§ 31-37 — Requirements for building permit
Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 31-37
Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/d7d1b570-2073-4eb0-bb9b-3ad0d4512fe6
Sec. 31-37. - Requirements for building permit.
(a) All applications for building permits shall be accompanied by accurate plot plans, submitted in duplicate, drawn to scale, showing: (1) The actual shape and dimensions of the lot to be built upon. (2) The exact sizes and locations on the lot of the buildings and accessory buildings then existing. (3) The lines within which the proposed building and structure shall be erected or altered. (4) The existing and intended use of each building or part of building. (5) The number of families or housekeeping units the building is designed to accommodate. (6) Such other information with regard to the lot and neighboring lots as may be necessary to determine and provide for the enforcement of this chapter. (b) One (1) copy of such plot plans will be returned to the owner when such plans have been approved. An inspection period of as much as two (2) weeks shall be allowed for inspection of plans before a permit shall be issued. (c) All dimensions shown on these plans relating to the location and size of the lot to be built upon shall be based on an actual survey by a qualified registered surveyor and the lot shall be staked out, with iron pins, on the ground before construction is started. (The lot shall remain staked until after the foundation inspection.)
(Code 1963, Ch. 9, art. 2, § 18-2 [Ord. No. 83-76, § 1, 12-27-83])
Ask a question about Killeen law
Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
