§ 31-609 — General site development standard and submittal requirements

Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 31-609

Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/99271539-c2a8-40fa-9834-1abecd407699

Sec. 31-609. - General site development standard and submittal requirements.

(a) All towers and communications facilities (excluding citizen band and amateur radio) shall conform to the following development standards: (1) All towers must be a monopole construction. An alternative tower design structure, as defined in section 31-601, may be approved by the building official. (2) To minimize potential safety hazards, towers shall be set back as required in section 31-605. (3) All lots on which towers and communications facilities are located must have all-weather access to a public street. (4) Towers shall be constructed in accordance with the city building codes, be certified by a professional engineer as to structural integrity of the tower and its appurtenances and shall be in compliance with the City of Killeen Code of Ordinances. (5) Towers shall be designed and placed on the site in a manner that takes maximum advantage of existing trees, mature vegetation, and structures so as to: a. Disguise as much of the tower as possible from the public view; b. Use site features as a background so that the tower blends into the background with increased sight distances; and c. To the degree technically feasible, locate on a portion of the site that is effectively isolated from view of residential areas by structures or terrain features unless the tower and facility are integrated or act as an architectural element of the structure such as a flag pole or parking lot light or are effectively screened through installed landscaping or other acceptable screening. (6) Communications facilities shall landscape screening. Further, the use of existing vegetation shall be preserved to the maximum extent practicable and may be used as a substitute for or in supplement towards meeting landscaping requirements. The installed landscaping requirements include: a. A row of shade trees a minimum of one inch (1") diameter shall be planted around the CF screen (required in section 31-606) with a maximum spacing of twenty-five (25) feet. b. A continuous hedge of one gallon sized (minimal) evergreen ground cover shall be planted along communications facility screen. c. All landscaping shall be drought-resistant or irrigated and properly maintained to ensure good health and viability. d. The city may waive landscaping requirements if the design of the tower is such that landscaping would cause the tower to be more obtrusive, or the tower is integrated or acts as an architectural element of a structure such as a flag pole, parking lot light, bell tower, or other similar structure and/or the city determines landscaping to be unnecessary. (7) All signs, flags, lights, and attachments (other than those required for communications operations, structural stability, or as required for flight visibility by the Federal Aviation Administration [FAA] and Federal Communications Commission [FCC]) shall be prohibited on any tower. (8) Communication towers shall be lighted with low intensity lights to provide added visibility for aviation navigation. (b) Service providers wishing to construct a tower shall ensure and submit documentation demonstrating: (1) That the tower will be erected and operated in compliance with current FCC and FAA rules and regulations and other applicable federal, state, and local standards and particularly those applicable to civil or military airports, airfields, or heliports. (2) That all back haul providers are identified and have all the necessary approvals to operate as such, including holding necessary franchises, permits, and certificates. (3) A notarized statement signed by the CF operator, owner, and the landowner that indicates: a. All agree to allow collocation of additional equipment by other service providers on the applicant's structure or within the same site location, provided that such space is available on a reasonable and non-discriminatory basis and will provide an estimated cost schedule for such collocation services. b. An understanding of section 31-607 relating to maintenance and inspections. c. An agreement to inform the city of any intent to abandon or cease using an antenna or tower within thirty (30) days of the date the use ceases. The agreement must state a willingness to remove the tower and accessory buildings and equipment upon six (6) consecutive calendar months of discontinued use. The six (6) month period may be administratively extended to provide a period of up to one year from the date of operation cessation to market the antenna or tower to other carriers. The responsibility for removal falls upon the landowner. In the event the tower and accessory buildings and equipment are not removed when so ordered, the city may remove the tower and accessory buildings and equipment and recover the costs associated with such removal from the landowner and place a lien upon the property until such costs are paid. (4) A report certified and sealed by a registered professional engineer stating that all structural components of the tower comply with all applicable codes and regulations. In the case of communication facilities, the report should further note the extent to which the tower is designed and/or built to accommodate collocation. In addition, a sealed report from a registered electrical engineer certifying that electromagnetic spectrum emissions are in compliance with applicable federal standards must be submitted. (5) An agreement to reimburse the city for actual costs incurred by the city to review and process the application. Should the city question either the certifications submitted with the application or the level or emissions during subsequent operations, the city may request an independent evaluation. If the submission or level of emission is found to be in error, the actual cost incurred by the city for this evaluation will be billed to the service provider or added to the application fee. (6) To enhance the city's ability to plan for collocation, a service provider shall provide a master antenna plan, including maps: a. showing the projected locations and characteristics of all proposed future sites in the city and in its extraterritorial jurisdiction (ETJ); b. indicating coverage areas of the proposed and existing sites within the city and its ETJ. Updates or revisions of the above documents shall be filed with the city within thirty (30) days of completion. Applicants may identify such information as "confidential and proprietary." Information so marked will not be released to any third party unless the city of Killeen is directed to do so by the state attorney general's office. (7) Site and landscaping plans indicating: a. the specific placement of the tower and all related structures on the site; b. the location of existing trees and other significant site features; c. the type and location of landscaping proposed for screening; d. the color(s) for the tower; and e. architectural drawings for the proposed site.

(Ord. No. 97-62, § II, 11-25-97; Ord. No. 05-69, § VIII, 9-13-05)

Ask a question about Killeen law

Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.