§ 19-657 — Design standards and procedures
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Code of Ordinances § 19-657
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/31b7e8ac-ab68-45d1-b06b-29bb69fabdf8
Sec. 19-657. - Design standards and procedures.
The traffic safety department shall prepare and maintain current design standards and installation procedures for speed humps in accordance with this policy. The city will be responsible for the maintenance of speed humps and all related features. The city reserves the right to change or modify any of these standards or procedures as may deem necessary. [Figure 1] What is a Speed Hump? • Asphalt speed humps are parabolic vertical traffic calming devices intended to slow traffic speed on low volume, low speed roads. Asphalt speed humps are three (3)—four (4) inches high and twelve (12) to fourteen (14) feet wide, with a ramp length of three (3) to six (6) feet, depending on target speed. Asphalt speed humps reduce speeds to fifteen (15) to twenty (20) mph and are often referred to as "bumps" on signage and by the general public. [image omitted; see the official code] Circular Speed Hump CITY OF LAREDO PROCEDURES FOR ASPHALT SPEED HUMP INSTALLATION 1. The initial request for the installation of asphalt speed humps must originate from the residents living on the street or from a city council member through city council action. A request in writing from a resident or representative must be forwarded to the following address: Speed Hump Program Traffic Safety Department Engineering Division 2800 E. Saunders Laredo, Texas 78041 2. A preliminary determination of eligibility based on available traffic data will be made in a timely manner. A. If the street is determined not to be eligible, the applicant(s) will be given written notification of that determination and its reasons. The street cannot be taken into consideration for asphalt speed humps until two (2) years after the first study was done. B. The decision may be appealed in writing to the director of traffic safety within fifteen (15) days of the notification date. The director will review the determination and respond to the applicant(s) within thirty (30) days of the appeal request. C. If the street is determined to be eligible for consideration, a meeting will be arranged between the applicant(s) and staff to define the petition area and the approximate asphalt speed hump location. The applicant(s) or council member making the request, will be instructed to submit a petition indicating that a minimum of two-thirds (⅔) of the low-density dwelling households on the street support the installation of asphalt speed humps as provided in the asphalt speed hump policy. Only petition forms supplied by the traffic safety department or exact duplicates may be used for this purpose. 3. After verification of the petitions, the traffic safety department will conduct the necessary transportation engineering studies and solicit comments and recommendations of other agencies. A determination of the street's eligibility for asphalt speed hump installation will be made in a timely manner, based on the speed hump installation policy. A. If the street is determined not to be eligible for asphalt speed hump installation, the applicant(s) or council member making the request will be notified in writing giving the reason. B. The decision may be appealed in the same manner as in Section 2. C. If the street is determined to be eligible, the street will be placed on a list of streets eligible for asphalt speed hump installation. 4. The traffic safety department will make a determination of the total installation cost and the cost sharing responsibility of the residents, if applicable, according to the asphalt speed hump policy. 5. Depending on the method used to pay for the cost of the asphalt speed hump installation, either section 5A or section 5B will apply. Section 5A will apply if there is no city participation in the cost (i.e., the cost will be fully paid with voluntary private funding). Section 5B will apply if the residents request any city participation in paying for the cost of the asphalt speed hump installation, if that option is available under section 19-653 of the speed hump policy. A. Once a street is placed on the list of streets approved for asphalt speed hump installation, the city will submit a statement to the representative of the residents for the cost of the asphalt speed hump installation. Upon receipt of payment of the cost, the asphalt speed humps will be installed as scheduling permits. If full payment has not been received within one (1) year from the statement date, the street will be removed from the list of streets approved for asphalt speed hump installation and all monies received, if any, returned to the payer. - OR - B. (1) The traffic safety department will prepare a report on an annual basis containing a list of streets approved for asphalt speed hump installation that require city funding, either in whole or part, in a request for funding to the city council. The report will rank the requests in an order of priority determined by the following calculation: VARIABLE ITEM | CALCULATED AS | VALUE A | Fraction of vehicles exceeding speed criteria × daily traffic volume | = B | Number of schools, parks, churches, or institutions on street (maximum of 2) × 200 | = C | Percent of petitioning households on street requesting speed humps × 5 | = D | Number of reported accidents in previous 12-month period × 100 | = RATING SUM | (A + B + C + D) | = (2) The street yielding the highest numerical value from the above summation will be considered to have the highest priority. The street with the earliest application date will have the highest priority among streets with the same summation value. The report will contain the above ranked list of streets approved for asphalt speed hump installation, together with the factors that contributed to the development of the rating, e.g., speed, vehicles per day, rating sum, etc. The director of traffic safety will also keep a list of all pending asphalt speed hump requests. A street that does not receive asphalt speed hump installation funding approval will automatically be considered in the following years, for a maximum of three (3) additional years. After that time period, a new request and petition are required. (3) When a budget amount for asphalt speed hump installations has been approved by the city council, the traffic safety department will determine which installations, based on the calculated ratings, will be funded from the budgeted amount. Representatives of the applicants for all approved asphalt speed hump installations will be notified of which requests have been funded for the coming fiscal year. (4) Installations not included in the group to be funded can be approved if their full installation cost (including the city's share) is voluntarily paid, as provided in section 5A. (5) The city will submit a statement to the representative of the residents for any cost based on the provisions of the asphalt speed hump policy. It will list the total cost, portion to be paid by residents and the portion to be paid by the city. Upon funding approval and receipt of payment in full of the residents' share, the asphalt speed humps will be installed as scheduling permits. If full payment of the residents' share, if any is required, has not been received within one (1) year from the statement date, the street will be removed from the list of streets approved for asphalt speed humps and all monies received, if any, returned to the payer. SPECIAL PROVISION FOR INSTALLATION Where it is determined that a specific traffic safety hazard exists, city council may request the installation of an asphalt speed hump(s) through this special provision through city council action only after a study has been conducted and determined that a speed hump was not warranted by the minimum guidelines of this policy. This special provision shall require the use of city council's priority funding to cover the cost involved in the installation of the asphalt speed hump. City council will exercise the option to use this special provision provided that following minimum guidelines are met: 1. Roadway must be classified as "local" and be residential in nature. 2. Minimum eighty-fifth-percentile speed of thirty (30) mph. 3. Minimum street length of seven hundred (700) feet. 4. Recommendation from the Fire Chief and the Police Chief of the City of Laredo. 5. Approval by two-thirds of residents within the proposed asphalt speed hump(s) project location. 6. Geometric characteristics of the affected section of street does not create a safety hazard for the motoring public if a asphalt speed hump is installed or created a drainage issue as recommended by engineer.
(Ord. No. 2010-O-139, § H., 9-20-10; Ord. No. 2023-O-027, § H, 2-6-23) (Ord. No. 010-O-139, § H, 9-20-10; Ord. No. 2023-O-027, § 1, 2-6-23)
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
