§ 2.3.8 — Plat recordation
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Code of Ordinances § 2.3.8
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/ce0a17ed-604e-4ca3-8705-e08ddced50d6
Section 2.3.8 - Plat recordation
The subdivider must provide the following information to enable the Director of Planning to verify compliance with conditions of plat approval, if any, prior to initiation of recordation: (1) An original plat drawing prepared on any permanent translucent material, including but not limited to tracing linen, plastic film, or positive film with lines, lettering and signatures in black ink or image. The names of all persons signing any plat must also be lettered under the signature. Two (2) paper prints from the original plat drawing on white paper with blue or black lines, and one (1) sepia transparency must also be provided; (2) An original certificate of title for the property included in the plat prepared not later than thirty (30) days prior to the initiation of recordation; (3) Satisfactory written evidence in the form of plat release letters showing that all conditions of approval have been satisfied; (4) A notarized instrument from the owner of any privately owned easement or fee strip within the plat boundaries where such easement or fee strip is to be crossed by public or private streets or public utility or drainage easements, acknowledging and approving such crossings. The sufficiency of any instrument of record provided to satisfy this requirement shall be approved by the City Attorney; (5) Original certificates showing that all current and delinquent city, county, school and special district taxes have been paid, and that none are due; and (6) In areas of special flood hazard, where a map revision is proposed, plats must illustrate existing and proposed floodplain lines. Plats should include a note stating the existing floodplain lines will be utilized for the purpose of issuing building permits until the Letter of Map Revision (LOMR) is granted by the Federal Emergency Management Agency (FEMA).
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
