§ 3.43 — Conformance to Plans
Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Development Code § 3.43
Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/3369abbb-b300-475b-97a1-8c989325353f
§ 3.43: Conformance to Plans.
(A) Capital Improvements Generally. Proposed capital improvements serving new development shall conform to and be properly related to the public facilities elements of the City’s adopted Comprehensive Plan, other adopted master plans for public facilities and services, and applicable capital improvements plans, and shall meet the service levels specified in such plans. (B) Major Thoroughfare Plan. No Final Plat shall be approved for any subdivision within the City or its ETJ until there is adequate provision for thoroughfares as shown on the Major Thoroughfare Plan, as approved by the City. (1) No Amendment Necessary. Subject to approval of the Director of Transportation, whenever a street connection or alignment is made, whether or not it is similar to the exact alignment shown on the Major Thoroughfare Plan, no other Major Thoroughfare Plan amendment shall be necessary. The design and construction of the proposed thoroughfare shall be in conformance with the City’s master plans for thoroughfares and with the Technical Standards, and shall be subject to approval by the Directors of Transportation and Engineering. Such approvals shall be required prior to Final Plat approval. (2) Amendment Necessary. If a different roadway type is proposed or if the connection is not proposed to be made, then the Major Thoroughfare Plan shall be amended prior to Final Plat approval, and upon provision of a Traffic Impact Analysis (TIA) of the proposed amendment in accordance with Article 5, Division 5 of this Chapter 3. (C) Water and Wastewater Plans. (1) Construction Requirements. (a) All public water and wastewater mains shall be located in the frontage along streets, or in easements adjacent to the development, in order to provide service to adjacent property. (b) Water and wastewater lines shall be extended along the entire frontage of the development adjacent to a street. If the development is not adjacent to a street, water and wastewater lines shall be extended in such a manner as to allow convenient future connections to new developments. If new developments will never be constructed beyond the development under construction due to physical constraints, the Director of Engineering may waive this requirement. (c) Public water and wastewater mains shall not be located within a private street, drive or access easement unless a city utility easement is provided for the mains. (d) No portion of a building or structure shall encroach over or into any public easement. (e) A utility easement for water or wastewater between two lots must be entirely contained within a single lot. (f) When it is necessary to relocate or replace an existing water or wastewater facility to accommodate a proposed subdivision, the developer is responsible for all costs associated with the relocation including the acquisition of necessary easements, except for oversize participation. (2) Construction Plans. Plans for construction of all water and wastewater facilities required by this GDC shall be prepared in accordance with the requirements and specifications contained in the City’s Technical Standards, the regulations of the Texas Commission on Environmental Quality (TCEQ) or its successor agency, and the City’s current adopted Fire Code. Plans for the improvements shall be prepared by an engineer licensed in the State of Texas, and shall be in a form and format acceptable to the Director of Engineering. (3) Acquisition of Easements. The developer shall be responsible for the acquisition of all required off-site easements. (4) No Warranty of Availability. The City makes no representations or warranties that water supply or wastewater capacity will be available at any particular time or place. (5) Lines Generally. Water or wastewater service lines shall not cross any adjacent lot. The public main shall be extended so as not to require the service to extend across another lot. Public water and wastewater mains adjacent to a roadway owned by a governmental entity other than the City shall be constructed outside the right-of-way in a separate easement unless otherwise agreed by those entities and the City.”
( Ordinance 6773 adopted 5/19/15 ; Ordinance 7055 , sec. 12, adopted 5/7/19 )
Ask a question about Garland law
Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
