§ 48-225 — Connecting to existing oversized main or lift station; fee

Code of Ordinances, City of Harlingen, Texas · Harlingen Code of Ordinances § 48-225

Corpus is an independent public-information project, not the official City of Harlingen website. Stable reference: corpuslaw.us/code/abd419db-f256-41aa-9ad8-642084eb3614

§ 48-225: Connecting to existing oversized main or lift station; fee.

The utility department may allow newly proposed subdivisions and/or wastewater disposing facilities of other entities to tie on to preinstalled oversized gravity mains and/or oversized lift stations, when such properties are adjacent to or in the serviceable area of such oversized gravity mains and/or lift stations, under the following conditions: (1) Newly proposed subdivisions and other entities requiring city wastewater service may be allowed, by the utility department, to tie on to previously installed oversized gravity mains and/or oversized lift stations, when such newly proposed subdivisions or other entities are located adjacent to or in the area contemplated to be serviced by such preinstalled oversized mains and/or lift stations, and under conditions of the utility department having predetermined that such proposed new subdivision or subdivisions or other entities may be adequately serviced by such preinstalled, oversized mains and/or lift stations. The utility department shall determine, by best estimate, the maximum amount of wastewater discharge required to be serviced for such proposed new subdivision and further determine the percentage the same constitutes of the maximum handling capacity of such oversized gravity main and/or lift station. This percentage shall then be multiplied by the cost of installation of such lift station and the cost of installation of that portion of such oversized gravity main between the point of tie-on and such lift station and/or down flow terminal point of such oversized gravity main, and the total of such resulting products shall constitute the tie-on fee. (2) Permit for such tie-on shall be granted by the utility department upon its satisfactory determination of the foregoing and upon payment to the city of such tie-on fee. Such tie-on fee shall be in addition to tap fees and/or user fees as hereinafter provided for.

( Code 1973, § 30-75 ; Code 1997, § 51.061 ; Ordinance 78-24 , adopted 4/19/1978 )