§ 57.09: Construction standards.

(A) No person shall construct or install, or cause to be constructed or installed, facilities within the right-of-way which constitute a threat or hazard to public safety, either for vehicular or pedestrian traffic. (B) Unless otherwise specifically allowed in writing by the Director, all excavations within the right-of-way shall be filled and compacted within 24 hours of excavation, and pavements of streets, alleys and sidewalks shall be completely restored within 14 days of excavation. (C) The Director must be notified 24 hours in advance that construction is ready to proceed, by either the right-of-way user or user's contractor or representative. Notification shall include the reference number assigned to excavation by the on-call system. (D) All construction shall be in conformance with all city codes and applicable local, state and federal laws. (E) Three-foot by three-foot information signs, stating the identity of the person doing the work on the facilities, telephone number and user's identity and telephone number, shall be placed in the right-of-way on each approach to the location where construction is to occur 24 hours prior to the beginning of work in the right-of-way, and shall continue to be posted at the location during the entire time the work is occurring. (F) Erosion control measures and advance warning signs, markers, cones and barricades must be in place before work begins. (G) Reflective barricades and flashing lights must be restored at the end of each day. (H) Without affecting any contractual relationship between the user and its contractors, the right-of-way user shall be responsible for the workmanship and any damages by their contractors and subcontractors. A responsible representative of the user will be available to the Director at all times during construction. (I) The right-of-way user shall be responsible for storm water management and erosion control that complies with city, state and federal guidelines. Requirements shall include, but not be limited to, silt fencing in erosion areas until vegetation is restored, barricade fencing around open holes, and high erosion areas will require wire-backed silt fencing. (J) User or user's contractor or subcontractor shall notify the Director immediately of any damage to other utilities, whether owned by city or privately-owned. (K) User must not interfere with city utilities, in particular, gravity-dependent facilities. (L) When a street, alley or sidewalk cut is required, prior approval must be obtained by the Director and all of the Director's requirements shall be followed. Repair of all street, alley and sidewalk removals must be made promptly to avoid safety hazards to vehicle and pedestrian traffic. (M) Cutting or excavation of street, alley or sidewalk surfaces that are less than three years old is prohibited, unless approved by Director. (N) All directional boring shall have locator place bore marks and depths while bore is in progress. Locator shall place mark at each stem with paint dot and depth at least every other stem. (O) Lane closures in school zones or on streets other than residential streets shall be limited to after 8:30 a.m. and before 4:00 p.m., unless prior approval is obtained from the Director. Arrow boards will be required on lane closures, with all barricades, advanced warning signs and reflector cones placed according to the specifications of the city's General Design Standards and Part 6 of the Texas Manual on Uniform Traffic Control Devices. (P) Working hours in the rights-of-way not involving traffic lane closures are 7:00 a.m. to 6:00 p.m., Monday through Friday. Work which must be performed before 7:00 a.m. or after 6:00 p.m. Monday through Friday must be approved by the Director in advance. Any work performed outside the above work hours must be approved 24 hours in advance by the Director. Directional boring is permitted only Monday through Friday, 7:00 a.m. to 6:00 p.m., unless approved by the Director in advance. No work may be done, except for emergencies, on city holidays. (Q) Users are responsible for obtaining line locations from all affected utilities at least 48 hours prior to any excavation. (R) Right-of-way user will be responsible for verifying both the horizontal and vertical location of all affected facilities, whether by pot holing, hand digging, or other method approved by the Director, prior to any excavation or boring, with the exception of work involving lane closures, as discussed above. (S) Placement of all handholes, manholes or other access facilities must be approved in advance by the Director.

( Ordinance 2490 , adopted 2/15/2000 )