§ 26-203 — Wastewater system work permit required
Code of Ordinances, City of Denton, Texas (Supp. No. 37, Update 1: codified through Ordinance No. 26-296 adopted March 24, 2026) · Denton City Code § 26-203
Corpus is an independent public-information project, not the official City of Denton website. Stable reference: corpuslaw.us/code/485fef0d-d365-4e93-832b-aa1681c9666f
Sec. 26-203. - Wastewater system work permit required.
(a) It shall be unlawful for any user of the wastewater system to construct, reconstruct, modify, enlarge, or alter any equipment, device, machinery, apparatus, or facility or system or component thereof which is used or is intended to be used to treat, process, measure or convey any wastewater which is or will be discharged into the wastewater system without first obtaining a wastewater system work permit from the city manager, or their designee. (b) Requirements for permit. A wastewater system work permit shall be issued when all plans, drawings and specifications are submitted in such detail as the city manager, or their designee, may require and the city manager, or their designee, has determined that the work to be done will result in adequate treatment, processing, measuring and conveyance of the wastewater discharged into the wastewater system in accordance with the provision of this article. (c) Certificate of final inspection upon completion. (1) Upon completion of the work to be done under the wastewater system work permit, the city manager, or their designee, shall inspect the work and, if done in accordance with the permit, the city manager, or their designee, shall issue a certificate of final inspection to the permit holder. (2) If the completed work does not comply with the plans and specifications submitted for which the permit was issued, the city manager, or their designee, shall require such correction as necessary before a certificate of inspection is issued. (3) No person receiving a wastewater system work permit shall utilize or make use of any equipment, device, machinery, apparatus or facility covered by the permit until a certificate of final inspection is issued in accordance with this article. (4) Right to inspect. No person shall refuse the city manager, or their designee, the right to inspect any work done or required to be done under this article.
(Ord. No. 21-242a, § 1, 3-16-21)
Ask a question about Denton law
Corpus searches the Denton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
