§ 30-74 — Monitoring, inspections, and sampling
Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 30-74
Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/a17caa5b-4626-4a73-8abf-ba16ab55b1bb
Sec. 30-74. - Monitoring, inspections, and sampling.
(a) Discharge survey. The director may require, and an industrial user shall submit, information relating to the nature and characteristics of a user's discharge by completing a wastewater survey on a form prepared by the director. Failure to complete and return the survey within thirty (30) days of receipt of the notice of requirement shall be a violation of this division. Receipt is presumed to have occurred five (5) days following the date of mailing the discharge survey. (b) The director may require a user to provide and operate monitoring facilities to allow inspection, sampling, and flow measurements of the building sewer and/or internal drainage systems at the user's own expense when facts exist establishing that there is a reasonable probability that a user's discharge exceeds allowable limits and adequate facilities for inspection, sampling or measurement do not currently exist. "Reasonable probability" may be established, for example and without limitation, when: information provided in a completed discharge survey, as required by subsection (a) of this section, indicates that the user's discharge contains substances or pollutants prohibited by section 30-73 of this division; the condition of the wastewater system downstream from the user's facility indicates that substances or pollutants in excess of allowable limits are adversely affecting the wastewater system or are attributing to a waste stream that exceeds the levels of normal domestic wastewater; or, upon inspection and/or consultation with a user, when the director determines that a user's operations do not employ BMPs that will prevent prohibited levels of substances or pollutants from being discharged into the wastewater system. (1) When required by the director, the owner of any property served by a building sewer carrying industrial wastewater shall install a control point at user's expense. (2) The monitoring facility or control point should normally be situated on the user's premises near the property line, but the director may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public right-of-way or sidewalk area and located so that it will not be obstructed. Relating to control points necessary to verify compliance with division 3, Fat, Oil and Grease Control and Prevention, of this article, control points may be installed either downstream from where industrial wastewater from a grease or grit trap on the building sewer mixes with normal domestic wastewater or prior to that point, but following the industrial wastewater's introduction to the building sewer. (3) There shall be ample room in or near monitoring facilities or control point(s) to allow accurate sampling and preparation of samples for analysis. All equipment that is part of the monitoring facilities shall be maintained at all times in a safe and proper operating condition at the expense of the user. (4) Whether constructed on public or private property, the monitoring facilities shall be provided in accordance with the director's requirements and all applicable local construction standards and specifications. Construction shall be completed within one hundred-twenty (120) days following written notification by the director. (c) The director shall inspect and monitor all users whenever the director deems that it is necessary to determine whether such users are in compliance with divisions 2, 3, 4 or 5 of this article. (d) Persons or occupants of premises where waste or wastewater is created or discharged, and any other premises in which records required to be maintained under this divisions 2, 3, 4 or 5 of this article are located, shall allow the director, the approval authority, and the EPA, or their representatives, ready access at all reasonable times to all parts of the premises, including without limitation, access to sewer cleanouts, control points and other points of the building sewer or internal drainage system, for the purposes of inspection, sampling, records examination, copying, or in the performance of any of their duties. (e) In addition to or instead of the monitoring facilities or control points that may be required by this section, the director, the approval authority, and the EPA shall have the right to set upon the user's property such devices as are necessary to conduct sampling, inspection, compliance monitoring, and/or metering operations. (f) Where a user has security measures in force which would require proper identification and clearance before entry into their premises, the user shall make necessary arrangements with user's security guards so that the director, the approval authority, and the EPA will be permitted to enter immediately for the purposes of performing their specific responsibilities. (g) Measurements, tests, analyses. All measurements, tests, and analyses of the characteristics of wastewaters and wastes to which reference is made shall be determined in accordance with standard methods and shall be determined from samples taken at the control point provided for in this division, a location specified in the wastewater system use permit, or upon samples taken at other representative locations approved by the director. (h) Sampling expense. Laboratory processing of initial grab samples collected by the director to determine a user's compliance with federal and state regulations and with divisions 2, 3, 4 or 5 of this article shall be borne by the city. Upon request of a user, a composite sample will be collected and analyzed by the director or a third party contractor and/or laboratory at the user's expense, which shall be assessed as a separate line item on the user's utility bill. If the user requests a composite sample, the director may also require the user to install a device of a type and design approved by the director that will allow the sampling equipment to be secured and protected. If the first sample(s) collected indicate that a user is out of compliance the director shall at a minimum, in accordance with division 5 of this article, issue a notice of violation to the user. This provision in no way limits the director's authority to take additional action under division 5 of this article. If, within any twelve-month period from the date of the first notice of violation, additional samples indicate that the user continues to be non-compliant, and in addition to any other action taken by the director under division 5, the expense of obtaining and processing the repeat grab or composite (if requested) samples shall be at the user's own expense and shall be reflected as a separate line item on the user's utility bill. If at any time during this twelve-month period samples are collected and analyzed and indicate that the user is in compliance, this provision shall not be implemented again until another notice of violation is subsequently issued.
(Ord. No. 10-009, § II, 3-30-10; Ord. No. 14-012, 2-25-14)
Ask a question about Killeen law
Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
