For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 48-133 — Water connection fees

Code of Ordinances, City of Harlingen, Texas · Harlingen Code of Ordinances § 48-133

Corpus is an independent public-information project, not the official City of Harlingen website. Stable reference: corpuslaw.us/code/5eb3589f-cf4a-43d9-aa50-2fa9262b2097

§ 48-133: Water connection fees.

(a) Fee schedule. As a prerequisite for connecting to the water system, the waterworks system utility trustees adopted a schedule of fees designed to recover installation and oversizing costs of the water system. A description of the various fees follows: (1) Front footage charge. a. Front footage shall be charged to each lot, block, or parcel of property which abuts a water main installed and/or paid for by a third party developer or the waterworks system. Front footage charges will not be applicable within subdivisions or other developments when a complete central water system was provided as a part of the development. Front footage and fire protection charges are due and payable prior to connection to the water system. b. Front footage charges for water mains which serve adjoining property on both sides of the water main shall be based on the size of the main serving the property or that portion of an oversized main required to serve the property (eight-inch minimum). If a parcel of property has or will have, due to a developer installed extension, water lines on more than one side, but service from only one side, the front footage will be chargeable for the average of the sides abutting the water mains. However, parcels of property served from more than one side shall pay the front footage for all sides from which service is rendered. Front footage charges for water mains which can serve property on only one side of the water main, such as along an expressway, shall be twice the charges as noted above. c. The front footage charge shall be set from time to time by the utility trustees to be based on the estimated cost to recover the installation of the waterlines installed in accordance with subsection (a)(1)b of this section. (2) Fire hydrant charge. a. Fire hydrant charges are designed to recover the cost of installing fire hydrants to meet the criteria of the state board of insurance. If an adequate number of fire hydrants and/or system flow capability does not meet the current state board of insurance requirements, new customers will be required to pay the actual cost of upgrading the fire protection service. b. The fire hydrant charge shall be set from time to time by the utility trustees to be based upon the estimated cost to recover the installation of the fire hydrants installed in accordance with subsection (a)(2)a of this section. (3) Water meter installation charge. a. Upon written application and payment to the waterworks system for the charges required herein, the waterworks system shall furnish all labor, material, and equipment necessary, in accordance with the standard construction specifications of the waterworks system, to provide water service to the customer's property line. Each applicant shall pay to the waterworks system, prior to the installation and/or initial use, a water meter installation charge. b. Backflow preventers shall be required by the waterworks system or its designate if deemed necessary to protect the water system from possible contamination. c. Water meter installation charges shall be set from time to time by the utility trustees to be based on the estimated cost to recover installation of the said water meters. (4) Construction inspection charge. a. The construction inspection charge recovers the costs of providing construction inspection services for new water line construction. The construction inspection charge shall cover normal construction service from 7:30 a.m. to 5:30 p.m., Monday through Saturday, excluding holidays. Contractors wanting to work on Sundays, holidays, or extra long hours shall make prior arrangements with the waterworks system and will be required to pay the actual cost of this additional inspection service in addition to the fees charged for normal workday installation. b. Construction inspection charges shall be set from time to time by the utility trustees to be based upon the estimated cost to recover the cost of providing construction inspectors as required by the preceding subsection (a)(4)a of this section. (b) Fees for services outside city limits. The water connection fees for the preceding subsection (a) of this section shall be 150 percent of those set forth in said subsection for services provided outside the city limits.

( Code 1973, §§ 30-120, 30-121 ; Code 1997, § 51.043 ; Ordinance 81-96 , adopted 12/23/1981 ; Ordinance 83-97 , adopted 11/16/1983 )

Ask a question about Harlingen law

Corpus searches the Harlingen sections it holds and shows the ones that match, with their citations. Free, no sign-in.