For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-80 — Wastewater system use permit

Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 30-80

Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/87ff4652-81a3-437d-bdfa-8ce308d8cfbf

Sec. 30-80. - Wastewater system use permit.

(a) Required. All categorical (including new sources) and/or significant industrial users proposing to connect to or to discharge to the wastewater system shall obtain a wastewater system use permit before connecting or contributing to the wastewater system. Users that are not classified as categorical or significant industrial users, as those terms are defined in division 2 of this article, shall not be required to obtain a wastewater system use permit. All existing sources shall obtain a wastewater system user permit within ninety (90) days of the date of written notice from the director. (b) Application. (1) Users required to obtain a wastewater system use permit shall complete and file an application with the director on a form to be obtained from the director and signed by an authorized representative of the user. Proposed new categorical (including new sources) or significant industrial users shall apply for a wastewater system use permit at least ninety (90) days prior to connecting to or contributing to the wastewater system. (2) The director will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the director may issue a wastewater system use permit subject to terms and conditions provided in divisions 2, 3, 4 and 5 of this article. (3) If the user applying for a permit is located beyond the city limits, that user may be required to enter into a contract with the city prior to the issuance of the permit which requires the user to subject itself to and abide by divisions 2, 3, 4 and 5 of this article, including all permitting, compliance monitoring, reporting, and enforcement provisions contained herein. (c) Modifications. Within nine (9) months, or sooner if required by the regulating agency, of the promulgation of a National Categorical Pretreatment Standard, the wastewater system use permit of users subject to such standards shall be revised to require compliance with such standard within the time frame prescribed by such standard. Where a user, subject to a National Categorical Pretreatment Standard, has not previously submitted an application for a wastewater system use permit as required by this section, the user shall apply for a wastewater system use permit within ninety (90) days after the promulgation of the applicable National Categorical Pretreatment Standard. In addition, the user with an existing wastewater system use permit shall submit to the city within ninety (90) days after the promulgation of an applicable Federal Categorical Pretreatment Standard the information required by this division. (d) Conditions. (1) Wastewater system use permits shall be expressly subject to all provisions of divisions 2, 3, 4 and 5 of this article and all other applicable regulations, user charges, and fees established by the city. Permits shall contain the following: (A) The unit charge or schedule of user charges and fees for the waste, wastewater, or substances to be discharged into the wastewater system; (B) Limits on the average and maximum wastewater constituents and characteristics; (C) Limits on the average and maximum rate and time of discharge or requirements for flow regulations and equalization; (D) Requirements for installation and maintenance of inspection and sampling facilities; (E) Specifications for monitoring programs which may include: pollutants to be monitored, sampling locations, sampling frequency, number of samples, sampling types, standards for tests, and reporting schedule; (F) Compliance schedules; (G) Requirements for submission of technical reports or discharge reports; (H) Requirement for an authorized representative to meet the signatory and certification requirements for all applications and industrial user reports and certifications that pretreatment standards are being met on a consistent basis; (I) Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the director and affording the director access thereto; (J) Requirements for notification of the director of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater system; (K) Statement that the city may make any permit amendment deemed necessary by the city if there is new introduction into the wastewater system of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater system; (L) Requirements for notification of slug discharges, notification of any wastewater system use permit violations, and requirements for re-sampling and reporting; (M) Statement of duration (in no case more than five (5) years); (N) Statement of non-transferability without, at a minimum, prior notification to the city, provision of a copy of the current permit to the new owner or operator, and written approval of the director; (O) Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements; (P) Other conditions as deemed appropriate by the director to ensure compliance with divisions 2, 3, 4 or 5 of this article. (2) The director may modify a wastewater system use permit for good cause including, without limitation, the following reasons: (A) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (B) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of the individual wastewater discharge permit issuance; (C) A change in the wastewater system that requires either a temporary or permanent reduction or elimination of the authorized discharge; (D) Information indicating that the permitted discharge poses a threat to the wastewater system, personnel, the receiving waters, or beneficial sludge or treated wastewater use; (E) Violation of any terms or conditions of the wastewater system use permit; (F) Misrepresentations or failure to fully disclose all relevant facts in the wastewater system use permit application or in any required reporting; (G) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (H) To correct typographical or other errors in the wastewater system use permit; or (I) To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with subsection 30-80(e)(1)(N) of this article. (3) The director may revoke a wastewater system use permit for good cause, including, without limitation, the following reasons: (A) Failure to notify the director of significant changes to the wastewater prior to the changed discharge; (B) Failure to provide prior notification to the director of changed conditions pursuant to subsection 30-80(e)(1)(J); (C) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; (D) Falsifying self-monitoring reports and certification statements; (E) Tampering with monitoring equipment; (F) Refusing to allow the director immediate access to the facility premises and records; (G) Failure to meet effluent limitations; (H) Failure to pay fines; (I) Failure to pay wastewater service charges, sampling/testing charges and/or surcharges; (J) Failure to meet compliance schedules; (K) Failure to provide advance notice of the transfer of business ownership of a permitted facility; or (L) Violation of any pretreatment standard or requirement, or any terms of the wastewater system use permit or divisions 2, 3, 4 or 5 of this article. (4) Wastewater system use permits shall be voidable upon cessation of operations or transfer of business ownership. All prior wastewater system use permits issued to a user are void upon the issuance of a new wastewater system use permit to that user. (e) Accidental discharge control plan required. Each categorical user required to obtain a wastewater system use permit under division 4 of this article shall provide protection from accidental discharge of prohibited materials or other substances regulated by divisions 2, 3, 4 or 5 of this article. The director, upon reasonable cause and in writing, may require significant industrial users to adhere to this subsection (e) and subsection (f) of this section. Facilities to prevent accidental discharge of prohibited materials shall be provided and maintained at the user's own cost and expense. Detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the director for review, and shall be approved by the director before construction of any new facilities. All existing categorical users, and significant industrial users if required, shall complete such a plan in ninety (90) days from the date of issuance of a wastewater system use permit. An accidental discharge control plan shall address, at a minimum, the following: (1) Description of discharge practices, including non-routine batch or slug discharges; (2) Description of stored chemicals; (3) Procedures for immediately notifying the director of any accidental or slug discharge, as required by this divisions 2, 3, 4 or 5 of this article; and (4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. (f) No categorical user, or significant industrial user if required, who commences discharging into the wastewater system after the effective date of the original ordinance from which this division was derived shall be permitted to introduce pollutants into the system until accidental discharge procedures have been approved by the director. Review and approval of such plans and operating procedures shall not relieve the user from the responsibility to modify the user's facility as necessary to meet the requirements of divisions 2, 3, 4 or 5 of this article. (g) Notification. In the case of an accidental discharge, it is the responsibility of the permitted user to immediately telephone and notify the director of the incident. The notification shall include location of discharge, type of waste, wastewater and substances, concentration and volume, and corrective actions. A written report concerning the accidental discharge must be submitted within five (5) days to the director and shall include the same. (h) Upset provisions. (1) An industrial user shall submit the following to the city orally within twenty-four (24) hours of actual or constructive knowledge of an upset and in writing within five (5) days: (A) A description of the discharge and cause of noncompliance; (B) The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; (C) Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. (2) The industrial user shall control production and/or all discharges to the extent necessary to maintain compliance with categorical pretreatment standards or standards established by divisions 2, 3, 4 and 5 of this article upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost or fails.

(Ord. No. 10-009, § IV, 3-30-10)

Ask a question about Killeen law

Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.