§ 105-58 — Duties and responsibilities of the Administrator
Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, art. II, § 105-58
Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/61ae24a7-23a3-4a72-a2e5-c1dfca129b4a
Sec. 105-58. - Duties and responsibilities of the Administrator.
The duties and responsibilities of the Administrator shall include, but not be limited to, the following: (1) Maintain and hold open for public inspection all records pertaining to the provisions of this article; (2) Review, and approve or deny all applications for development permits, as required by this division, for compliance with the terms and provisions of this article; (3) Ensure that adequate inspection of construction permitted under the terms and provisions of this division are carried out in accordance with the permitted plan; (4) Maintain, update, and provide to interested parties at a reasonable cost the Bryan/College Station Unified Design Guidelines, Standard Details, and Technical Specifications; (5) Ensure that adequate maintenance of drainage pathways, including altered or relocated waterways, is provided such that capacity for carrying stormwater flows is maintained; (6) Provide interpretation, where required, of boundaries of areas of special flood hazard, location of floodway, and water surface elevations, when disputes arise during review. (The initial determination of the above is the responsibility of the engineer working on the particular project;) (7) Provide information to the Zoning Board of Adjustment, Municipal Court, or City Council, as applicable, on all variance requests, administrative appeals, enforcement actions, and proposed amendments to the Bryan/College Station Unified Design Guidelines, Standard Details, and Technical Specifications as required; (8) Review and utilize any acceptable new flood study data in accordance with the Bryan/College Station Unified Design Guidelines, Standard Details, and Technical Specifications; (9) Notify adjacent communities and the Texas Water Commission prior to any alteration or relocation of a watercourse, and submit evidence of notification to the Federal Insurance Administration; (10) Interpret the terms and provisions of this article, as required, as they apply to each project, in accordance with the stated purpose of this article; and (11) Review permits for proposed development to ensure that all necessary permits have been obtained from those Federal, State, or local governmental agencies (including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 USC 1334) from which prior approval is required.
(Code 2011 (Repub.), § 13-4(B))
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.
