§ 26-147 — Criteria for parkland development
Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 26-147
Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/742a8b9f-f107-4075-8b00-d34f65f0246b
Sec. 26-147. - Criteria for parkland development.
A. Generally. A property owner/developer may propose to develop public parkland in whole or part rather than paving the park development fee. B. Applicability. This division only applies to parkland being dedicated to the city as public parkland or privately owned parkland that is being used as credits toward meeting the park development fee. C. Minimum development requirements. 1. Design, specification and construction. Design, specification, and construction of the improvements shall be subject to review and approval by the city and shall be in conformance with the Complete Park principles set out in the Parks Plan so that parkland design is purposeful regarding accessibility, safety and level of comfort, sociability, activation, and future maintenance. 2. Special design considerations for private pocket parks. The inclusion of privately owned pocket parks to offset parkland dedication and development fee requirements shall conform to the following. a. Each pocket park shall be centrally located within every phase of a parcel proposed for development so that all lots or units are located no greater than ¼-mile from the edge of a privately-owned pocket park, or other privately owned/public parkland. The ¼-mile distance shall be measured using walking distance along sidewalks and trails. b. The pocket park shall take access from a local street and be no smaller than the average lot size of the lots platted in that phase of the subdivision, or ½-acre, whichever is larger. c. At a minimum, the pocket park shall include an ADA-compliant trail connecting all amenities to the sidewalk, a shaded children's play area (ages 2—12), swings, a shade pavilion with a minimum of one (1) picnic table, social seating, fitness activity, and other site furnishing typical of a pocket park. d. In addition, each pocket park shall include at least one (1) of the following: mini-sports court, community garden, open grass play area, enclosed off-lease area for dogs, or other amenity approved by the parks director. 3. Special design considerations for public or private neighborhood parks. The inclusion of privately owned neighborhood parks to offset parkland dedication and development fee requirements shall conform to the following: a. Each neighborhood park should be centrally located within the parcel proposed for development to maximize access to as many residents as possible. b. The neighborhood park shall take access from local or collector street and be no smaller than three (3) acres in size. c. At a minimum, the neighborhood park shall include the same minimum requirements as a pocket park, as defined in subsections C.2.c. and C.2.d., above. d. In addition, each neighborhood park shall include an ADA-compliant loop trail and three (3) of the following additional amenities: neighborhood serving pool, full sports court or field, community garden, enclosed off-lease area for dogs, shaded picnic pavilion with at least two (2) picnic tables, or other neighborhood-scaled amenity approved by the parks director. 4. Special design considerations for public or private trail development. When a parcel proposed for development includes a thoroughfare or greenway trail, as identified on the Killeen Future Trail Segments Map of the Killeen Parks Plan, or trail development in general, the property owner/developer shall be responsible for constructing and extending the trail segments across the property, as may be applicable, the placement, construction, and dedication of trails shall comply with the following: a. For greenway trails located in floodplains, this requires dedication of the property to the City and construction of the trail to city specifications. b. For thoroughfare trails (i.e., oversized sidewalks along priority corridors to facilitate citywide recreational and transportation connections), this requires construction to city specifications and dedication as part of future right-of-way. c. This also requires the placement and construction of appropriate neighborhood connector trails throughout the parcel proposed for development so that adequate access is provided to the greenway and thoroughfare trail system. These connectors shall be protected by permanent 20-foot access easements. d. When a parcel proposed for development abuts off-site floodplain which is identified as a priority trail corridor, the property owner/developer shall ensure connection to the off-site greenway trail corridor by dedicating one (1) or more 20-foot access easements which provide access to the property. e. In no instance may a property owner/developer prohibit, through the use of subdivision of lots or other improvements, the future development of the city's regional greenway trail system. f. Areas within the parcel proposed for development which include connector trails to the City's existing or proposed greenway system shall be owned and managed in perpetuity as part of common property of a property owners association, or dedicated, as may be set out in the Park Development Agreement. g. All trail development used to meet the requirements of these regulations shall be developed per the cross-sections set out in the Parks Plan and other city specifications and have a 20-foot minimum public access easement based on the centerline of the trail. h. At a minimum, all trails need to include site furnishings. When not provided elsewhere within the parcel proposed for development, the trail system shall be further amenitized meeting the same minimum requirements as a pocket park, as defined in subsections C.2.c. and C.2.d., above. 5. Timing. Construction of the infrastructure, facilities, and amenities for the portion required for the final plat(s) approval must be completed within the time period prescribed in the park development agreement; or, within three (3) years of the city's approval of the first final plat of the subdivision, when the applicant has not entered into a park development agreement.
(Ord. No. 23-003, § I, 1-10-23)
Ask a question about Killeen law
Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
