§ 9-201 PRE-SUBMITTAL CONFERENCE.

(a) To schedule a pre-submittal conference, a complete set of engineering plans and all detailed checklists must be fully completed, executed, and delivered to the IPRC in the form and manner specified by the IPRC. (b) City staff will review the engineering plans and provide the design engineer with comments on the plans before the pre-submittal conference. Engineering plans shall be discussed by city staff and the design engineer during the mandatory pre-submittal conference before the design engineer will be allowed to submit the applicable submittal package to IPRC for the first formal review. (c) A project manager will be assigned to the project before the pre-submittal conference. (Ord. 23656-05-2019, § 1, passed 5-7-2019, eff. 6-1-2019)

Ask a question about Fort Worth law

Corpus searches the Fort Worth sections it holds and shows the ones that match, with their citations. Free, no sign-in.