Sec. 34-137. - Construction standards.
(a) The city must be notified 24 hours in advance that construction is ready to proceed by either the right-of-way user, their contractor or representative. At the time of notification, the right-of-way user will inform the City of the number (or other information) assigned from the one-call system. (b) All construction shall be in conformance with all applicable City codes, local, State and Federal laws. (c) Three feet by three feet information signs identifying the name of the company doing the work, telephone number and permittee's identity and telephone number shall be placed at the location where construction is to occur prior to the beginning of work in the right-of-way and shall continue to be posted at the location during the entire time the work is occurring. An informational sign will be posted in the public right-of-way 100 feet before the construction location commences and each 100 feet thereafter, unless other posting arrangements are approved or required by the City. (d) Erosion control measures (e.g., silt fence) and advance warning signs, markers, cones and barricades must be in place before work begins. The contractor will contain and prevent all soil from migrating off-site by use of water suppression, vehicle cleaning areas, silt fences, hay bales, etc. (e) The contractor will maintain base material on streets under construction and on detours as required to maintain sufficient moisture content in the surface layer for dust control. The contractor will be responsible for cleaning mud and dust from roadways on a daily basis. (f) Lane closures on major thoroughfares will be limited after 8:30 a.m. and before 4:00 p.m. unless the City grants prior written approval. Arrow boards will be required on lane closures, with all barricades, advance warning signs and 36-inch reflector cones placed according to the specifications of the City. (g) Permittee is responsible for the quality of the workmanship and any damage caused by its contractors or subcontractors. A designated representative of the permittee will be available to the City at all times during construction. (h) Permittee shall be responsible for stormwater management erosion control that complies with City, State and Federal regulations and guidelines. Requirements shall include, but not be limited to, silt fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, barricade fencing around open holes, and high erosion areas will require wire-backed silt fencing. Upon request, the permittee may be required to furnish documentation submitted or received from Federal or State government. (i) Permittee, contractor or subcontractor will notify the City immediately of any damage to other utilities, either City or privately owned. (j) It is the City's policy not to cut streets or sidewalks; however, when a street or sidewalk cut is necessary, prior written approval must be obtained from the City and all requirements of the City shall be followed. Repair of all street and sidewalk removals must be made promptly to avoid safety hazards to vehicle and pedestrian traffic. (k) Installation of facilities must not interfere with City utilities, in particular, gravity dependent facilities. (l) New facilities must be installed to a depth approved by the City. (m) All directional boring shall have locator-place bore marks and depths while bore is in progress. Locator shall place mark at each stem with paint dot and depth at least every other stem. (n) The working hours in the rights-of-way are 7:00 a.m. to 30 minutes before sunset, Monday through Friday. Work that must be performed after 30 minutes before sunset Monday through Friday must be approved in advance. Any work performed on Saturday must be pre-approved 24 hours in advance by the City. Directional boring is permitted only Monday through Friday 7:00 a.m. to 30 minutes before sunset, unless approved in advance. No work will be done, except for emergencies, on City holidays. (o) People working in the right-of-way are responsible for obtaining line locates from all affected utilities or others with facilities in the right-of-way prior to any excavation. Use of the Geographic Information System or the plans of record, or both, does not satisfy this requirement. (p) Permittee will be responsible for verifying the location, both horizontal and vertical, of all facilities. When required by the City, the permittee shall verify locations by pot holing, hand digging or other method approved by the City prior to any excavation or boring with the exception of work involving lane closures, as discussed above. (q) Placement of all manholes and/or hand holes must be approved in advance by the City. Handholes or manholes will not be located in sidewalks, unless approved by the City. (r) Locate flags shall not be removed from a location while facilities are being constructed. (s) Construction which requires pumping of water or mud shall be contained in accordance with City ordinances, Federal and State law. (t) All construction of electric utility facilities must be in compliance with National Electrical Safety Code (NESC) standards.
(Code 2011 (Repub.), § 3-2(G))
Ask a question about College Station law
Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.