§ 107-73 — System-wide roadway impact fees

Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, art. II, § 107-73

Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/18c65e4a-04c5-4b4a-b4a2-3a09cfd1ee2b

Sec. 107-73. - System-wide roadway impact fees.

(a) Purpose. This section is intended to ensure the provision of adequate public facilities to serve new development in an identified service area by requiring each such development to pay its pro rata share of the costs of roadway improvements necessitated by and attributable to such new development as set forth herein and consistent with Texas Local Government Code ch. 395. (b) Authorization. (1) This section is adopted pursuant to Texas Local Government Code ch. 395 and other applicable law. Chapter 395 supplements this section to the extent that its provisions may be applicable hereto and, to such extent, its provisions are incorporated herein by reference. The provisions of this section shall not be construed to limit the power of the City to utilize other methods authorized under State law or pursuant to other City powers to accomplish the purposes set forth herein, either in substitution or in conjunction with this section. Guidelines may be developed by ordinance, resolution, or otherwise to implement and administer this section. (2) Impact fees established by this section are additional and supplemental to, and not in substitution of, any other requirements imposed by the City on the development or subdivision of land or the issuance of building permits. (c) Service area. There are four roadway service areas established for this section, consisting of land within the City limits as shown in the Roadway Impact Fee Update prepared by Kimley Horn, dated November 2021, and which is attached hereto as Exhibit O, incorporated herein for all purposes and a copy of which shall be made available to view at the City Secretary's Office along with a copy of the entire Study. (d) Land use assumptions. The land use assumptions for the impact fee imposed under this section upon which the Capital Improvements Plan for roadway facilities are based are as set forth in the Roadway Impact Fee Update prepared by Kimley Horn, dated November 2021, and which is attached hereto as Exhibits P-1 and P-2, incorporated herein for all purposes and a copy of which shall be made available to view at the City Secretary's Office along with a copy of the entire Study. (e) Capital Improvements Plan. The Capital Improvements Plan for this section identifying capital improvements for the provision of roadway services in the four service areas is as set forth in the Roadway Impact Fee Update prepared by Kimley Horn, dated November 2021, and which is attached hereto as Exhibit Q, incorporated herein for all purposes and a copy of which shall be made available to view at the City Secretary's Office along with a copy of the entire Study. (f) Service units. Service units used to determine the amount of impact fees under this section shall be expressed in terms of vehicle-mile which shall be the capacity consumed in a single lane in the p.m. peak hour by a vehicle making a trip one mile in length and as further described in the Roadway Impact Fee Update prepared by Kimley Horn, dated November 2021, a copy of which shall be made available to view at the City Secretary's Office. (g) Impact fee. In accordance with this section and based upon the land use assumptions and Capital Improvements Plan herein, calculations and other information presented in the study prepared by Kimley Horn, the maximum assessable impact fee per service unit for each service area for roadway impact fees shall be as set forth in Exhibit R, attached hereto, incorporated herein for all purposes and a copy of which shall be made available to view at the City Secretary's Office. The maximum assessable impact fee per service unit for each service area for roadway impact fees will be assessed in accordance with applicable state law and at the time set out below. No action is required by the City. In accordance with this section and based upon the land use assumptions and Capital Improvements Plan herein, there is hereby imposed a roadway impact fee collection rate per service unit for each service area for roadway impact fees as set forth in Exhibit S, attached hereto, incorporated herein for all purposes and a copy of which shall be made available to view at the City Secretary's Office. This roadway impact fee per service unit for each service area as set out in Exhibit S will be collected in accordance with applicable state law. However, the City may vary the rates of roadway impact fee per service unit for each service area to be collected, as set out in Section 107-74, to reasonably further goals and policies affecting the adequacy of roadway facilities serving new development or for other regulatory purposes affecting type, quality, intensity, economic development potential, or development timing of land uses. The roadway impact fee per service unit for each service area to be paid and collected shall be the amount listed in Exhibit S then in effect at the time of collection. (h) Assessment and collection. Assessment and collection of the impact fees established under this section shall be as set forth herein and in accordance with applicable State law. Assessment shall occur at the time the final plat is recorded when platting is required. If platting is not required, assessment shall occur at the earliest time allowed by law or by agreement as allowed by law. (i) Credits. The City may credit the contribution of land, construction of improvements or funding for construction of any capital improvement that is a part of the Capital Improvements Plan adopted under this section or that otherwise affects it and that is required or agreed to by the City, pursuant to rules established in this section or pursuant to administrative guidelines promulgated by the City which may be amended from time to time. In determining such credit, the maximum impact fee set forth in Exhibit R may be used to assist in approximating and determining the appropriate roadway contributions related to new development. It is expressly declared that where the roadway impact fee collected is less than the maximum, same shall not automatically create a credit equal to the maximum impact fee, nor automatically create an exception to other applicable rules and regulations. (j) Accounting. Funds collected through the adoption of the impact fees set forth in this section shall be deposited in interest-bearing accounts clearly identifying the category of capital improvements or facility expansions within the service area for which the fee is adopted. (k) Certification. The City Council certifies that none of the impact fees under this section will be used or expended for an improvement or expansion not identified in the Capital Improvements Plan. (l) Impact fee waivers or reductions for housing affordability. Roadway impact fees may be waived or reduced for the purpose of promoting affordability in housing in accordance with state law and pursuant to administrative guidelines promulgated by the City which may be amended from time to time. Exhibit O: Service Areas for City-Wide Roadway Impact Fees [image omitted; see the official code] Exhibit P-1: Land Use Assumptions for City-Wide Roadway Impact Fees Table 1. Residential and Nonresidential/Employment 10-Year Projections Residential | Nonresidential/Employment Service Area | Single Family | Multi-Family | Basic | Service | Retail Dwelling Units | Square Feet A | 410 | 2,038 | - | 1,174,000 | 1,480,000 B | 429 | 1,937 | 350,000 | 1,063,000 | 953,000 C | 1,824 | 127 | - | 506,000 | 469,000 D | 693 | 751 | 984,000 | 1,089,000 | 895,000 Sub-Total | 3,356 | 4,853 | 1,334,000 | 3,832,000 | 3,797,000 Total | 8,209 | 8,963,000 Exhibit P-2: Growth in Vehicle Miles for System-Wide Roadway Impact Fees Roadway Service Area | Vehicle Miles of Demand Generated A | 18,125 B | 15,945 C | 12,076 D | 16,625 Exhibit Q: Capital Improvement Plans for City-Wide Roadway Impact Fees 10-Year Roadway Impact Fee Capital Improvements Plan—Service Area A Service Area | Proj. # | Class | Roadway | Limits | Length (mi) | % In Service Area | Total Project Cost | Cost in Service Area A | A-1 | 4 LANE MINOR ARTERIAL | GEORGE BUSH DRIVE E | DOMINIK DRIVE TO HARVEY ROAD | 0.29 | 100% | $ 2,409,500 | $ 2,409,500 A-2 | 2 LANE MAJOR COLLECTOR | LASSIE LANE | STERLING STREET TO MANUEL DRIVE | 0.06 | 100% | $ 860,066 | $ 860,066 A-3 | 2 LANE MAJOR COLLECTOR | DARTMOUTH STREET | 720' S OF HARVEY MITCHELL PARKWAY S TO TEXAS AVENUE S | 0.42 | 100% | $ 2,423,520 | $ 2,423,520 A-4 | 4 LANE MAJOR ARTERIAL - TxDOT | HARVEY ROAD | SH 6 NBFR TO BOONVILLE ROAD | 2.29 | 100% | $ 2,509,696 | $ 2,509,696 A-5, D-1 | 4 LANE MAJOR ARTERIAL | ROCK PRAIRIE ROAD | SH 6 NBFR TO STONEBROOK DRIVE | 0.41 | 50% | $ 2,164,000 | $ 1,082,000 A-6, D-2 | 4 LANE MAJOR ARTERIAL | ROCK PRAIRIE ROAD | STONEBROOK DRIVE TO TOWN LAKE DRIVE | 0.59 | 50% | $ 5,136,000 | $ 2,568,000 A-7, D-8 | 4 LANE MAJOR ARTERIAL | BIRD POND ROAD | ROCK PRAIRIE ROAD TO 1055' E OF ROCK PRAIRIE ROAD | 0.20 | 50% | $ 1,758,000 | $ 879,000 1 | UNIVERSITY DRIVE E AND UNIVERSITY TOWNE CENTER SIGNAL | 100% | $ 400,000 | $ 400,000 2 | HARVEY MITCHELL PARKWAY S AND DARTMOUTH STREET | 100% | $ 566,992 | $ 566,992 3 | TEXAS AVENUE S AND BROTHERS BOULEVARD | 50% | $ 397,476 | $ 198,738 Service Area Project Roadway Cost Subtotal Service Area Project Intersection Cost Subtotal 2021 Roadway Impact Fee Study Cost Per Service Area | $ 12,731,782 $ 1,165,730 $ 17,500 Total Cost in SERVICE AREA A | $ 13,915,012 Note: The 10-Year Roadway Impact Fee CIP is not in a prioritized order. These are planning level cost projections. [image omitted; see the official code] 10-Year Roadway Impact Fee Capital Improvements Plan—Service Area B Service Area | Proj. # | Class | Roadway | Limits | Length (mi) | % In Service Area | Total Project Cost | Cost in Service Area B | B-1 | 4 LANE MINOR ARTERIAL | F & B ROAD | 160' E OF TURKEY CREEK ROAD TO HARVEY MITCHELL PARKWAY S | 0.49 | 100% | $ 4,106,520 | $ 4,106,520 B-2 | 4 LANE MINOR ARTERIAL (1/2) | LUTHER STREET W | HARVEY MITCHELL PARKWAY TO JONES BUTLER ROAD | 0.68 | 100% | $ 2,903,600 | $ 2,903,600 B-3, C-1 | 4 LANE MINOR ARTERIAL | ROCK PRAIRIE ROAD WEST | 715' W OF TOWERS PARKWAY TO WELLBORN ROAD | 0.63 | 50% | $ 4,659,868 | $ 2,329,934 B-4, C-2 | 6 LANE MAJOR ARTERIAL | ROCK PRAIRIE ROAD | NORMAND DRIVE TO SH 6 | 0.48 | 50% | $ 4,017,530 | $ 2,008,765 B-5 | 2 LANE MAJOR COLLECTOR | TURKEY CREEK ROAD | 75' N OF RAYMOND STOTZER PARKWAY WBFR TO RAYMOND STOTZER PARKWAY WBR | 0.53 | 100% | $ 3,278,140 | $ 3,278,140 B-6 | 6 LANE MAJOR ARTERIAL - TxDOT | HARVEY MITCHELL PARKWAY S | RAYMOND STOTZER PARKWAY TO WELLBORN ROAD | 2.62 | 100% | $ 1,407,527 | $ 1,407,527 B-7 | 4 LANE MINOR ARTERIAL | PENBERTHY ROAD | GEORGE BUSH DRIVE TO LUTHER STREET W | 0.4 | 100% | $ 3,080,683 | $ 3,080,683 B-8 | 6 LANE MAJOR ARTERIAL - TxDOT | WELLBORN ROAD | GEORGE BUSH DRIVE TO 940' N OF HARVEY MITCHELL PARKWAY S | 1.23 | 100% | $ 1,486,464 | $ 1,486,464 B-9 | 2 LANE MAJOR COLLECTOR | JONES BUTLER ROAD | HARVEY MITCHELL PARKWAY S TO HOLLEMAN DRIVE S | 0.22 | 100% | $ 9,652,780 | $ 9,652,780 B-10 | 4 LANE MINOR ARTERIAL | HOLLEMAN DRIVE S | N DOWLING ROAD TO 290' S OF ROCK PRAIRIE ROAD W | 1.62 | 100% | $ 10,631,012 | $ 10,631,012 3 | TEXAS AVENUE S AND BROTHERS BOULEVARD | 50% | $ 397,476 | $ 198,738 4 | WELLBORN ROAD AND GEORGE BUSH DRIVE | 100% | $ 1,190,232 | $ 1,190,232 5 | WELLBORN ROAD AND HOLLEMAN DRIVE | 100% | $ 644,445 | $ 644,445 6 | WELLBORN ROAD AND DEACON DRIVE | 100% | $ 4,532,013 | $ 4,532,013 7 | HOLLEMAN DRIVE W AND JONES BUTLER ROAD | 100% | $ 572,000 | $ 572,000 8 | LONGMIRE DRIVE AND PONDEROSA DRIVE | 100% | $ 350,000 | $ 350,000 Service Area Project Roadway Cost Subtotal Service Area Project Intersection Cost Subtotal 2021 Roadway Impact Fee Study Cost Per Service Area | $ 40,885,425 $ 7,487,428 $ 17,500 Total Cost in SERVICE AREA B | $ 48,390,353 Note: The 10-Year Roadway Impact Fee CIP is not in a prioritized order. These are planning level cost projections. [image omitted; see the official code] 10-Year Roadway Impact Fee Capital Improvements Plan—Service Area C Service Area | Proj. # | Class | Roadway | Limits | Length (mi) | % In Service Area | Total Project Cost | Cost in Service Area C | B-3, C-1 | 4 LANE MINOR ARTERIAL | ROCK PRAIRIE ROAD WEST | 715' W OF TOWERS PARKWAY TO WELLBORN ROAD | 0.63 | 50% | $ 4,659,868 | $ 2,329,934 B-4, C-2 | 6 LANE MAJOR ARTERIAL | ROCK PRAIRIE ROAD | NORMAND DRIVE TO SH 6 | 0.48 | 50% | $ 4,017,530 | $ 2,008,765 C-3 | 4 LANE MINOR ARTERIAL | BARRON ROAD | WS PHILLIPS PARKWAY TO DECATUR DRIVE | 1.39 | 100% | $ 5,795,317 | $ 5,795,317 C-4 | 4 LANE MINOR ARTERIAL | CAPSTONE DRIVE | 1265' W OF WELLBORN ROAD TO WELLBORN ROAD | 0.24 | 100% | $ 2,765,575 | $ 2,765,575 C-5 | 4 LANE MINOR ARTERIAL | BARRON ROAD | WELLBORN ROAD TO WS PHILLIPS PARKWAY | 0.49 | 100% | $ 4,712,977 | $ 4,712,977 C-6 | 4 LANE MINOR ARTERIAL | GREENS PRAIRIE ROAD | 820' W OF WS PHILLIPS PARKWAY TO ARRINGTON ROAD | 1.43 | 100% | $ 10,550,324 | $ 10,550,324 C-7 | 4 LANE MINOR ARTERIAL | GREENS PRAIRIE ROAD | WELLBORN ROAD TO 1290' E OF CREEK MEADOW BOULEVARD N | 1.27 | 100% | $ 8,918,740 | $ 8,918,740 C-8 | 4 LANE MAJOR ARTERIAL | TOWERS PARKWAY | ROCK PRAIRIE ROAD W TO WELLBORN ROAD | 1.00 | 100% | $ 10,030,680 | $ 10,030,680 C-9 | 4 LANE MAJOR ARTERIAL - TxDOT | WELLBORN ROAD | CAPSTONE DRIVE TO 540' S OF GREENS PRAIRIE ROAD | 2.36 | 100% | $ 2,407,328 | $ 2,407,328 C-10 | 4 LANE MINOR ARTERIAL (1/2) | WS PHILLIPS PARKWAY | BARRON ROAD TO GREENS PRAIRIE ROAD | 1.31 | 100% | $ 5,844,160 | $ 5,844,160 C-11 | 4 LANE MINOR ARTERIAL (50%) | WS PHILLIPS PARKWAY | GREENS PRAIRIE ROAD TO ARRINGTON ROAD | 1.55 | 100% | $ 7,311,480 | $ 7,311,480 C-12 | 4 LANE MINOR ARTERIAL (50%) | ROYDER ROAD EXTENSION | I-GN ROAD TO WELLBORN ROAD | 0.22 | 100% | $ 3,360,000 | $ 3,360,000 C-13 | 4 LANE MINOR ARTERIAL | ROYDER ROAD | WELLBORN ROAD TO 885' S OF GREENS PRAIRIE ROAD | 1.03 | 100% | $ 7,686,614 | $ 7,686,614 C-14 | 2 LANE MAJOR COLLECTOR | VICTORIA AVENUE | SOUTHERN PLANTATION DRIVE TO WILLIAM D. FITCH PARKWAY | 0.48 | 100% | $ 1,973,927 | $ 1,973,927 9 | GRAHAM ROAD AND VICTORIA AVENUE | 0.00 | 100% | $ 350,000 | $ 350,000 10 | BARRON ROAD AND ALEXANDRIA AVENUE | 0.00 | 100% | $ 320,994 | $ 320,994 11 | BARRON ROAD AND DECATUR DRIVE | 0.00 | 100% | $ 350,000 | $ 350,000 12 | BARRON ROAD AND LONGMIRE DRIVE | 0.00 | 100% | $ 350,000 | $ 350,000 13 | LONGMIRE DRIVE AND EAGLE AVENUE | 0.00 | 100% | $ 350,000 | $ 350,000 14 | WILLIAM D. FITCH PARKWAY AND VICTORIA AVENUE SIGNAL | 0.00 | 100% | $ 816,249 | $ 816,249 Service Area Project Roadway Cost Subtotal Service Area Project Intersection Cost Subtotal 2021 Roadway Impact Fee Study Cost Per Service Area | $ 75,695,821 $ 2,537,243 $ 17,500 Total Cost in SERVICE AREA C | $ 78,250,564 Note: The 10-Year Roadway Impact Fee CIP is not in a prioritized order. These are planning level cost projections. [image omitted; see the official code] 10-Year Roadway Impact Fee Capital Improvements Plan—Service Area D Service Area | Proj. # | Class | Roadway | Limits | Length (mi) | % In Service Area | Total Project Cost | Cost in Service Area D | A-5, D-1 | 4 LANE MAJOR ARTERIAL (1/2) | ROCK PRAIRIE ROAD | SH 6 NBFR TO STONEBROOK DRIVE | 0.41 | 50% | $ 2,164,000 | $ 1,082,000 A-6, D-2 | 4 LANE MAJOR ARTERIAL | ROCK PRAIRIE ROAD | STONEBROOK DRIVE TO TOWN LAKE DRIVE | 0.59 | 50% | $ 5,136,000 | $ 2,568,000 D-3 | 4 LANE MAJOR ARTERIAL | ROCK PRAIRIE ROAD | TOWN LAKE DRIVE TO WILLIAM D. FITCH PARKWAY | 1.89 | 100% | $ 17,245,000 | $ 17,245,000 D-4 | 4 LANE MINOR ARTERIAL | MIDTOWN DRIVE | MEDICAL AVENUE TO 990' E OF MEDICAL AVENUE | 0.19 | 100% | $ 1,028,820 | $ 1,028,820 D-5 | 4 LANE MINOR ARTERIAL (1/2) | MIDTOWN DRIVE | 990' E OF MEDICAL AVENUE TO 800' S OF TOWN LAKE DRIVE | 0.43 | 100% | $ 4,535,000 | $ 4,535,000 D-6 | 2 LANE MAJOR COLLECTOR | MIDTOWN DRIVE | 800' S OF TOWN LAKE DRIVE TO 2605' S OF CORPORATE PARKWAY | 0.98 | 100% | $ 5,374,808 | $ 5,374,808 D-7 | 2 LANE MAJOR COLLECTOR | DURHAM DRIVE | MIDTOWN DRIVE TO ROCK PRAIRIE ROAD | 0.4 | 100% | $ 981,960 | $ 981,960 A-7, D-8 | 4 LANE MAJOR ARTERIAL | BIRD POND ROAD | ROCK PRAIRIE ROAD TO 1055' E OF ROCK PRAIRIE ROAD | 0.2 | 50% | $ 1,758,000 | $ 879,000 D-9 | 4 LANE MINOR ARTERIAL (50%) | TOWN LAKE DRIVE | SH 6 NBFR TO MIDTOWN DRIVE | 0.37 | 100% | $ 1,753,000 | $ 1,753,000 D-10 | 2 LANE MAJOR COLLECTOR | CORPORATE PARKWAY | SH 6 NBFR TO MIDTOWN DRIVE | 0.26 | 100% | $ 1,436,192 | $ 1,436,192 D-11 | 2 LANE MAJOR COLLECTOR | CORPORATE PARKWAY | MIDTOWN DRIVE TO WILLIAM D. FITCH PARKWAY | 1.21 | 100% | $ 9,894,000 | $ 9,894,000 D-12 | 4 LANE MINOR ARTERIAL (1/2) | PEBBLE CREEK PARKWAY | ROYAL ADELADE DRIVE TO ST ANDREWS DRIVE | 0.38 | 100% | $ 2,137,000 | $ 2,137,000 D-13 | 4 LANE MINOR ARTERIAL (50%) | PEBBLE CREEK PARKWAY | ST ANDREWS DRIVE TO 275' S OF LONE STAR LANE | 1.96 | 100% | $ 9,181,000 | $ 9,181,000 D-14 | 2 LANE MAJOR COLLECTOR | LAKEWAY DRIVE | 1645' S OF GATEWAY BOULEVARD TO SH 6 NBFR | 1.02 | 100% | $ 2,635,080 | $ 2,635,080 D-15 | 2 LANE MAJOR COLLECTOR | MATHER PARKWAY | NANTUCKET DRIVE TO 1920' S OF NANTUCKET DRIVE | 0.36 | 100% | $ 882,000 | $ 882,000 D-16 | 4 LANE MINOR ARTERIAL (50%) | NANTUCKET DRIVE | SH 6 NBFR TO PEBBLE CREEK PARKWAY | 1.22 | 100% | $ 5,877,000 | $ 5,877,000 D-17 | 2 LANE MAJOR COLLECTOR | NANTUCKET DRIVE | PEBBLE CREEK PARKWAY TO SOUTHERN POINTE PARKWAY | 1.2 | 100% | $ 3,083,220 | $ 3,083,220 D-18 | 4 LANE MINOR ARTERIAL (50%) | SOUTHERN POINTE PARKWAY | 205' W OF PIPELINE ROAD TO 280' E OF NANTUCKET DRIVE | 0.87 | 100% | $ 3,902,000 | $ 3,902,000 Service Area Project Roadway Cost Subtotal Service Area Project Intersection Cost Subtotal 2021 Roadway Impact Fee Study Cost Per Service Area | $ 74,475,080 $ — $ 17,500 Total Cost in SERVICE AREA D | $ 74,492,580 Note: The 10-Year Roadway Impact Fee CIP is not in a prioritized order. These are planning level cost projections. [image omitted; see the official code] Exhibit R: Maximum Fee Per Service Unit for Roadway Impact Fees Service Areas | Maximum Assessable Roadway Impact Fee Per Service Unit Final Plat Recorded Prior to 01/01/2022 | Final Plat Recorded On or After 01/01/2022 Service Area A | $ 1,061 | $ 499 Service Area B | $ 1,072 | $ 1,261 Service Area C | $ 2,556 | $ 2,127 Service Area D | $ 4,004 | $ 3,452 Exhibit S: Collection Rate Per Service Unit for Roadway Impact Fees Service Areas | Building Permit Application Date 03/01/2022 - 12/31/2023 | 01/01/2024 - 12/31/2024 | 01/1/2025 - 12/31/2025 | On or After 01/01/2026 Land Use Type | Land Use Type | Land Use Type | Land Use Type Residential | Non-Residential | Residential | Non-Residential | Residential | Non-Residential | Residential | Non-Residential Platted Before 01/01/2022 | Platted On or After 01/01/2022 | Platted Before 01/01/2022 | Platted On or After 01/01/2022 Zone A | $438.83 | $80 | $499 | $80 | $499 | $499 | $80 | $499 | $499 | $80 Zone B | $438.83 | $80 | $897 | $80 | $1,072 | $1,163 | $80 | $1,072 | $1,261 | $80 Zone C | $438.83 | $80 | $897 | $80 | $1,163 | $1,163 | $80 | $1,514 | $1,514 | $80 Zone D | $438.83 | $80 | $897 | $80 | $1,163 | $1,163 | $80 | $1,514 | $1,514 | $80

(Ord. No. 2016-3840, pt. 1(15-8), 11-10-2016; Ord. No. 2021-4315, Pt. 1(Exh. A), 11-22-2021, effective 1-1-2022; Ord. No. 2021-4316, Pt. 1(Exh. A), 11-22-2021, effective 1-1-2022; Ord. No. 2023-4452, Pt. 1(Exh. C), 7-27-2023)