance of any additional duties. (B) Dischargers must make available to the DCO upon request, and provide copies upon request of any SWPPP's, modifications thereto, self-inspection reports, monitoring records, compliance evaluations, Notices of Intent, and any other records, reports, and other documents related to compliance with this chapter and with any state or federal discharge permit. (C) Where a discharger has security measures in force that requires proper identification and clearance before entry into its premises, the discharger must make necessary arrangements with its security personnel so that, upon presentation of suitable identification, the DCO will be permitted to enter without delay for the purposes of performing his/her responsibilities. (D) The DCO shall have the right to install on the discharger's property, or require installation of, such devices as are necessary to conduct sampling, monitoring, and/or metering of the discharger's operations. Any tampering with such devices or interference with their activities shall be a violation of this chapter. (E) The DCO may require any discharger to the MS4, surface water in the state, or the waters of the U.S. to conduct specified sampling, testing, analysis, and other monitoring of its stormwater discharges, or activities which may impact the discharges, and may specify the frequency and parameters of any such required monitoring. (F) The DCO may require the discharger to install monitoring equipment as necessary at the discharger's expense. The facility's sampling and monitoring equipment must be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure stormwater flow and quality must be calibrated to ensure their accuracy. To assure the validity of required data gathering, the DCO may specify that approved components be used, such as, but not limited to, equipment, methodologies, quality control and services. (G) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled must be promptly removed by the discharger at the written or verbal request of the DCO and may not be replaced. The costs of clearing such access will be borne by the discharger. (H) Unreasonable delays in allowing the DCO access to any part of the discharger's premises are a violation of this chapter. Any delay of access of more than five minutes during reasonable business hours for routine inspection and sampling, or of more than 15 minutes at other times for the purpose of investigating spills or discharges that require immediate abatement, shall be considered obstruction of this section 173.10.
( Ordinance 3308 , adopted 7/7/2009 )
Ask a question about Carrollton law
Corpus searches the Carrollton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
