Sec. 32-36. - Definitions.
Best management practices shall mean a schedule of activities, prohibition of practices, maintenance of monitoring procedures, structural controls, and other management practices to provide effective erosion, sediment and site control, both on and off a particular site. Certified professional shall mean a person who has received training and is a certified professional in erosion and sediment control (i.e.: through CPESC, Inc. or equivalent recognized by the Texas Commission on Environmental Quality), is a State of Texas licensed professional engineer, or is licensed by the Texas Commission on Environmental Quality (TCEQ) to design, implement, inspect and maintain erosion and sediment control practices. Clearing shall mean any activity that removes the vegetative surface cover from land. City when used in this article shall mean the City of Killeen's director of public works or his designee. Common plan of development shall mean a construction activity that is completed in separate stages, separate phases, or in combination with other construction activities. A common plan of development (also known as a "common plan of development or sale") is identified by the documentation for the construction project that identifies the scope of the project, and may include plats, blueprints, marketing plans, contracts, building permits, a public notice or hearing, zoning requests, or other similar documentation and activities. A common plan of development does not necessarily include all construction projects within the jurisdiction of a public entity (e.g.: a city or university). Construction of roads or buildings in different parts of the jurisdiction would be considered separate "common plans," with only the interconnected parts of a project being considered part of a "common plan" (e.g.: a building and its associated parking lot and driveways, airport runway and associated taxiways, a building complex, etc.). Where discrete construction projects occur within a larger common plan of development or sale, but are located ¼ mile or more apart, and the area between the projects is not being disturbed, each individual project can be treated as a separate plan of development or sale, provided that any interconnecting road, pipeline or utility project that is part of the same "common plan" is not included in the area to be disturbed. Disturb (or any derivative of the word disturb) when relating to the alteration of improved or unimproved land shall mean any activity including, without limitation, the clearing, grading, filling, grubbing, scraping, dredging, mining, paving, excavating, drilling or movement of land, or the construction of any building or structure, the stockpiling of soil or materials, the baring of soil or rock, the diversion or piping of any natural or man-made watercourse, or any other activity that will or may result in soil erosion from water or wind, the movement of solid materials into waters or onto adjacent lands, or that changes the volume or peak flow discharge rate of stormwater runoff from the land surface. Drainage path or drainage way shall mean any channel, natural or man-made, that conveys surface runoff through, off and/or adjacent to the site. Erosion control shall mean a measure that prevents soil erosion. Erosion and sediment control plan (or plan) shall mean a plan or set of plans prepared by or under the direction of a certified professional indicating the specific measures and sequencing to be used to control sediment and erosion on a development site before, during and after construction on a site. In many cases, this plan will be satisfied by the submission of a Stormwater Pollution Prevention Plan (SWPPP) as required by sections 26-80 and/or 32-24 of this Code, provided that the same plan complies with this article. Final stabilization shall mean a construction site status where any of the following conditions are met: (a) All soil disturbing activities at the site have been completed and a uniform (i.e.: evenly distributed, without large bare areas) perennial vegetative cover with a density of at least seventy percent (70%) of the native background vegetative cover for the area has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures (such as the use of riprap, gabions, or geotextiles) have been employed. (b) For individual lots in a residential construction site by either: (1) the homebuilder completing final stabilization as specified in condition (a) above; or (2) the homebuilder establishing temporary stabilization for an individual lot prior to the time of transfer of the ownership of the home to the buyer and after informing the homeowner of the need for, and benefits of, final stabilization. If temporary stabilization is not feasible, then the homebuilder may fulfill this requirement by retaining perimeter controls or other best management practices, and informing the homeowner, in writing, of the need for removal of temporary controls and the establishment of final stabilization. If the homebuilder complies with these requirements, it shall be the duty of the homeowner to ensure final stabilization is achieved within one year after the transfer of ownership of the home to the buyer. (c) For construction activities on land used for agricultural purposes (e.g.: pipelines across crop or range land), final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface water and areas that are not being returned to their preconstruction agricultural use must meet the final stabilization conditions of condition (a) above. (d) In arid, semi-arid, and drought-stricken areas only, all soil disturbing activities at the site have been completed and both of the following criteria have been met: (1) Temporary erosion control measures (e.g.: degradable rolled erosion control product) are selected, designed, and installed along with an appropriate seed base to provide erosion control for at least three (3) years without active maintenance by the operator, and (2) The temporary erosion control measures are selected, designed, and installed to achieve seventy percent (70%) vegetative coverage within three (3) years. Perimeter control shall mean a best management practice that prevents sediment from leaving a site by filtering sediment-laden runoff or other materials or diverting the same to a sediment trap or basin. Person, for purposes of compliance and/or liability under this article, shall be deemed to include an individual, partnership, corporation or any other type of legal entity or association owning or having an ownership interest in the subject land, as well as any assignee, agent, contractor or sub-contractor of the same whose actions or omissions violate the terms of this article. Phasing shall mean disturbing a site in distinct phases, with the stabilization of each phase being in compliance with this article before the disturbance of the next phase. Sediment control shall mean best management practices that prevent eroded materials from leaving a site. Site shall mean a parcel of land or a contiguous combination thereof, where land disturbance work is performed as a single unified operation. Site disturbance permit shall mean a permit issued by the city to regulate land disturbing activities to meet the objectives of articles II, III and IV of this chapter. A site disturbance permit shall be deemed to be the same as a land disturbance permit issued under section 26-80 of this code, provided that the requirements of these various articles are met. Stabilization shall mean the use of best management practices that prevent exposed soil from eroding. Start of construction shall mean, without limitation, the first land-disturbing activity associated with a development including land preparation such as clearing, grading, and filling; installation of streets and walkways; excavation for structural footings, piers, or foundations, and installation of accessory buildings such as garages. Structural control (or practice) shall mean a pollution prevention practice that requires the construction of a device, or the use of a device, to capture or prevent pollution in stormwater runoff. Structural controls and practices may include but are not limited to: silt fences, earthen dikes, drainage swales, sediment traps, check dams, subsurface drains, storm drain inlet protection, rock outlet protection, reinforced soil retaining systems, gabions, and temporary or permanent sediment basins. Temporary stabilization shall mean a condition where exposed soils or disturbed areas are provided a protective cover or other structural control to prevent the migration of pollutants. Temporary stabilization may include temporary seeding, geotextiles, mulches, and other techniques to reduce or eliminate erosion until either final stabilization can be achieved or until further construction activities take place. Watercourse shall mean and include a drainage path or drainage way, channel, or stream to include, without limitation, waters in the state (as those waters are defined under chapter 32, article II of this code), in which water flows within a defined bed and banks, even though the same may be slight, imperceptible or even absent in places, and originates from a definite source or sources. The water need not always be present and may be intermittent if the latter occurs with some degree of regularity, depending on the characteristics of the sources (i.e.: water is present or flowing during and/or after a rainfall event). **Terms not defined in the article shall be as defined in article II of this chapter, unless the context clearly indicates otherwise.
(Ord. No. 11-061, § I, 7-12-11; Ord. No. 12-046, § IV, 8-7-12)
Ask a question about Killeen law
Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.