Sec. 25-91. - Joint planning and construction; coordination of excavations.

(a) Excavations in rights-of-way disrupt and interfere with the public use of the city streets and damage the pavement and landscaping. The purpose of this section is to reduce this disruption, interference and damage by promoting better coordination among right-of-way users making excavations in rights-of-way and between these right-of-way users and the city. Better coordination will assist in minimizing the number of excavations being made wherever feasible and will ensure the excavations in rights-of-way are, to the maximum extent possible, performed before, rather than after, the reconstruction of the streets by the city. (b) Utility coordination meeting. (1) The city will hold a utility coordination meeting on a monthly basis. The purpose of the meeting is for the city to inform right-of-way users of proposed and current capital improvement projects in the City of Denton and for the right-of-way user to inform each other and the city of current and future projects. Each right-of-way user is encouraged to attend and participate in the meetings of the city, of which the right-of-way user will be made aware. (2) The city engineer will notify the affected right-of-way user at least six (6) months before construction will start on a city project. Preliminary plans will be provided to the affected right-of-way user at least four (4) months before the project is to start construction. Final plans will be provided to the affected right-of-way user at least two (2) months before the project is to start construction. (3) Whenever it is possible and reasonably practicable to joint trench or share bores or cuts, the right-of-way user shall work with other right-of-way users to reduce the number of cuts to paved surfaces and minimize interference to the public use of right-of-way within the city. (c) Excavation master plan. In addition to participating in utility coordination meetings, any right-of-way user owning, operating or installing facilities in rights-of-way, providing water, sewer, gas, electric, communication, video, or other utility services, shall meet annually with the city engineer, at the city engineer's request, to discuss the right-of-way user's excavation master plan. At such meeting, to the extent not already in possession of the city, right-of-way user should submit documentation, in a form requested by the city engineer, showing the location of the right-of-way user's existing facilities in the rights-of-way. (1) Right-of-way user shall discuss with the city engineer its excavation master plan and identify planned major excavation work in the city. The city engineer may make his own record on a map, drawing, or other documentation of each right-of-way user's planned major excavation work in the city; provided, however, that no such document prepared by the city engineer shall identify the entity, or the planned major excavation work of that particular entity. (2) Between the annual meeting to discuss planned major excavation work, right-of-way user shall inform the city engineer of any substantial changes in the planned major excavation work discussed at the annual meeting. The city will not preclude a right-of-way user from obtaining a permit for a project that was inadvertently excluded from the agency's, network provider's or public infrastructure contractor's excavation master plan or was unknown at the time the plan was created.

(Ord. No. 2019-2439, § I, 11-19-19)

Ask a question about Denton law

Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.