§ 78-402: Permitting.
(a) Attachments to existing poles or structures. A provider shall not install, modify or relocate a network node on an existing pole or structure or modify or relocate an existing node support pole within the public right-of-way without first obtaining a right-of-way permit from the city. Prior to installation, modification or relocation of a network node on an existing pole or structure or modification or relocation of an existing node support pole, provider shall complete and submit to the city a commercial building (electrical) permit application and a right-of-way permit application in the form provided by the city, along with standard required documents and the following items: (1) Payment of the permit application fee and all other fees required under chapter 284, including but not limited to annual fees set forth in section 284.053(a) of chapter 284, as such fees may be adjusted from time to time pursuant to section 284.054 of chapter 284, and fees set forth in section 284.055 and section 284.056 of chapter 284, as applicable; (2) An aerial map showing the location of the existing pole or structure to which the network node is proposed to be attached; (3) Street view image showing the location of the pole which must include a before-and-after photo simulation image of the pole and all proposed attachments thereto and associate standalone equipment; (4) Construction and engineering drawings prepared by a professional engineer licensed in the state, and for wireless facilities proposed to be attached to a service pole, a decorative pole or other city-owned or -controlled structure, a certification from the engineer that the existing pole or structure and its foundations have sufficient structural stability to support the proposed network node and can bear the wind load without pole modification, or in the event the installation will require pole re-enforcement, that such re-enforced pole will have sufficient structural stability to support the proposed network node and can bear the wind load without further pole modification. Such construction and engineering drawings must also address the design of the connection of any item to the pole. If pole re-enforcement is necessary, provider shall provide construction and engineering drawings for the proposed alteration to the existing pole. Any re-enforcement or replacement of a pole shall match the color of the existing pole. Any pole re-enforcement or replacement shall be at provider's sole cost; (5) Geographic information system (GIS) data for the location of each proposed wireless facility in the form required by the city; (6) Detailed drawings, with calculations, showing strict conformity to the size limitations as set forth in chapter 284, in accordance with, but not limited to section 284.002, (relating to size of a micro network node), section 284.003 (relating to size of network nodes), and section 284.103 (relating to maximum pole height), as applicable; (7) A certificate that the network node complies with applicable regulations of the Federal Communications Commission; (8) Certification that the proposed network node will be placed into active commercial service by or for a provider not later than the sixtieth (60th) day after the date the construction and final testing of the network node is completed; (9) Documentation identifying the frequency on which the proposed network node will operate and a certification that the proposed network node shall not cause any interference with the city's traffic signal system, public safety radio system, private police cell system, or other city communications infrastructure; (10) The names and telephone numbers of at least two persons serving as emergency contacts for the provider who can be reached by telephone 24 hours a day, seven days a week, in the event of an emergency; (11) If the proposed network node(s) will be attached to a utility company's poles, then the provider shall submit documentation from the utility company stating that the network node included in the application can be attached to the utility company's poles; (12) If the proposed network node will be attached to a pole in the median of a roadway, then it must be located at least 200 feet back from the median nose; (13) Sealed engineering drawings for the electrical service providing power to the proposed network node, which must include the conduit size, circuit size, calculations for amp, and distances running. Provider shall use 120 voltage when connecting to any city service pole or decorative pole. A key to each meter must also be provided to the city ROW inspector with the city required lock code for final inspection. The city is entitled to disconnect power to the network node or other wireless facilities in emergency situations; (14) Scaled dimensional construction and engineering drawings that clearly show the existing public right-of-way line and easements. These drawings also must show all proposed network node related equipment to be installed and their spacing from the city's existing utility facilities, curbs, driveways, sidewalks and other existing poles. Such drawings shall also show a sectional profile of the public right-of-way and identify all existing utilities and existing utility conflicts; (15) Where required by the city based on the proposed scope of work, provider shall submit a traffic-control plan for required travel lane and sidewalk closures, stormwater pollution prevention plan, and/or trench safety plan; (16) Provider shall submit daily work location information, on the form provided by the city, before field work can begin each day; (17) Each network node application shall include a completed application checklist per the network code installation type; and (18) All other information required to be submitted by a right-of-way user in connection with a right-of-way permit application under this chapter 78 (streets, sidewalks and other public property) of this code or other applicable laws, ordinances, codes, rules and regulations of the city. (b) Installation of network nodes on new poles. A provider shall not install or modify a new node support pole or a network node on a new node support pole within the public right-of-way without first obtaining a right-of-way permit from the city. Prior to installation or modification of a new node support pole or a network node on a new node support pole, provider shall complete and submit to the city a commercial building (electrical) permit application and a right-of-way permit application in the form provided by the city, along with standard required documents and the following items: (1) Payment of the permit application fee and all other fees required under chapter 284, including but not limited to annual fees set forth in section 284.053(a) of chapter 284, as such fees may be adjusted from time to time pursuant to section 284.054 of chapter 284, and fees set forth in section 284.055 and section 284.056 of chapter 284, as applicable; (2) An aerial map showing the location of the proposed new node support pole and a street view image of the same; (3) Street view image showing the location of the pole, which must include before-and-after photo simulation images of the pole and all proposed attachments thereto and associated standalone equipment; (4) Geographic information system (GIS) data for the location of each proposed new node support pole in the form required by the city; (5) Certification that the proposed new node support pole is spaced apart from existing utility poles or node support poles at the same distance as the spacing between existing utility poles in the immediate proximity, but no less than a minimum of three hundred (300) feet from an existing utility pole or another node support pole, or the submission of evidence or other materials supporting a provider's claim that such requirement would have the effect of prohibiting the placement of new node support poles in the subject area; (6) Scaled dimensional construction and engineering drawings that clearly show the existing public right-of-way line and easements. These drawings also must show all proposed network node-related equipment to be installed and their spacing from the City's existing utility facilities, curbs, driveways, sidewalks and other existing poles. Such drawings shall also show a sectional profile of the public right-of-way and identify all existing utilities and existing utility conflicts; (7) Where required by the city based on the proposed scope of work, provider shall submit a traffic-control plan, stormwater pollution prevention plan, and/or trench safety plan; (8) Documentation identifying the frequency on which the proposed network node will operate and a certification that the proposed network node shall not cause any interference with the city's traffic signal system, public safety radio system, private police cell system, or other city communications infrastructure; (9) The names and telephone numbers of at least two persons serving as emergency contacts for the provider who can be reached by telephone 24 hours a day, seven days a week, in the event of an emergency; (10) Sealed engineering drawings for the electrical service providing power to the proposed network node, which must include the conduit size, circuit size, calculations for amp, and distances running. Provider shall use 120 voltage when connecting to any City service pole or decorative pole. A key to each meter also must be provided to the city ROW inspector with the city required lock code for final acceptance. The city is entitled to disconnect power to the network node or other wireless facilities in emergency situations; (11) Provider shall submit daily work location information, on the form provided by the city, before field work can begin each day; (12) If the location of the proposed new node support pole lies within right-of-way adjacent to a state or federal highway, the provider must provide evidence of a permit from the state or federal government; (13) Each network node permit application shall include a completed application checklist per the network node installation type; and (14) All other information required to be submitted by a right-of-way user in connection with a right-of-way permit application under this chapter 78 (streets, sidewalks and other public property) of this code or other applicable laws, ordinances, codes, rules and regulations of the city. (c) Installation of transport facilities. (1) A provider shall not install or modify a new transport facility within the public right-of-way without first obtaining a right-of-way permit from the city, including the submittal of a completed transport facility application checklist. Before beginning excavation in any public right-of-way, provider shall be responsible for complying with all laws relating to verifying the location of existing utility lines and facilities and avoiding encroachment thereon, including the requirements of this chapter 78 (streets, sidewalks and other public property) of this code. (2) Transport facilities shall be underground. Aerial power and fiber connections shall not be permitted. Provider shall submit daily work location information, on the form provided by the city, before field work can begin each day. (d) Electrical supply. Provider shall be responsible for obtaining any required electrical power service to the provider's wireless facilities. Provider's electrical supply shall be separately metered from the city and must match city infrastructure voltage. The city shall not be liable to the provider for any stoppages or shortages of electrical power furnished to the wireless facilities, including without limitation, stoppages or shortages caused by any act, omission, or requirement of the public utility serving the wireless facility structure or the act or omission of any other tenant or provider of the wireless facility structure, or for any other cause beyond the control of the city. (e) Appeal. A provider who has been denied a permit required under this article or who believes that fees imposed under this article are invalid or that the city has violated this article or chapter 284 may appeal such denial, fee imposition or alleged violation pursuant to section 78-43 (appeal) of this code.
( Ordinance 17-08-58 , sec. 3, adopted 8/15/17 ; Ordinance 2023-04-19 adopted 4/4/2023 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.