§ 94-31: Permit application.

(a) Significant industrial users required to obtain an industrial wastewater discharge permit shall complete and file with the environmental officer, an application upon a form provided by the city. A permit fee shall accompany the application. In support of the application, the significant industrial user shall submit the following information: (1) The user shall submit the name and address of the facility including the name of the operators and owners. (2) The user shall submit a list of any environmental control permits held by or for the facility. (3) The user shall submit a brief description of the nature, average rate of production, and the standard industrial classification of the operation carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. (4) The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: a. Regulated process streams; and b. Other streams as necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e). The environmental officer may allow for verifiable estimates of these flows where justified by cost or feasibility considerations. (5) Wastewater constituents and characteristics including but not limited to those mentioned in this article, and any federal, state or local standards. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to section 304(g) of the Act; in 40 CFR 136, as amended; and 40 CFR 403.12(b)(5), as amended. (6) A statement, reviewed by an authorized representative of the industrial user (as defined in section 94-33), and certified to by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements. (7) If additional pretreatment and/or O&M will be required to meet the pretreatment standards; the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to the schedule required by this subsection: a. The schedule will contain increments of progress in the form of date for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing plans, executing contract for major components, commencing construction, completing construction, etc.). b. No increment referred to in subsection (a)(7)a. shall exceed nine months. Not later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the environmental officer including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the environmental officer. (8) Any other information as deemed necessary by the environmental officer to evaluate the permit application. (b) The environmental officer shall issue a permit if he determines that pretreatment facilities are adequate for efficient treatment and that discharged wastes will comply with all applicable pretreatment standards and requirements, including those imposed by this article.

( Ordinance 96-02-01 , sec. A, sec. 13, adopted 2/6/96 )