Chapter 18.02 — BUILDING AND CONSTRUCTION ADMINISTRATIVE CODE
El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026), El Paso, TX · 136 sections. Independent public-information project, not the official City of El Paso website.
- § 18.02.101.1 — Title
- § 18.02.101.2 — Purpose
- § 18.02.101.3 — Interpretation
- § 18.02.101.4 — Referenced standards
- § 18.02.101.5 — Code remedial
- § 18.02.101.6 — Quality control
- § 18.02.101.7 — Permitting and inspection
- § 18.02.102 — DEFINITIONS
- § 18.02.103.1 — Building official
- § 18.02.103.2 — Administration and enforcement
- § 18.02.103.3 — Deputy building officials
- § 18.02.103.4 — Chief inspector qualifications
- § 18.02.103.5 — Inspector qualifications
- § 18.02.103.6 — Right of entry
- § 18.02.103.7 — Inspection warrant
- § 18.02.103.8 — Tests
- § 18.02.104.1 — Contractors' responsibilities
- § 18.02.104.2 — Contractor registration
- § 18.02.104.3 — Registration application
- § 18.02.104.4 — Disclosures
- § 18.02.104.5 — Acknowledgements
- § 18.02.104.6 — Licenses required
- § 18.02.104.7 — Bonds required
- § 18.02.104.8 — Bond requirements
- § 18.02.104.9 — Insurance required
- § 18.02.104.10 — Insurance requirements
- § 18.02.104.11 — Identification of vehicles
- § 18.02.105.1 — Permit application
- § 18.02.105.3 — Master permits
- § 18.02.105.4 — Separate subcontractor permits
- § 18.02.105.5 — Permits required for every building
- § 18.02.105.6 — Information required
- § 18.02.105.7 — Drawings and specifications
- § 18.02.105.8 — Additional data
- § 18.02.105.9 — Design professional
- § 18.02.105.10 — Application submission
- § 18.02.105.11 — Examination of documents/plan review
- § 18.02.105.12 — Issuing permits
- § 18.02.105.13 — "One call" system notification
- § 18.02.105.14 — Application referral to city departments for approval—Permits not issued for work in violation of ordinances
- § 18.02.105.15 — Prerequisite to issuance of permits
- § 18.02.105.16 — Authorization to proceed with construction
- § 18.02.105.17 — Affidavits
- § 18.02.105.18 — Permit issued on basis of an affidavit
- § 18.02.105.19 — Plans
- § 18.02.105.20 — Conditions of permits
- § 18.02.105.20.1 — Construction work hours
- § 18.02.105.20.2 — After hours construction/grading permit
- § 18.02.105.20.3 — Emergency condition
- § 18.02.105.20.4 — Duration of permit
- § 18.02.105.21 — Nontransferable
- § 18.02.105.22 — Placement of permit
- § 18.02.105.23 — Duration of permits
- § 18.02.105.24 — Refusal to issue permit
- § 18.02.105.25 — Denial/Revocation of permits
- § 18.02.105.26 — Ineligibility period
- § 18.02.105.27 — Appeals
- § 18.02.105.28 — Cancelation/termination of permit
- § 18.02.105.29.1 — Homeowner/homestead permits
- § 18.02.105.29.2 — Homeowner permits
- § 18.02.105.29.3 — Mobile homes/manufactured housing placement permit
- § 18.02.105.29.4 — Texas Industrialized Buildings/Housing Placement Permit
- § 18.02.105.29.4.1 — Temporary Placement Texas Industrialized Buildings for School Sites
- § 18.02.105.29.5 — Temporary gas permit
- § 18.02.106.1 — General
- § 18.02.106.2 — Prescribed fees
- § 18.02.106.3 — Accounting
- § 18.02.106.4 — Schedule of permit fees
- § 18.02.106.5 — Building permit valuations (excluding new residential and residential additions
- § 18.02.106.6 — Valuation for commercial master permits
- § 18.02.106.6.1 — Permit fee for new residential or residential addition permits
- § 18.02.106.7 — Valuation for shell only permits
- § 18.02.106.7.1 — Valuation for shell II only permits
- § 18.02.106.8 — Valuation for tenant improvement permits to shell buildings
- § 18.02.106.9 — Valuation for foundation only permits
- § 18.02.106.9.1 — Valuation for groups F (factory), S (storage), and U (utility occupancies), as defined by the IBC
- § 18.02.106.10 — Fee refunds
- § 18.02.106.11 — Submission, plan review and additional review fees
- § 18.02.106.12 — Plan review options available to the applicant
- § 18.02.106.13 — Building permit fees: Mechanical, Electrical, Plumbing, Gas, Irrigation, Solar, permit fees
- § 18.02.106.14 — Mechanical permit fees
- § 18.02.106.15 — Electrical permit fees
- § 18.02.106.16 — Plumbing permit fees
- § 18.02.106.17 — Gas permit fees
- § 18.02.106.18 — Temporary gas permit fee
- § 18.02.106.19 — Irrigation permit fees
- § 18.02.106.20 — Moving of buildings or structures
- § 18.02.106.21 — Demolition of building or structure
- § 18.02.106.22 — Temporary structures
- § 18.02.106.23 — Sidewalk, street, alley, public right-of-way, and parking meter space, rental
- § 18.02.106.24 — Fees for fire protection systems and appliances
- § 18.02.106.25 — Fees for temporary or partial certificate of occupancies
- § 18.02.106.26 — Investigation inspection fees
- § 18.02.106.27 — Re-inspection fees
- § 18.02.106.28 — Starting work without a permit—Commercial
- § 18.02.106.29 — Contractor starting work without a permit—Residential
- § 18.02.106.30 — Homeowner starting work without a permit—Residential
- § 18.02.107.1 — Inspections
- § 18.02.107.2 — Existing building inspections
- § 18.02.107.3 — Retaining walls
- § 18.02.107.4 — Reroofing
- § 18.02.107.5 — Signs
- § 18.02.107.6 — Irrigation and landscaping systems
- § 18.02.107.7 — Plaster fire protection
- § 18.02.107.8 — Reinforcing steel and structural frames
- § 18.02.107.9 — Inspection of annexed installations
- § 18.02.107.10 — Non-business hour inspections and inspections by appointment
- § 18.02.107.11 — Requirements for prefabricated buildings
- § 18.02.107.12 — Manufacturers and fabricators
- § 18.02.107.14 — Special inspection and test program
- § 18.02.107.14.1 — Special inspections and tests requirements
- § 18.02.107.14.2 — Special inspectors/agencies
- § 18.02.107.15.1 — Purpose and authority
- § 18.02.107.15.2 — Procedures for third party service providers
- § 18.02.107.15.3 — Qualification requirements
- § 18.02.107.15.4 — Scope of services
- § 18.02.107.15.5 — Third party service provider audits
- § 18.02.107.15.6 — Third party service provider audit process
- § 18.02.107.15.7 — Third party service provider license fees
- § 18.02.108.1 — Demolition of building or structure
- § 18.02.111.1 — New building certificate of occupancy
- § 18.02.111.2 — Existing building certificate of occupancy
- § 18.02.111.3 — Certificates of occupancy for lots with unconditional master building permits
- § 18.02.111.4 — Certificates of occupancy for lots with conditional master building permits
- § 18.02.111.5 — Temporary Certificate of Occupancy (TCO)
- § 18.02.111.6.1 — Conditional certificate of occupancy (CCO)
- § 18.02.111.7 — Certificate of completion
- § 18.02.111.8 — Connection of service utilities
- § 18.02.111.9 — Temporary connection
- § 18.02.111.10 — Authority to disconnect service utilities
- § 18.02.111.11 — Plumbing outside city limits
- § 18.02.111.12 — Relations with the El Paso Water Utilities (EPWU Department)
- § 18.02.111.13 — Appeals
- § 18.02.112.1 — Discarded building materials and construction site waste
- § 18.02.114 — SEVERABILITY
- § 18.02.115 — VIOLATIONS AND PENALTIES
