§ 10.4 — Specific Enforcement and Penalties for Flood Hazard Protection
Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, App. A, § 10.4
Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/993a78b6-b38d-46d4-ae10-68e992228873
Sec. 10.4. - Specific Enforcement and Penalties for Flood Hazard Protection.
A. Notification of Noncompliance. If at any time development takes place for which an approved development permit has not been issued, or development occurs which does not conform to the plans and specifications upon which the issued development permit was based, the Administrator or their designee shall issue a written notice of noncompliance to the owner. The notice shall give a specific time allowance to the owner during which he must take one (1) of the following steps to bring the development into compliance with this UDO: 1. An acceptable application for a development permit must be filed with the Development Engineer for the entire scope of development taking place or proposed for the site; 2. The item or items which are not in compliance with the terms, conditions, and provisions of this UDO shall be corrected, added, or improved until they comply with this UDO, at which time the owner shall request, in writing, a re-inspection by the Development Engineer; 3. Modified construction plans shall be submitted to the Development Engineer which detail, in an acceptable manner, the remedial, additional, or corrective measures which must be taken to bring the development within the provisions and requirements of this UDO; or 4. An acceptable variance request, subject to the provisions of this UDO, shall be submitted to the Administrator which shall have the effect, if granted, of removing the requirements for which the development was determined to be in noncompliance. The time allotment for these actions shall be reasonable and shall be determined according to the number, nature, and severity of the non-complying items. In no case shall that period exceed thirty (30) calendar days from the date of notification. If, in the opinion of the Development Engineer, a condition exists which is hazardous to the immediate safety of the public, they may seek remedies outside the scope of this Section. B. Revocation or Suspension of Development Permit. Upon expiration of the time allotment for remedial or corrective measures, the Development Engineer shall take one (1) of the following courses of action: 1. If, in the opinion of the Development Engineer, the owner has made, or is making, a good faith effort to remedy the offending situation, the Development Engineer may extend the time allotment previously granted if such extension is requested by the owner; or 2. Where an approved development permit has been issued for the development, the Development Engineer shall suspend the development permit. Written notice of said suspension, along with the terms and requirements for reinstating the development permit, shall be delivered to the owner. Upon suspension of a development permit, all portions of the work being done on the property that is regulated by this UDO shall cease. These activities include but are not limited to grading, excavation, fill, berming, stripping, clearing, paving, placement of any storm sewer, drainage structure, inlet, or appurtenance thereto; any work within a defined area of special flood hazard, or placement of any structure, temporary or permanent, or any obstruction within the area of special flood hazard. 3. Upon finding that no approved development permit exists for the work or property in question or suspending an existing approved development permit, the Development Engineer shall issue a stop work order for all items of work on the subject property covered by this or other ordinances, any work permitted, licensed, or otherwise regulated by the City, or any work subject to inspection or approval by the City. The Development Engineer may enter the property to inspect and verify that the requirements of this UDO are being met. All notices required by this Section shall be served upon the parties concerned either personally or by certified mail, addressed to the individual contracting parties or permit holder(s), at the address given on the permit application. C. Penalty Imposed. Upon the finding of a violation of this UDO regarding flood hazard protection, the Development Engineer may file a complaint in the Municipal Court of the City of College Station against any person, firm, corporation, or other legal entity. In the event the judge finds any person, firm, corporation, or other legal entity to violate the terms, conditions, or requirements of this UDO, or provisions or conditions pursuant thereto, they shall find said person, firm, corporation, or other legal entity guilty of a misdemeanor; and upon conviction shall impose a fine pursuant to Chapter 1, General Provisions of the City of College Station Code of Ordinances. Prosecution under this provision shall not be a bar to any other relief for violation of this UDO. D. Fine Not Exclusive Penalty. In addition to a fine, the City may institute appropriate actions or proceedings at law or equity for the enforcement of the provisions of this UDO, or to correct violations thereof, and, if applicable, appropriate actions or proceedings at law or equity against any surety company, escrow holder, or any third party who has affirmatively acted as surety or guarantor for the faithful performance of the permit holder's work.
(Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023)
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.