For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 52.27 — Sampling and testing

Code of Ordinances of the City of Edinburg, Texas (Codified through Ordinance No. 2026-5214, enacted June 2, 2026 (Supp. No. 14)) · Edinburg Code of Ordinances § 52.27

Corpus is an independent public-information project, not the official City of Edinburg website. Stable reference: corpuslaw.us/code/bab4f5f2-110a-411c-ae84-862cd2cda28d

Sec. 52.27 - Sampling and testing.

(A) (1) Sampling shall be conducted according to customarily accepted methods, reflecting the effect of constituents upon the sewage works and determining the existence of hazards to health, life, limb and property. (2) Note: The particular analysis involved will determine whether a 24-hour composite sample from all outfalls of a premise is appropriate or whether a grab sample or samples should be taken. Normally, but not always, BOD and suspended solids analysis are obtained from 24-hour composites of all outfalls. Where applicable, 16-hour, eight-hour or some other period may be required. Periodic grab samples are used to determine pH and oil and grease. (B) Examination and analysis of the characteristics of waters and wastes required by the chapter shall be: (1) Conducted in accordance with the latest edition of Standard Methods; and (2) Determined from suitable samples taken at the control manhole provided or other control point authorized by the approving authority. (C) BOD and suspended solids shall be determined from composite sampling, except to detect unauthorized discharges. (D) The approving authority shall determine which users or classes of users may contribute wastewater which is of greater strength than normal domestic wastewater. All users or classes of users so identified shall be sampled for flow, BOD, TSS and pH at least annually. (E) The city may select an independent firm or laboratory to determine flow, BOD, and suspended solids, if necessary. (F) The volume of industrial waste flows shall be taken as a portion of the metered water consumption, with due allowance for evaporation, inclusion on products and the like, agreed upon by the owner involved and the city. The metered water consumption shall be that volume recorded by the city, where public water supply is used together with authentic records of consumption from any private sources used. Measurement of water from private sources shall be done at the expense of the owner in a manner approved by the city. (G) Cost for annual testing described in division (D) of this section shall be incurred to the account of the city. Costs for test performed at intervals of less than one year, or for purposes other than surcharge computations, shall be paid according to an agreement between the owner involved and the city. (H) At the discretion of the owner, industrial waste flows may be measured directly by a suitable device, provided and maintained by the owner and approved by the city.

(`82 Code, § 14-69.5) (Ord. 1106, passed 12-18-84)

Ask a question about Edinburg law

Corpus searches the Edinburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.