For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.05.08 — Site Plan

Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § 6.05.08

Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/351b037d-4739-40fd-9ca8-3edda752550a

§ 6.05.08: Site Plan.

(A) Site plan general information. The Site Plan is a detailed plan of the public and private improvements to be constructed. The purpose of the plan is to: (1) Ensure compliance with applicable development regulations and previously approved, valid plans affecting development of the property; (2) Coordinate and document the design of public and private improvements to be constructed; (3) Coordinate the subdivision of land, including the granting of easements, rights-of-way, development agreements and provision of surety; (4) Promote the health, safety and welfare of the public; and (5) Identify and address environmental concerns (i.e., floodplain, drainage, trees, topography, etc.). (B) Site plan applicability. (1) Prerequisite for the Filing and Approval of Any Construction Plan and Permit. An approved, valid Site Plan is required prior to the filing and approval of any construction plan and permit for and development of the following: a. Nonresidential development, except as provided in Subsection 6.05.04; b. Residential development having more than two dwelling units, including attached single-family residences (townhomes), multifamily residences and condominiums; c. Manufactured home parks; or d. Parking lot development, and reconstruction or reconfiguration of a parking lot by more than ten (10) percent. (C) Site plan application filing and requirements. (1) Site plan application filing. The property owner shall file an application for the approval of a Site Plan. This filing must include the information listed on the Site Plan Checklist, as it exists or may be amended, which shall be established and maintained by the Director and published as part of the Development Application Handbook. (2) Site plan additional requirements. a. An Open Space Plan, where an Open Space Plan is required under Subsection 4.13.03, must be filed at the same time as the Site Plan application and shall be considered and approved prior to approval of the Site Plan. A denial of the Open Space Plan shall result in denial of the Site Plan. 1. Staff shall approve or deny the open space plan when submitted with the Site Plan if all the following conditions are met: (i) Valid Open Space Plan and Preliminary Site Plan approved by the Planning & Zoning Commission; (ii) Amenity types and dimensions (height, length, width) remain the same; (iii) Size of open space remains the same; (iv) Location of open space remains the same; and (v) General conformance to the quality of the design and amenities of the space, as approved by the Planning & Zoning Commission. 2. If the above-mentioned conditions are not met, The Planning & Zoning Commission shall approve, deny, or approve with conditions the proposed open space plan based upon criteria listed in Subsection 4.13.03(G)(1)(a)–(c) [sic] (Open Space Recommendation). b. A Facade Plan, where a Facade Plan is required under Subsection 6.16, must be filed at the same time as the Site Plan application. Failure to obtain approval of a Facade Plan, where a Facade Plan is required under this Ordinance, shall be grounds for denial of the Site Plan. c. A Landscape Plan and a detailed Tree Survey shall be submitted with a Site Plan application as documents to aid in the review of the Site Plan. If required, a Traffic Impact Analysis, Traffic Circulation Study, and/or Flood Study shall be submitted with a Site Plan as documents to aid in the review of the Site Plan. These additional plans shall not be considered filed and shall not be acted on by the Director, the Planning & Zoning Commission or the City Council; however, failure to submit such plans, where such plans are required under this Ordinance, with the Site Plan application shall be grounds for rejection or denial of the Site Plan application. (3) Site plan standards of approval. a. Director approval scenario. Where application for Site Plan approval is made for development defined on an approved, valid Preliminary Site Plan, the Director may approve, conditionally approve or deny the application based upon the criteria listed below. b. Planning & Zoning Commission approval scenario. If cases where no Preliminary Site Plan exists, the Planning & Zoning Commission may approve, conditionally approve, table or deny a Site Plan based upon the criteria listed below. c. In the event of a denial, the applicant may file a new Site Plan application subject to the requirements and regulations in effect at the time the application is filed. (4) Approval criteria. a. Conformance with the Comprehensive Plan and adopted design guidelines. b. Compliance with the Zoning Ordinance and other applicable regulations and previously approved, valid plans for the property. c. The design and location of off-street parking and loading facilities to ensure that all such spaces are usable and are safely and conveniently arranged. d. The width, grade and location of streets designed to accommodate prospective traffic and to provide access for firefighting and emergency equipment to buildings. e. The use of landscaping and screening to provide adequate buffers to shield lights, noise, movement or activities from adjacent properties when necessary, and to complement the design and location of buildings and be integrated into the overall site design. f. The location, size and configuration of open space areas to ensure that such areas are suitable for intended recreation and conservation uses. g. Protection and conservation of soils from erosion by wind or water or from excavation or grading. h. Protection and conservation of water courses and areas subject to flooding. i. The adequacy of streets, water, drainage, sewerage facilities, garbage disposal and other utilities necessary for essential services to residents and occupants. j. City taxes on the property are not delinquent. (5) Site plan effect. a. Approval of a Site Plan entitles the owner to apply for approval of building permits and engineering plans. Failure to obtain approval of a Site Plan, where a Site Plan is required under this Ordinance, shall be grounds for denial or withholding of building permits or engineering plans. b. Approval of a Site Plan shall not affect other applicable regulations concerning development and land use. c. Except where authorized by ordinance, a Site Plan may not be used to approve a variance to development regulations. d. Where an approved plan conflicts with an adopted regulation and no variance is expressly approved, the regulation shall apply. (6) Site plan lapse. a. Applications filed on or after September 1, 2005. 1. For applications filed on or after September 1, 2005, the approval of a Site Plan shall be effective for a period of two (2) years from the date of approval, at the end of which time the Site Plan shall expire unless the applicant demonstrates to the Director that progress has been made towards completion of the project for which the Site Plan was approved. 2. Submission and receipt of approval of engineering plans and building permits prior to expiration of the Site Plan shall be evidence of progress towards completion. 3. If the progress towards completion is only for a portion of the property, the Site Plan for the remaining property, together with any Preliminary Site Plan for the property, shall expire. 4. An expired Site Plan is null and void. 5. Any new Site Plan submitted for review and approval shall be subject to the existing regulations at the time of submittal. 6. A Site Plan may be extended for a period not to exceed one (1) year beyond the Site Plan's expiration date, subject to the applicant demonstrating to the Director that progress has been made towards the completion of the project for which the Site Plan was approved. A written request for extension shall be submitted to the Director of Development Services at least thirty (30) calendar days prior to expiration of the Site Plan, and shall include a detailed explanation and evidence demonstrating progress towards completion of the project. (i) Decision by the Director of Development Services. A. The Director of Development Services will review the extension request and shall approve it, approve it with conditions, or deny the extension request within thirty (30) calendar days following the official filing date of the request. B. Should the Director of Development Services fail to act on an extension request within thirty (30) calendar days, the extension shall be deemed approved. (ii) Conditions. In granting an extension, the decision-maker may impose such conditions as are needed to ensure that the project will be developed in a timely fashion and that the public interest is served by granting the extension. If the applicant fails to demonstrate progress towards completion of the project, an extension may be predicated upon compliance with new development regulations and/or the applicant waiving any vested rights. (iii) Appeal of denial of extension. A. Appeal of the director's decision. The denial of an extension by the Director of Development Services may be appealed to the Commission. A written request for such appeal shall be received by the Director of Development Services within fourteen (14) calendar days following the denial. The Commission shall hear and consider such an appeal within thirty (30) calendar days following the Director's receipt of the appeal request. B. Appeal of the commission's decision. The denial of an extension by the Commission may be appealed to the City Council. A written request for such appeal shall be received by the Director of Development Services within fourteen (14) calendar days following the denial. The City Council shall hear and consider such an appeal within thirty (30) calendar days following the Director's receipt of the appeal request. The decision of the City Council is final. b. Applications filed before September 1, 2005. 1. For applications filed before September 1, 2005, the approval of a Site Plan shall be effective for a period of eighteen (18) months from the date of approval by the Planning & Zoning Commission, at the end of which time the applicant must have submitted and received approval of engineering plans and building permits. 2. If the engineering plans and building permits are not approved, the Site Plan approval, together with any Preliminary Site Plan for the property, is null and void. 3. If engineering plans and permits have been approved only for a portion of the property and for improvements, the Site Plan for the remaining property and/or improvements, together with any Preliminary Site Plan for the property, shall be null and void. c. Expired site plans. 1. For all expired Site Plans, the applicant shall be required to submit a new Site Plan and if required, a new Site Plan, for review and approval by the Planning & Zoning Commission subject to the then existing regulations. 2. Site Plan approval shall expire upon completion of the improvements shown on the plan. Permits must remain valid during the construction process. 3. Subsequent additional development, site modifications and redevelopment shall be permitted in accordance with Subsection 6.05.09. Site Plan Amendments and shall be considered a new project subject to the then existing ordinances, laws and regulations of the City. (7) For appeals, see Subsection 6.19 Appeals and the Appeal Process.

( Ordinance 19-08-70 adopted 8/20/19 ; Ordinance 2021-07-47 adopted 7/6/21 ; ; Ordinance 2025-04-24 adopted 4/1/2025 )

Ask a question about Frisco law

Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.