§ 40-320 — Electric rate Schedule LP-3 (industrial)

Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Code of Ordinances § 40-320

Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/d65b7bd6-8759-46bd-a291-b36c32734e22

Sec. 40-320. - Electric rate Schedule LP-3 (industrial).

(a) Established. There is hereby established Electric Rate-Schedule LP-3, which shall be applicable to all industrial customers where service is taken through one meter at one point of delivery and where the monthly kilowatt demand is greater than or equal to 1,500 kW. Service will be furnished subject to the established rules and regulations of the City covering this type of service. Before service is furnished hereunder, an individual service agreement contract between the customer and the City may be required outlining all details of the service to be supplied, the terms of the contract, and the obligations of each party. (b) Character of service. A.C., 60 cycles per second, 277/480, 2400/4160, 7200/12,470 volts as available at point of service. (c) Rate. (1) Service charge: Established in Section 2-117; plus (2) Demand charge: Established in Section 2-117; plus (3) Energy charge: Established in Section 2-117. (d) Minimum monthly charge. The minimum monthly charge under this rate schedule shall be the highest of the following charges: (1) The amount established in Section 2-117, plus applicable transmission delivery adjustment on the kilowatt-hours used. (2) The sum of service, demand and energy charges under the above rate, plus applicable transmission delivery adjustment on the kilowatt-hours used. (3) The minimum monthly charge specified in the customer's service contract with the City, plus applicable transmission delivery adjustment on the kilowatt-hours used. (e) Billing demand. The billing demand shall be in the maximum 15-minute measured kilowatt demand in the billing period, but not less than 50 percent of the peak demand measured in the 12-month period ending with the current month. Unless otherwise specified in a firm electric service contract agreement, if at any time a customer billed under this schedule continues for a period of 12 consecutive months without a metered demand in equal to or greater than 1,500 kW, Schedule LP-2 shall apply beginning with the first month succeeding such 12-month period. (f) Power factor. Should the power factor be lower than 0.90 lagging, the City may adjust the measured demand by multiplying by the ratio of 0.90 of the actual power factor. (g) Primary service. Where service is taken by the customer at the City's available primary voltage and where the customer owns, operates and maintains all service facilities, except metering equipment, required to take service at such voltage, a credit of two percent of the base rate charges will be allowed. Metering may be primary or secondary (corrected for the transformer losses) at the City's option. (h) Transmission delivery adjustment. The monthly charges under this rate schedule shall be increased or decreased as necessary to reflect the application of a transmission delivery adjustment calculated in accordance with Schedule TDA; provided, however, that the adjustment shall never be less than zero. (i) Electric on-peak/off-peak rider. Upon the customer's request, this rider shall be made available to customers billed under the rate schedule LP-3, whose monthly demand is 300 kW or greater, and who can reduce their load during the City's on-peak time between 5:00 p.m. and 8:00 p.m. Under this rider, the demand for billing purposes shall be adjusted to be as follows: (1) Rate. The applicable rate schedule demand charges shall be replaced by the on-peak/off-peak rates established in Section 2-117. (2) However, in no case shall the billing demand in any month be less than 50 percent of the peak demand measured in the 12-month period ending with the current month. (3) The periods for application of this rider are defined as follows: a. On-peak period: 5:00 p.m. through 8:00 p.m., daily. b. Off-peak period: 8:00 p.m. through 5:00 p.m., daily. (j) Electric rider: Wind Watts Wind Energy Rider. (1) Availability. This optional service shall be available to all industrial customers who select wind-generated energy as a source of electricity under the City's Wind Watts Program, in lieu of electricity provided from traditional generation. Wind Watt's energy is available to customers on a first-come, first-served basis subject to available supply. (2) Application. Eligible customers may select service under this rider at three levels of participation: a. Ten percent of monthly energy requirements. b. 50 percent of monthly energy requirements. c. 100 percent of monthly energy requirements. (3) Rate. Same rate as for industrial customers plus the monthly Wind Watts charge established in Section 2-117 for the appropriate participation level.

(Code 2011 (Repub.), § 11-4(A)(7); Ord. No. 2016-3811, exh. A(11-4), 9-22-2016; altered in 2017 recodification)