For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.99 — Approval

Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Development Code § 3.99

Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/256c2420-18b1-4554-86e4-156492ac783f

§ 3.99: Approval.

(A) Approval Letter. Upon completion of the plan review process, the Director of Engineering shall notify the applicant of approval of the Site Engineering Drawings. (B) Procedure. When the Site Engineering Drawings are approved: (1) The City shall stamp “Release for Construction” on one full reproducible set of the Site Engineering Drawings and issue it to the applicant (refer to Technical Standards for further information). (2) A full set (copy) of the City-approved and stamped Site Engineering Drawings shall be available for inspection on the job site at all times. (C) Effect. Approval of Site Engineering Drawings along with the City’s “Release for Construction” stamped plans authorizes the applicant to schedule a Pre-Construction Meeting in accordance with Section 1.22 in Chapter 1 of this GDC, and subsequent issuance of a Site Permit in accordance with Article 1, Division 3 in Chapter 4 of this GDC. A Site Permit shall only be issued following the mandatory Pre-Construction Meeting and after all relevant fees have been paid. Upon issuance of a Site Permit, the applicant may proceed with construction of all items reflected on the Site Engineering Drawings.

( Ordinance 6773 adopted 5/19/15 )

Ask a question about Garland law

Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.