§ 51.107: Registration and construction permits.

(A) Registration. (1) In order to protect the public health, safety and welfare, all users constructing, installing, maintaining or operating facilities in the right-of-way will register with the director. Registration and permits will be issued in the name of the entity that owns or will own the facilities. Registration must be renewed before January 31 biennially after the effective date of this article. If a registration is not renewed and subject to thirty (30) days’ written notice, the facilities of the user will be deemed to have been abandoned. When any information provided for the registration changes, the user will inform the director in writing no more than thirty (30) days after the date the change is made. (2) Registration shall include: (a) The name of the user of the right-of-way; (b) The name, address and telephone number of people who will be contact person(s) for the user; (c) The name, address and telephone number of any contractor or subcontractor, if known, who will be working in the right-of-way on behalf of the user; (d) The name(s) and telephone number(s) of an emergency contact who shall be available 24 hours a day; (e) Proof of insurance and bonds, as follows: (i) An applicant must provide proof of liability insurance in the amount of six million dollars ($6,000,000.00); one million dollars ($1,000,000.00) primary plus five million dollars ($5,000,000.00) umbrella or other securities as acceptable to the director. (ii) The coverage must be on an “occurrence” basis and must include coverage for personal injury, contractual liability, premises liability, medical damages, underground explosion and collapse hazards, and workers compensation insurance in the amounts required by law. (iii) Each policy must include a cancellation provision in which the insurance company is required to notify the director in writing not fewer than thirty (30) days before canceling, failing to renew, or reducing policy limits. (iv) The applicant shall file, with the director, the required original certificate of insurance showing the City as an additional insured prior to any commencement of work. The certificate shall state the policy number; name of the insurance company; name, address and telephone number of the agent or authorized representative of the insurance company; name, address and telephone number of insured; policy expiration date; and specific coverage amounts. (v) Applicant shall file a surety bond, which will be valid prior to the commencement of any construction through two full years after the completion of the construction and satisfactory restoration of the right-of-way, from a surety company authorized to do business in the state (and acceptable to the City) in the amount of the estimated amount of the value of the work to be performed that year, but in no case less than $100,000.00, to guarantee that the restoration of the right-of-way in the event the applicant leaves a job site in the right-of-way unfinished, incomplete or unsafe. (vi) Proof of insurance requirements may be met by utilities with a current franchise or license agreement that provides for insurance or bonds in at least the amounts enumerated above. (vii) Self-insurance. With respect to the user’s obligation to comply with the requirements to provide proof of liability insurance coverage, the City may allow the user to self-insure upon annual production of evidence that is satisfactory to the City’s risk manager. (B) Construction permits. (1) No person shall perform any construction, maintenance or installation of facilities, whether aboveground or underground, in the right-of-way without first obtaining a construction permit, except as provided herein. The permit will be in the name of the person who owns or will own the facilities to be constructed, maintained, repaired, or upgraded. The permit application must be completed and signed by a representative of the owner of the facilities to be constructed. (a) Emergency responses related to existing facilities may be undertaken without first obtaining a permit; however, the director shall be notified in writing, on a form approved by the director, on the next business day of any construction related to an emergency response; including a reasonable detailed description of the work performed in the right-of-way and an updated map of any facilities that were moved or repaired. (b) The phrase “construction, maintenance or installation of facilities” does not include the installation of facilities necessary to initiate service from the right-of-way directly adjoining a customer’s property to the customer’s property, or repair or maintenance of existing facilities unless such repair or maintenance requires the breaking or cutting of pavement, the closure of a nonresidential traffic lane, or excavation within the right-of-way or boring. (2) The permit shall state to whom it is issued, location of work, location of facilities, dates and times work is to take place and any other conditions set out by the director. (3) The person requesting a permit will provide the director with documentation in the format specified by director, including: (a) The proposed, approximate location and route of all facilities to be constructed, installed or maintained and the applicant’s plan for right-of-way construction. (b) Unless otherwise approved by the director, five (5) sets of engineering plans signed and sealed by an engineer licensed to practice in the state, at a scale not to exceed one inch (1") equals fifty feet (50'). These plans shall include, but not be limited to: (i) Details of the location of all right-of-way and utility easements that applicant plans to use. (ii) Details of all existing City and non-City utilities and facilities in relationship to applicant’s proposed route. (iii) Details of what applicant proposes to install, such as pipe size, valves, etc. (iv) Details of plans to remove and replace asphalt or concrete in streets, driveways, alleys and sidewalks. (v) Drawings of any bores, trenches, handholes, manholes, switch gear, transformers, pedestals, etc. including depth. (vi) Handholes and manholes typical of the type of manholes and handholes applicant plans to construct, use or access. (vii) Complete legend of drawings submitted by applicant. Applicant may submit a standard legend for all permit applications, provided the applicant submits updated or revised versions of the standard details. (viii) A traffic-control plan. (ix) Compliance with the City’s NPDES stormwater permit requirements and other provisions of the Federal Clean Water Act. (x) Any other information as required by the director or his directives. (c) The name, address and phone numbers of the contractor and subcontractor who will perform the actual construction, including the name and telephone number of an individual with the contractor who will be available at all times during construction. Such information shall be required prior to the commencement of any work. (d) The construction and installation methods and materials to be employed for the protection of existing structures, fixtures, and facilities within or adjacent to the right-of-way, and the dates and times work will occur, all of which (methods, dates, times, etc.) are subject to approval of the director. (e) A statement that proof of insurance, bond or other required financial information is current and on file. (f) Detailed emergency procedures and a list of “on-call” contacts. (g) A statement that all necessary and applicable state and federal permits have been obtained for the project and that the user is in compliance with those permits. (4) All construction, installation and maintenance in the right-of-way shall be in accordance with the permit for the facilities and the ordinances of the City. The director shall be provided access to the work and to such further information as he may reasonably require to ensure compliance with the permit. The director may order the immediate cessation of work under a permit if he determines that this article or the permit has been or is being violated. This order may be given orally to persons working in the right-of-way pursuant to the permit, who shall cease further work until approved by the director. (5) A copy of the construction permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the director at all times when construction or installation work is occurring. (6) All construction, installation and maintenance work authorized by permit must be completed in the time specified in the construction permit. If the work cannot be completed in the specified time periods, the right-of-way user may request an extension from the director. Approval of extensions shall be at the discretion of the director. Failure to complete the work within the time specified in the construction permit, or within any applicable period of extension, shall constitute a violation of sections 51.104 and 51.105 of this article and subject the violator to the civil and criminal penalties set forth therein. (7) A copy of any permit or approval issued by federal or state authorities for work in federal or state rights-of-way located in the City shall be maintained at the construction site and made available for inspection by the director at all times when construction or installation work is occurring. (8) A request for a permit, complete with all information required under this section, must be submitted at least fifteen (15) working days before the proposed commencement of work proposed in the request, unless waived by the director or in an emergency, or as provided in subsection (B)(1)(a) of this section. (9) The director may require a preconstruction meeting with the right-of-way user and the user’s construction contractor. (10) Requests for permits will be approved or disapproved by the director within a reasonable time after receiving all necessary information. (11) Permit applications are required for construction on new, replacement or upgrading of company’s facilities in the right-of-way, whether aerial or underground. (C) Any person performing work in the City’s rights-of-way shall pay an annual license fee in the amount designated in the Master Fee and Rate Schedule, Article VII, Section 10.85, of Chapter 10. This licensing requirement shall not apply to: (1) Employees of a certificated telecommunications provider (“CTP”) performing work on behalf of the employing CTP; (2) Employees of wireless network providers constructing, maintaining, or operating a network node or transport facilities; (3) Employees of a holder of a state-issued certificate of franchise authority performing work on behalf of the holder; (4) Employees of a person having a franchise agreement with the City while performing work on behalf of that person; (5) Persons working in the City’s rights-of-way on behalf of the City; and (6) Persons performing minor landscaping, maintenance, irrigation, or similar activities as determined by the director. (D) Application fees. A wireless network provider desiring to construct, maintain, or operate a network node, pole, or transport facility within a City right-of-way shall pay the amounts designated in the Master Fee and Rate Schedule, Article VII, Section 10.85, of Chapter 10 for each application covering up to five network nodes, for each additional network node per application, and for each application for each pole. (E) Annual right-of-way rates for network nodes. Wireless network providers constructing, maintaining, or operating a network node in a right-of-way within the City shall pay an annual public right-of-way rate the amounts designated in the Master Fee and Rate Schedule, Article VII, Section 10.85, of Chapter 10, or the maximum amount allowed under state law, as amended, including any consumer price index adjustments. The annual public right-of-way fee shall be due no later than January 31st of each year. For new installations, the annual public right-of-way fee shall be pro-rated as of the date of the permit. (F) Monthly right-of-way rate for transport facilities. Wireless network providers constructing, maintaining, or operating transport facilities, as defined by chapter 284 of the Texas Local Government Code, as amended, in a right-of-way within the City shall pay a monthly right-of-way use rate in the amount designated in the Master Fee and Rate Schedule, Article VII, Section 10.85, of Chapter 10, multiplied by the number of the network provider’s network nodes located in the public right-of-way for which the installed transport facilities provide backhaul unless or until the time the network provider’s payment of fees to the City exceed its monthly aggregate per-node compensation to the City, or the maximum amount allowed under state law. The fee will be assessed at the time the electric meter servicing the network node is activated. (G) Annual service pole rate. Wireless network providers desiring to construct, maintain, or operate network nodes on service poles, as defined by chapter 284 of the Texas Local Government code, must enter into a service pole collocation agreement with the City, and pay a service pole rate in the amount designated in the Master Fee and Rate Schedule, Article VII, Section 10.85, of Chapter 10, or the maximum amount allowed under state law. The service pole rate is in addition to any other public right-of-way rate authorized under this chapter or state law. (H) Permits are not transferable to another user or another location, unless authorized by state or federal law.

( Ordinance 5504 , sec. 1, adopted 9/19/00 ; Ordinance 6054 , sec. 9, adopted 9/19/06 ; Ordinance 6928 , sec. 3, adopted 8/15/17 ; Ordinance 7363 adopted 9/6/2022 )