§ 13-399 — Right of entry: inspection and sampling
Code of Ordinances, City of Grand Prairie, Texas (Supp. No. 117, Update 1: codified through Ordinance No. 1857-2026, adopted April 27, 2026) · Grand Prairie City Code § 13-399
Corpus is an independent public-information project, not the official City of Grand Prairie website. Stable reference: corpuslaw.us/code/b7bb8baf-6955-4e79-9eb6-901ad960776f
Sec. 13-399. - Right of entry: inspection and sampling.
(a) The regulatory authority and/or the control authority, TCEQ, or EPA or their designated representative(s) shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this article and any wastewater discharge permit or order issued hereunder. Users shall allow the inspecting or sampling person(s) ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. (b) Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, regulatory authority, control authority, TCEQ, or EPA personnel will be permitted to enter without delay for the purposes of performing specific responsibilities. (c) The regulatory authority and/or control authority shall have the right to set up on the user's property, or require installation of such devices as are necessary, to conduct sampling and metering of the user's operations. All sampling and analysis performed by the regulatory authority and/or control authority to monitor compliance shall be at the expense of the industrial user. (d) The regulatory authority may require the user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated, at a minimum, annually to ensure their accuracy. (e) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the regulatory authority and shall not be replaced. The costs of clearing the access shall be borne by the user. (f) Unreasonable delays in allowing an inspecting or sampling person access to the user's premises shall be a violation of this article. (g) In accordance with 40 CFR § 403, the regulatory authority shall inspect and monitor each significant industrial user a minimum of once per year. If the regulatory authority elects to perform compliance monitoring for the significant industrial user, then the regulatory authority will monitor the industry a minimum of semiannually. (h) The regulatory authority shall inspect each NSCIU a minimum of once per year. If the regulatory authority elects to perform compliance monitoring for the NSCIU then the regulatory authority will monitor the industry a minimum of one (1) time each permit cycle.
(Ord. No. 11628-2024, § 1, 10-15-24)
Ask a question about Grand Prairie law
Corpus searches the Grand Prairie sections it holds and shows the ones that match, with their citations. Free, no sign-in.
