Code of Civil and Criminal Ordinances of the City of Irving, Texas (Irving Code of Civil and Criminal Ordinances, Charter and Land Development Code current through legislation adopted September 24, 2026 (eCode360 publication IR6873, scraped 2026-11-17)) · Irving Code of Civil and Criminal Ordinances § 41-7
Corpus is an independent public-information project, not the official City of Irving website. Stable reference: corpuslaw.us/code/48d9ab95-b652-42c1-af0c-df75f5ef6109
§ 41-7: Adequate water and wastewater infrastructure capacity review.
(a) Water system capacity review. (1) Applicant seeking to develop property in the city must provide city staff the following: a. The proposed land use category as classified in the Irving Unified Development Code; b. Number of water connections; and c. Proposed water demand as calculated in the Water and Wastewater Design Manual. (2) Staff shall evaluate provided information and determine if the use is consistent with the future land use modeled in the most current version of the city's Water Master Plan at the time of applicant's submission. a. If development is consistent with the future land use, the applicant will not be required to undertake any additional capacity analysis. b. If the development is not consistent with the future land use, applicant will be required to have a Capacity Analysis Study ("CAS") completed by the Water Master Plan Engineering Firm of Record at the cost of the applicant. The CAS will include: 1. A hydraulic evaluation of the city's Water Master Plan models to evaluate if the water system has capacity to meet the increased demand for the proposed development. 2. An evaluation to confirm compliance with the Minimum Water System Capacity Requirements in Title 30 Texas Administrative Code, Section 290.45 in addition to the city's Water and Wastewater Design Manual. 3. Identifying infrastructure improvements, if any, that will be required to meet the standards set forth in this chapter. 4. Engineering plans for the identified improvements shall be submitted for review and approval prior to issuance of any building or grading permits. Required public improvements must be complete and accepted prior to connection. (b) Wastewater system capacity review. (1) Applicant must provide: a. The proposed land use category as classified in the Irving Unified Development Code; b. Number and size of wastewater service connections; and c. Proposed flow as calculated in the Water and Wastewater Design Manual. (2) Staff will evaluate provided information and determine if the use is consistent with the future land use modeled in the most current version of the City of Irving's Wastewater Master Plan at time of application. a. If development is consistent with the future land use, no additional capacity analysis will be required. b. If the development is not consistent with the future land use, applicant will be required to have a Capacity Analysis Study (CAS) completed by the Wastewater Master Plan Engineering Firm of Record at the cost of the applicant. The CAS will include: 1. An evaluation of the city's masterplan models to evaluate if the wastewater system has capacity to meet the increased flow for the proposed development. 2. An evaluation to confirm compliance with Title 30 Texas Administrative Code, Chapter 217 in addition to the City of Irving Water and Wastewater Design Manual. 3. CAS will identify infrastructure improvements, if any, that will be required to meet the standards set forth in this chapter.
( Ordinance 2025-11144 adopted 8/28/2025 )