Sec. 105-83. - Special provisions for areas of special flood hazard.
In all areas of special flood hazard the following requirements shall apply to all public and private developments: (1) All new construction, any substantial improvement to a structure, and appurtenances shall be securely anchored to prevent flotation, collapse or lateral movement; (2) All new construction, any substantial improvement to a structure, and appurtenances shall be constructed in such a manner as to minimize flood damage and provide adequate drainage; and all electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities shall be designed and/or located at least one foot above the base flood elevation so as to prevent water from entering or accumulating within the components during conditions of flooding; (3) New and replacement sanitary sewage systems, including, but not limited to, septic tanks and drain fields, package treatment plants, etc., shall be designed to minimize or eliminate infiltration of floodwaters into the system and discharges from the system into floodwaters; (4) New and replacement water supply systems, including wells, treatment plants, distribution facilities, etc., shall be designed to prevent infiltration of floodwaters into the system; (5) Solid or liquid waste disposal sites or systems shall be designed and located to avoid contamination from them during flooding and to avoid impairment of their operation during times of flooding; (6) All new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the base flood elevation. Certification that the applicable standards have been satisfied shall be submitted to the Administrator. Said certification shall bear the dated seal and signature of a registered professional engineer or registered professional land surveyor on the form provided by the Administrator; (7) All new construction or any substantial improvement of any commercial, industrial, or other nonresidential structure shall either have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the base flood elevation, or the structure with its attendant utility, ductwork, basement and sanitary facilities shall be floodproofed so that the structure and utilities, ductwork, basement and sanitary facilities shall be watertight and impermeable to the intrusion of water in all areas below the base flood elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Certification that the applicable standards have been satisfied shall bear the dated seal and signature of a registered professional engineer on the form provided by the Administrator; (8) For all new construction and substantial improvements, fully enclosed areas below the lowest floor that are used solely for parking of vehicles, building access or storage in an area other than a basement and that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following minimum criteria: A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of all openings shall be no higher than one foot above grade. Openings may be equipped with screens, louvers, or other coverings or devices, provided that they permit the automatic entry and exit of floodwaters; (9) In areas of special flood hazard where base flood elevations have not been established, base flood elevation data shall be generated for subdivision proposals and other proposed development, including manufactured home parks, which are greater than 50 lots or five acres, whichever is less; (10) In A1—30, AH, and AE Zones, or areas of special hazard, all recreational vehicles to be placed on a site must: a. Be elevated and anchored; b. Be on the site for less than 180 consecutive days; and c. Be fully licensed and highway ready; (11) Any new construction, substantial improvement to a structure or fill that encroaches into the special flood hazard area shall be prohibited unless it can be demonstrated that same will have no adverse impacts as set forth below. Certification of this shall be required as approved by the Administrator based upon a submitted engineering report that includes hydrologic and hydraulic analysis which conform to the requirements of this division and the Bryan College Station Unified Design Guidelines, Standard Details, and Technical Specifications. All submitted information required herein shall bear the dated seal and signature of a registered professional engineer: a. The engineering report shall demonstrate that such construction, improvement or fill creating the encroachment does not, at any time, cause any of the following upstream, within, near, adjacent, or downstream of such encroachment: 1. An increase in the base flood elevations. In the event that base flood elevations are not known at the time of submitting the information required herein, base flood elevations must be determined; 2. Creation of additional areas of special flood hazard area; 3. A loss of conveyance capacity to that part of the special flood hazard area that is not in the floodway and where the velocity of flow in the base flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; 4. A loss of base floodwater storage volume to the part of the special flood hazard area that is beyond the floodway and conveyance area where the velocity of flow in the base flood is equal to and less than one foot per second without acceptable compensation as set forth herein. Acceptable compensation for the loss of storage volume requires a demonstration of cuts and fills, must be mitigated on-site and must demonstrate no net fill. In general, excavation within the special flood hazard area and below the base flood elevation is the only acceptable method of mitigation of fill placed below the base flood elevation in the special flood hazard area; and 5. An increase in base flood velocities. In the event the future conditions flood data is known at the time of submittal, then the future conditions modeling must be used in lieu of the base flood modeling; b. In meeting the requirements set forth in Subsection (11)a of this section, if fill is proposed a certification of compaction of fill in accordance with FEMA Technical Bulletin 10-01 must be submitted; c. The following are exempt from Subsection (11)a of this section: 1. Lots where the adverse impacts are wholly contained: (i) On the subject property or only impacting the subject property and other property with same ownership; (ii) On a property where its owner joins the associated development permit application which causes, quantifies, and outlines the adverse impact defined above; (iii) Within a private drainage easement which is specified to be privately owned and maintained, and is recorded at the Brazos County Court House; (iv) Within public rights-of-way provided other requirements for use and encroachments within public rights-of-way as set forth elsewhere in this Code are met; or 2. Lots legally platted and recorded at Brazos County Court House prior to the adoption of the ordinance from which this division is derived, unless such plat is subsequently replatted, vacated or otherwise altered. However, an amending plat does not remove this exemption; (12) For all new construction, substantial improvement to a structure, or fill located within floodways, the following provisions apply in addition to the requirements of Subsection (11) of this section: a. A variance must be granted; however, proposed street and public utility encroachments shall be exempt from the requirement of a variance provided that the provisions Subsection (12)b of this section is satisfied; and b. It must be demonstrated as certified by a professional engineer that such construction, improvement or fill encroaching the floodway does not increase the base flood elevation. Such certification shall bear the dated seal and signature of the professional engineer; (13) The following are exempt from Subsections (11) and (12) of this section: a. Customary and incidental routine grounds maintenance, landscaping and home gardening provided same: 1. Does not increase the base flood elevation; 2. Does not create areas of special flood hazard upstream, within, nearby or downstream; and 3. Does not require a building permit, zone change request, or variance from the provisions of the Unified Development Ordinance (see App. A); b. Temporary emergency repairs deemed necessary for the preservation of life, health, or property, provided a permanent repair is done as soon as practicable; and provided that, to the maximum degree deemed reasonable and prudent by the City, such repair is made and maintained so as to minimize increasing water surface elevation and to minimize the creation of additional areas of special flood hazards. Certification of this shall be required on a form provided by the Administrator based upon a submitted engineering report that includes hydrologic and hydraulic analysis, conforms to the requirements of this division and the Bryan College Station Unified Design Guidelines, Standard Details, and Technical Specifications, and bears the dated seal and signature of a registered professional engineer; and c. Temporary excavation for the purpose of maintaining or repairing any public street, public utility facility including service lines related thereto, or any other public infrastructure, provided such area of excavation is returned as soon as practicable to its prior condition or better with respect to meeting the requirements set forth in this division; (14) Approved mitigation such as excavation must be properly approved and occur prior to any approved encroachment or fill is placed in the construction sequencing.
(Code 2011 (Repub.), § 13-5(E))