For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-99 — Urban permit

Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Code of Ordinances § 14-99

Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/17b08742-0248-4e44-be7c-05b6a57e7864

Sec. 14-99. - Urban permit.

(a) Process. The City Engineer shall review urban permit applications and shall retain a consultant at the expense of the operator to review the environmental constraints study of the site that identifies potential wetlands and threatened and endangered species; a preliminary review of the need for any site-specific Corps of Engineers permits; and the permit application for the proposed site, and proposed operations or drilling program; the air quality monitoring plan; and at the direction of the City Engineer, draft recommended additional restrictions or conditions to be appended to the urban permit, if issued, including minimum setback and separation distances for drilling or other operations, special safety equipment and procedures, and prohibited operations or techniques. Consultant may recommend additional noise reduction levels and noise and light attenuation screening where deemed appropriate. The consultant's study shall be completed and delivered to the City Engineer and operator within 45 days after the application is submitted. (b) Notice. Before consideration of an urban permit application by the City Council, the City Engineer shall cause the following notices of public hearing to be issued, at the operator's expense, no later than two weeks before the regular Council meeting in which the public hearing will be held: (1) Notice of the public hearing shall be published in a newspaper of general circulation in the City. (2) Notice of the public hearing shall be made to all persons with property within 1,000 feet of the proposed oil or gas operations site as shown by the latest Brazos County Appraisal District certified tax rolls, by certified mail, return receipt requested. The operator shall pay the City the fee established in Section 2-117 for each such notification letter. No notification letter shall be required for property owners who have signed and acknowledged before a Notary Public the consent form acceptable to the City. (c) Council action. After the public hearing, Council, in its sole discretion, may approve or deny the permit based upon the recommendations submitted or may add, remove or waive any conditions not deemed a nuisance or necessitated by the health, safety, and welfare of the public, whether or not they are included in the consultant's recommendations. (d) Public hearing. At the public hearing, the recommendation of the City Engineer shall be presented, the consultant's recommendations considered, and any interested party shall be allowed to speak or present evidence. At the conclusion of the public hearing, the Council shall approve or deny the permit based upon the reports, recommendations and testimony submitted. The Council may table any application for up to 60 days and direct the City Engineer to provide additional information. The Council may add or modify any conditions necessitated by the health, safety, and welfare of the public, whether or not included in the recommendations of the City Engineer.

(Code 2011 (Repub.), § 4-13(G)(1); altered in 2017 recodification)

Ask a question about College Station law

Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.