§ 1.22: Pre-Construction Meeting.
(A) Purpose. The purpose of a Pre-Construction Meeting is to discuss administrative, communication and operating procedures for project construction prior to the issuance of a Site Permit (see Chapter 4, Article 1, Division 3) or Building Permit (see Chapter 4, Article 1, Division 4). A list of typical inspection items, procedures and acceptance criteria for items in public right-of-way and easements will be also be furnished to the applicant. (B) Requirement. Following the approval of required Site Engineering Drawings and prior to commencement of any construction, the applicant(s) shall attend a required Pre-Construction Meeting with the Engineering Department. Applicants must begin construction within sixty (60) days of any Pre-Construction Meeting. If an applicant fails to begin construction within sixty (60) days, an additional Pre-Construction Meeting shall be held and the deadline for commencement of construction shall be extended an additional sixty (60) days from said meeting to begin construction. Projects that require a Pre-Construction Meeting are those for which a Site Permit or a Building Permit is required. (C) Notice. (1) When the applicant receives notice from the City that the required Site Engineering Drawings have been approved, the project will then be eligible for the required Pre-Construction Meeting. (2) If appropriate, a single Pre-Construction Meeting may be held for the issuance of both a Site Permit and a Building Permit. However, if the applicant chooses to begin construction of the project prior to approval of a Building Permit, two separate Pre-Construction Meetings shall be required. (D) Written Records. Written records of Pre-Construction Meetings shall be kept in the office of the Engineering Department as part of the record for each development application or project. A copy of the written record of the Pre-Construction Meeting shall also be provided to any applicant participating in such meeting upon written request by such participant. (E) Effect. Following the Pre-Construction Meeting, and provided that all other City pre-construction requirements have been met, the applicant shall be issued a Site Permit (and possibly also a Building Permit, if applicable and if all City requirements for a Building Permit have also been met) which allows the applicant to commence with construction of the project.
( Ordinance 6773 adopted 5/19/15 ; Ordinance 7055 , sec. 2, adopted 5/7/19 )
Ask a question about Garland law
Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.