§ 2-143 — Funding for the public art program
Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § 2-143
Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/bf9b6190-a08f-4ab2-bd41-00624e4848c1
§ 2-143: Funding for the public art program.
(a) Funding for the public art program shall be accomplished by designating up to two percent (2%) but not less than one percent (1%) of CIP funding for the acquisition of public art, which may be derived from Frisco's capital project fund, project partners and/or grants as provided herein. The allocation shall be calculated based on the total construction costs, excluding all costs for demolition and real property acquisition, and excluding any subsequent amounts appropriated for amendments and change orders. For projects funded through bonds, certificates of obligation or other public securities of the city ("bonds"), the original design and construction appropriation estimate will determine the allocation, and the art installation may be physically limited or closely related to the project undertaking with the bond proceeds. Additionally, state law, federal law relating to tax-exempt bonds, bond election proceedings and state administrative decisions may limit or restrict the use of bond proceeds for these purposes; the city shall ensure compliance with all such limitations or restrictions. For all other funding sources, the allocation will be based upon final design and construction bid values. The allocation required by this subsection shall not be made for capital improvement projects located outside Frisco city limits. All capital improvement projects qualify except the following: Regular road maintenance, underground infrastructure and underground utility projects with no above-ground components other than roads. Capital improvement projects with underground infrastructure including utility projects should be included only when there are significant visual elements of the project above ground. The total budget of the capital improvement project shall include all underground components. For projects determined to be unsuitable for public art by the city manager or his/her designee due to low anticipated visibility or use by the public, insufficient funds to produce art of quality and durability, or because art was previously produced for the proposed location of a reinvestment capital improvement project, a determination will be made if unused funds can legally be pooled with other monies for use at a different location. Said project suitability, and funding allocation or reallocation, will be confirmed by the arts and culture advisory board. (b) Acquisition funds provided by subsection (a) of this section shall be used for artist fees and costs related to the production of artwork. (1) Permissible expenditures include: (A) The cost of the artwork and its installation; (B) Waterworks, electrical and mechanical devices and equipment which are an integral part of the artwork; and (C) Bases or foundations necessary for the proper presentation of the artwork. (2) Inappropriate expenditures include: (A) Reproductions by mechanical or other means of original artwork (however, limited editions controlled by the artist, or original prints, cast sculpture or photographs may be included); (B) Vegetative materials, pool(s), paths, benches, receptacle(s), fixtures, planters, etc., except when designed by artists; (C) Art objects which are mass-produced or of standard design, such as playground sculptures or directional fountains or other functional elements, except when designed by artists; (D) Walls, pools or other architectural elements on or in which the artwork is placed or affixed; (E) Preparation of the site necessary to receive the artwork; electrical, water or mechanical service for activation of the artwork; (F) Temporary art such as gallery exhibitions and other projects intended to be nonpermanent; (G) Exhibitions and educational programs relative to the artwork before or after installation, including lighting, registration, dedication, unveiling, insurance, security and publicity or publications; (H) Consultant or designer costs related to public art projects unless deemed necessary by the artist. Due to funding restrictions associated with general obligation bonds and certificates of obligation, separate accounts will be established from the general fund for public art program operations, programming, public art maintenance and temporary art. (c) Any funds for public art projects underway not expended at the conclusion of the fiscal year will rollover into the following fiscal year. (d) For all grants sought by Frisco for CIPs in the amount of $1,000,000.00 or more, Frisco departments shall include, when allowable by the funding entity, a request that two percent (2%) of the grant amount be authorized for art. Likewise, when Frisco is not a CIP's sole funding entity, the art allocation shall apply only to Frisco's portion of the project cost, though all project partners are encouraged to participate.
( Ordinance 11-09-46 , sec. 5, ex. A, adopted 9/20/11 ; Ordinance 18-08-43 adopted 8/21/18 ; Ordinance 2024-05-26 adopted 5/21/2024 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
