For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.5.3 — Temporary Use Permit

Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton Development Code subch. 2, § 2.5.3

Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/313b2aea-1d43-414c-8d73-72397455980d

2.5.3 - Temporary Use Permit.

A. Purpose. The temporary use permit procedure provides a mechanism for the city to evaluate prospective uses and/or structures on private property of limited duration to ensure compliance with applicable standards of this DDC, including Section 5.5: Temporary Uses and Structures. B. Applicability. A temporary use permit is required before establishing, constructing, or installing any temporary use or structure designated as requiring a temporary use permit in Section 5.5: Temporary Uses and Structures. C. Temporary Use Permit Procedure. Figure 2.5-3 identifies the applicable steps from the common review procedures in Section 2.4 that apply to the review of temporary use permits. Additions or modifications to the common review procedures are noted below. Figure 2.5-3: Summary of Temporary Use Permit Procedure [image omitted; see the official code] 1. Step 1: Pre-Application Activities. a. Pre-Application Conference. A pre-application conference is recommended in accordance with Subsection 2.4.3. b. Citizen Participation. Not required. 2. Step 2: Application Submittal and Processing. The temporary use permit application shall be submitted and accepted, and may be revised or withdrawn, in accordance with Subsection 2.4.4. 3. Step 3: Staff Review and Action. The Director shall review and approve, approve with conditions, or deny the temporary use permit application in accordance with the approval criteria in Subsection 2.5.3D below. 4. Step 4: Scheduling and Notice of Public Meetings/Hearings. Not required. 5. Step 5: Review and Decision. Not applicable. Review and decision is by the Director under Step 3. 6. Step 6: Post-Decision Actions and Limitations. Post-decision actions and limitations in Subsection 2.4.8 shall apply, with the following modifications: a. Effect of Approval. A temporary use permit authorizes establishment, construction, or installation of the approved temporary use or structure in accordance with the terms and conditions of the permit. b. Expiration of Approval. i. A temporary use permit shall be valid beginning on the date specified on the permit and shall remain valid for the time period indicated on the permit, but in no event, longer than 12 months. ii. Upon request, the Director may grant a one-year extension; however, in no case shall a temporary use permit be valid for more than one year after its original expiration date. This one-year extension period may not be further extended. iii. Any temporary use permit requesting an approval period beyond one year shall require a specific use permit approval pursuant to Subsection 2.5.2. c. Removal and Restoration. Before the expiration of a temporary use permit, the permittee shall disconnect all temporary uses and structures, and associated property and equipment, and free the temporary use site from all trash, litter, and debris to the satisfaction of the Director. d. Appeal to the Zoning Board of Adjustment. The applicant may appeal the denial, revocation, or suspension of a temporary use permit to the Zoning Board of Adjustment in accordance with Subsection 2.8.3. D. Temporary Use Permit Approval Criteria. In reviewing a temporary use or structure, the Director shall consider the general approval criteria in Subsection 2.4.5 and whether the proposed use or structure: 1. Complies with applicable temporary use standards in Section 5.5: Temporary Uses and Structures, as well as all other applicable standards in this DDC; 2. Adequately mitigates any impacts associated with access, traffic, emergency services, utilities, parking, refuse areas, noise, glare, and odor; and 3. Complies with all requirements and conditions of approval of any prior development permit or approval.

(Ord. No. DCA22-0002d, § 2(Exh. A), 7-19-2022)

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.