Sec. 14-67. - Permit period and renewal.
(a) Permit period. A permit shall be issued for one year. At the end of such time, it shall be updated (if operator wishes to continue the oil or gas operation) by filing a renewal application. The operator must reapply during the permit period for a renewal application if a change of operations is proposed or takes place. Multiple wells on one drill site are encouraged. (b) Renewal. (1) Period. The operator will submit an application form for a renewal permit no later than 30 days before the expiration of the operator's permit, and indicate in the application what changes are requested at the oil or gas operations site. An inspection and renewal fee established in Section 2-117 shall be paid at the time of reapplication. The operator recognizes the reclassification of a permit from rural to urban may occur due to adjacent development. (2) Application requirements. Renewal applications shall include any of the following items which have changed since the original permit application, which shall be current and updated, as applicable, to cover the renewal period: a. Renewal application fee established in Section 2-117; b. Independent contract Inspector retainer fee; c. Production site plan. Site plan of any proposed operational changes showing the location of all improvements, modifications, and equipment; ensure fencing complies, equipment is well-maintained and painted, and site is clean under article requirements; d. Transportation route plan. Map showing any changes to the previously approved transportation route within the City including all streets and roads for the passage of equipment, chemicals, production, including pipelines, or waste products produced by the oil or gas operation; e. Water sources. Description, location, and source of any new water sources for all oil or gas operations, and if proposed, a plan for recycling flowback and produced water; f. Water analyses. Annual post-drilling water testing and analyses (if applicable); g. Hazardous materials management plan. A copy of the hazardous materials management plan and all material safety data sheets (MSDSs) for all hazardous materials located, stored, transported, and/or temporarily used on the oil or gas operations site shall be provided to the Fire Chief; h. Emergency response plan. A copy of the Emergency Response Plan and any other emergency or response plans shall be provided to the Fire Chief; i. Emergency contacts. Confirm and update the emergency contact information on permanent weatherproof signs; j. Air quality monitoring plan. A copy of the air quality monitoring plan; k. Surrounding area map. Location and description of all improvements and structures (including water wells) within 1,000 feet of the drill site or oil or gas operations site; l. Security instrument. Current security instrument comprising an irrevocable letter of credit, indemnity bond, or certificate of deposit, as required by this division and in an amount determined by the City Engineer or the Council; m. Mineral lessee name and address; n. Operator/applicant name and address; o. Surface owner name and address; p. Name and address, including facsimile and electronic mail address, of an individual designated to receive notice; q. Insurance. Evidence of current insurance information as required by this division; and r. Operator's certification of application. Statement under oath signed by the operator which items have not changed and that the information submitted in the renewal application is true and correct. (3) Inspection. Before the expiration of the permit, the City Oil and Gas Inspector shall inspect the oil or gas operations site to determine compliance with this article. (4) Process. If no change in operations is proposed or has taken place and inspection reveals compliance with the ordinance in effect at the time of the original permit or this article during the preceding permit period, the City Engineer shall issue a renewal permit. Otherwise the renewal application shall be processed as an original application. (5) Remedial conditions. Upon application for a renewal permit, the City Oil and Gas Inspector may consider the deterioration of the quality of the material of which such facility or structure is constructed, rust and its appearance, and recommend repainting or other remedial steps to be taken as a condition of renewal. (6) Notice of changes. If any change or addition to the permit information on the application occurs, such change or addition during the period of the permit shall be communicated to the City Engineer within ten days of such change or addition.
(Code 2011 (Repub.), § 4-13(L); altered in 2017 recodification)
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.