Sec. 30-33. - Performance tests, monitoring

(a) Not later than one hundred eighty (180) days after any new, or not later than ninety (90) days for any substantially rebuilt, portion of the system is made available for service to subscribers, and at least annually thereafter, technical performance tests shall be conducted by a grantee to demonstrate full compliance with the technical standards of the Federal Communications Commission and this chapter. Such tests shall be performed by or under the supervision of a qualified registered professional engineer or an engineer with proper training and experience. A copy of the report shall be submitted to the city manager, describing test results, instrumentation, calibration, test procedures and the qualifications of the engineer responsible for the tests. (b) In accordance with Federal Communications Commission rules and regulations, system monitor test points shall be established at or near the output of the last amplifier in the longest feeder line, at or near trunk line extremities, at not fewer than six (6) widely scattered locations. At least twice each year, a grantee shall obtain and record the following data for each monitor test point, and make available for city inspection and retain in a grantee's files until the relevant portion of the system has been either substantially rebuilt or replaced: (1) Visual and aural carrier level on each active channel. (2) Carrier-to-noise ratio on at least four (4) frequencies distributed across the pass band (to avoid interrupting service as these measurements may be approximate and will be used only to detect significant changes). (3) Visual inspection of picture quality on all active channels to detect degradation in quality attributable to the system. (c) In the event that Federal Communications Commission rules on the testing and monitoring should be changed to allow more frequent testing, a grantee shall increase its technical performance tests to comply with new rulings up to a limit of once per month. (d) At any time after commencement of service to subscribers, the city may require additional tests, full or partial repeat tests, or tests involving a specific subscriber's terminal. Requests for such additional tests will be made on the basis of complaints received or other evidence indicating an unresolved controversy or significant noncompliance. The tests will be limited to the particular matter in controversy. The city will make its requests for such special tests so as to minimize hardship or inconvenience to a grantee or subscribers. (e) A grantee shall continue, through the term of its franchise, to at least maintain or improve the technical, operational, and maintenance standards and quality of cable service set by the city in its franchise with the grantee or by ordinance. Should the city find that the grantee has failed to maintain these standards and quality of cable service, then the city may list improvements to be made, [and] the grantee shall make such improvements. Failure to do so within a reasonable time period established by the city after consultation with the grantee will constitute a material breach of the franchise.

(Ord. No. 5344, § 1, 11-15-94)