§ 24-78.4 — DESIGN AND CONSTRUCTION STANDARDS FOR EXISTING AND NEW OFF-STREET PARKING AREAS
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-78.4
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/68cac242-3114-4d4b-b6ae-f175cfd3b132
Section 24-78.4 - DESIGN AND CONSTRUCTION STANDARDS FOR EXISTING AND NEW OFF-STREET PARKING AREAS
(a) Any existing or new off-street parking area not used in conjunction with a single family residence shall meet the construction and design standards for that type of off-street parking area as contained in the document entitled "Layout and Design Standards for Parking Lots," attached hereto as Exhibit A, and incorporated herein, within ninety (90) days of the effective date of this ordinance. (b) A building permit is required for the construction of any new, or on any existing, off-street parking area after the effective date of this ordinance unless one has already been issued therefor in conjunction with construction of a building on the same lot as the off-street parking area. (c) After the effective date of this ordinance, there shall be a certified survey of, and construction plans for, any proposed off-street parking area, or any existing off-street parking area on which construction is proposed. Such survey and construction plans shall be submitted to the Building Official as part of the building permit application. The certified survey and construction plans shall be reviewed and approved by the City Engineer and the city Building Official before the issuance of a building permit for the construction of or on the off-street parking area. (d) Foreword. The purpose of this manual is to provide for standard specifications in the design and layout of off-street parking facilities. The tendency when designing parking areas is to crowd as many car spaces as possible into the allotted space by reducing standards, such as narrower parking stalls and narrower aisles. The best design, however, should give full consideration to every design factor that improves access to and from the street; internal movement, maneuvering of cars, convenience or patrons and security of vehicles. The average automobile is 18'-0" long and 6'-9" wide. Adding to these limits allowances for opening doors, the relative skill of drivers, the turning radius of the average automobile and a margin for safety, the following standards have been established. Parking areas built to these specifications will allow eighty (80) percent of all cars to park with relative ease in one maneuver. Some reduction in these standards may be necessary at times - but losses in efficiency will generally result, In the larger lots greatest economy of space can be accomplished by placing the stalls at right angles to the aisles (see figure for 90°). Acute-angle parking allows fewer stalls for a given length of curb or aisle than right-angle parking, but entrance is easier for drivers, and a definite advantage is that the aisle may be narrower and permits use of a lot too narrow for right-angle parking (see subsection (h), figures for 60°, 45°, and 30°). Acute-angle parking requires that the first stall be placed a minimum distance from the property line or sidewalk. This is a safety measure to protect occupants of the sidewalk from vehicles backing out of the stall. Barrier curbs are essential when parking heads into an adjoining property line or sidewalk. Their placement depends upon the angle for which the parking is planned (see subsection (h), overhand of average automobile). Circulation of cars within facilities requires consideration of entrance and exit locations, width or aisles and the angle of parking. One-way, counterclockwise movement is desirable, where feasible and will reduce congestion. Entrances and exits should be held to a minimum to reduce conflict with street and sidewalk traffic, but is highly desirable that exits and entrances be separated. (e) The average automobile is: [image omitted; see the official code] (f) The turning circle for the average automobile is: [image omitted; see the official code] (g) Space requirements for parking at various angles. [image omitted; see the official code] (h) Overhang of average automobile parking against 6" raised curb at 30°, 45°, 60°, and 90°. [image omitted; see the official code] [image omitted; see the official code] [image omitted; see the official code] [image omitted; see the official code] [image omitted; see the official code] (i) Methods of laying out of parking areas on 50' and 60' lots. [image omitted; see the official code] (j) Methods for marking parking stalls. [image omitted; see the official code] (k) Driveways. [image omitted; see the official code] (l) Driveway approaches. (1) Commercial Driveway Approaches. Walks, drives, curbs, gutters, pavements and appurtenances on public property and other facilities to provide access to premises used for other than residential purposes shall be constructed provided or repaired in accordance with the following standards and requirements: a. Width of Driveway Approach. The width of any commercial driveway approach shall be not less than twelve (12) feet nor more than forty (40) feet measured along the property line, except driveway approaches for motor vehicle docks within a building shall not exceed sixty (60) feet in width at the property line. Where more dock space is required, the driveway approaches shall be separated by a traffic island meeting the standards set out in subsection d. below. (b) Maximum Space to be Occupied By Driveway Approaches. Driveway approaches shall not occupy more than seventy (70) percent of the frontage abutting the roadway of the tract of ground devoted to one use which abuts the roadway. c. Number of Driveway Approaches Allowed. Not more than two (2) driveway approaches shall be permitted on any parcel of property with a frontage of one hundred fifty (150) feet or less. Additional openings, for parcels of property having a frontage of one hundred fifty (150) feet or less, may be permitted, after proof to the City Engineer of necessity and convenience to the public. d. Separation Between Driveway Approaches. When more than one driveway approach is required to serve a parcel of property, a traffic island shall separate the driveway approaches. The width of the traffic island at the property line shall be a minimum of twenty (20) feet. Where the grade at the property line is the same as the sidewalk a six-inch raised curb shall be constructed at the back of the traffic island along the property line and on private property. The raised curb shall be constructed so as to end twenty-four (24) inches from the intersection of the driveway approach with the property line. e. Premises Used as Motor Vehicle Service Stations or Parking Lots. Premises used as a motor vehicle service stations or parking lots shall have a six-inch raised curb or other approved traffic barrier along the entire street frontage except at the driveway approaches and access walks. The curb shall be placed so that automobile bumpers shall not extend over the sidewalk or public property. (m) Typical Truck Parking Stalls. An ordinance amending parking lot layout section, page 13, Ordinance No. 90-O-107 of the City of Laredo to change: [image omitted; see the official code] (n) Concrete Pavement. (1) Typical Concrete Designs for Parking Areas. SOIL TYPE Type of Vehicle | Traffic | Gravel | Clay Sand or Clay Gravel | Clay | Joint Spacing Passenger Cars Pickup or Panel Trucks (Parking Areas) | Light | 4" | 5" | 5(D.S.) | 12.5' (15' with D.S.) Medium | 5 | 5 | 5(D.S) | 12.5' (15' with D.S.) Heavy | 6 | 6 | 6(D.S.) | 15' (20' with D.S.) Trucks (Drives & Service Areas) | Light | 5 | 5 | 5(D.S) | 12.5' (15' with D.S.) Medium | 5* | 6 | 6(D.S.) | 15' (20' with D.S.) Heavy | 7± | 7 | 8(D.S) | 15' (20' with D.S.) D.S. = Distributed Steel #3 deformed bars on 24" centers both ways (or equivalent) for light and medium. Distributed Steel #4 deformed bars on 24" centers both ways (or equivalent) for heavy. Light = Churches, schools, hospitals, office buildings, auditoriums and stadiums. Medium = Shopping centers, commercial areas (If defined truck service drives are provided, shopping centers and commercial parking areas may be considered as light traffic, dependent on individual conditions.) Heavy = Industrial. * Use 12.5' (15' with D.S.) with 5" pavement. (2) Design Mix of Concrete for Parking Lots. Cement content: 6 sacks per cubic yard. Maximum size aggregate: 1½ inch. Maximum slump: 4 inches. Maximum water content: 7 gal./sack. Entrained Air: 5% plus or minus 1%. (3) Estimating the Materials. The table gives the number of cubic yards of concrete in slabs of different thicknesses and areas. Multiply the slab length by its width to get the area in square feet. Then read quantity of concrete from the table for desired thickness. Example: The slab is 20×30 ft. and 4 in. thick. Find quantity of concrete needed. Area = 20 × 30 ft. = 600 sq. ft. Since the table does not go as high as 600 sq. ft., use the concrete quantity for 300 sq. ft. and multiply it by 2. Quantity for 300 sq. ft. = 3.7 cu. yard. 2 × 3.7 = 7.4 cu. yard CUBIC YARDS OF CONCRETE IN SLABS Area in square feet (length × width) | Thickness in Inches 4 | 5 | 6 | 7 50 | 0.62 | 0.77 | 0.93 | 1.1 100 | 1.2 | 1.5 | 1.9 | 2.2 200 | 2.5 | 3.1 | 3.7 | 4.3 300 | 37 | 4.6 | 5.6 | 6.5 400 | 5.0 | 6.2 | 7.4 | 8.6 500 | 6.2 | 7.7 | 9.3 | 10.8 (o) Design Criteria. The plans and specifications in this folder were prepared by the Portland Cement Association for use in Texas. The purpose of these plans and specifications is to provide a very simple method of constructing a concrete parking area. If curbs are not required, the words "integral curb" should be lined out or deleted. These specifications are designed for use with ready-mixed concrete. Mix designs for the specified concrete are available from the ready mix producer. The producer will normally certify to the purchaser that he will furnish a concrete containing at least six (6) sacks of cement and no more than seven (7) gallons of water per sack, and with a compressive strength of 3,600 psi in twenty-eight (28) days. This certification eliminates the need for testing on small jobs. Care should be taken to insure that additional water is not added at the job site, causing the water-cement ratio to exceed seven (7) gallons per sack. If test specimens are taken for small jobs, cylinders are generally used. Mix design data is usually available on compressive strength basis. The strength recommended in the accompanying specification has proven adequate in all parts of Texas. The detail sheets give suggested joint layouts, although the contractor should be allowed to make minor changes in this jointing pattern if it will result in more economical construction and the changes do not exceed the maximum recommended. It is better to use too many joints than not enough. Care should be taken to insure that the one-inch minimum depth is obtained for each joint. Most soils can be used as a sub-base for concrete with minimum preparation. It is important that the subgrade be thoroughly and uniformly wetted to a depth of about six (6) inches prior to placing concrete on it. It is also important that the subgrade be of uniform density to provide uniform support for the slab. Concrete pavement can be engineered to perform satisfactorily on any soil condition. Best performance is obtained, however, where subgrade support is reasonably uniform. Many contractors elect to place about a two-inch layer of sand or its equivalent on the subgrade prior to placing. This is sometimes called fine grading. It allows a base over which to work and makes it easier to get a uniform thickness of concrete thereby reducing overrun. Prior to setting forms, the subgrade should be checked for proper grade and alignment. Prior to placement of the concrete, forms should be checked for proper grade and alignment. The parking area should have a fall of at least ⅛ inch per foot in the direction of the desired drainage. A complete and uniform coverage of curing compound can be obtained by applying the spray compound in one direction and then making a second application in a perpendicular direction. The attached chart gives the recommended thickness for concrete parking areas. Use of these recommended thicknesses for concrete will result in pavements lasting as long as the building it serves (30, 40, 50 years or more). (1) Thickness Design Chart. SUBGRADE | PAVEMENT THICKNESS "t" IN INCHES General Soil Type** | Strength | Parking Areas (1) | Drives & Service Areas (2) CBR | "k" | Light | Medium | Heavy | Light | Medium | Heavy Poor Clays & Silty Clays | 2 to 5 | 75 to 100 | 5 *(D.S.) | 5 (D.S.) | 6 (D.S.) | 5 (D.S.) | 6 (D.S.) | 8 (D.S.) Fair to Good Sandy Clays Sandy Silts Sand | 5 to 10 | 150 to 200 | 5 | 5 | 6 | 5 | 6 | 7 (D.S.) Excellent Gravel Sand Gravel Rock | 10 & above | 200 & above | 4 | 5 | 6 | 5 | 5 | 7 For Quality of Concrete see paragraph III of Design Criteria (1) Design for No. of Heavy Vehicles per Day (Light Panel Trucks and Autos Unlimited) | (2) | (2) If Truck Traffic Equals Drive Traffic, Use Drive & Service Area Thicknesses | Unlimited Axle Load Repetitions (lbs) 8,000 | 12,000 | 16,000 *D.S. - Distributed Steel #3 deformed bars on 24" centers both ways (or equivalent) for light and medium Distributed Steel #4 deformed bars on 24" centers both ways (or equivalent) for heavy Light - Churches, schools, hospitals, office buildings, auditoriums, stadiums and apartment complexes. Medium - Shopping centers, commercial areas. (If defined truck service drives are provided, shopping centers and commercial parking areas may be considered as light traffic, dependent on individual conditions. See load repetition chart.) Heavy - Industrial. **See subsection (2), "PCA Soil Primer" for interrelationships of Soils Classifications. (2) Approximate interrelationships of soil classifications and bearing values. [image omitted; see the official code] (3) Typical Light Duty in and Out Parking With Heavy Duty drive. [image omitted; see the official code] (4) Typical Parking Lot With Heavy Duty Service Drive. [image omitted; see the official code] (5) Typical Heavy Duty Layout Using Distributed Steel. [image omitted; see the official code] (6) Confined Peripheral Reinforced Pavement. [image omitted; see the official code] (7) Light Duty Parking and Drive Details. [image omitted; see the official code] (8) Medium and Heavy Pavement Details. [image omitted; see the official code] (9) Special Details. [image omitted; see the official code] (p) Bituminous Asphalt Pavement. (1) Bituminous Prime Coat. a. General. Description: This item shall consist of an application of asphaltic material on the completed base course in accordance with these specifications and as directed by the Engineer. b. Material. Cut Back Asphalt: The bituminous material shall conform to the following: GRADE MC-30 | MIN | MAX Kinematic Vis. at 140 F., CST ..... | 30 | 60 Flash Point T.O.C. F ..... | 100 When distilled ASTM Method D-402, the distillate-off volume shall be as follows: MIN | MAX Off at 437 F. % ..... | — | 25 Off at 500 F. % ..... | 40 | 70 Off at 600 F. ..... | 75 | 93 Residue from 680 F. Distillation Volume % ..... | 50 | — The residue when poured from the flash without cooling immediately upon reaching the maximum temperature specified, shall have the following characteristics: MIN | MAX Penetration at 77 F., 100 gms., 5 sec. ..... | 120 | 250 Ductility at 77 F., 5 cm/min. cms ..... | 100 | — Solubility in CCI 4% ..... | 99.5 | — The material shall be free from water. MC-30 shall be applied uniformly at the rate of 0.25 gallons per square yard. At Contractor's option, appropriate emulsified asphalt, water mixture may be used in lieu of MC-30. Number of applications, mixture rate and depth of penetration shall be approved by Engineer prior to use of emulsified asphalt. Furnishing and placement of prime coat shall be subsidiary to pavement and flexible base construction. c. Construction Methods. Application of Asphalt: Asphalt shall not be applied when the air temperature is below 50 F and is falling, and it may be applied when the air temperature is 40 F., and is rising, the temperature being taken in the shade and away from artificial heat. No asphalt shall be placed when general weather conditions in the opinion of the Engineer are not suitable. All storage tanks, piping, retorts, booster tanks and distributors used in storing or handling asphalt shall be kept clean and in good operating condition at all times, and they shall be operated in such a manner that there will be no contamination of the asphalt with foreign material. Asphalt shall not be heated above 400 F. at any time and when applied, it shall be at a temperature of not less than 70 F., and not more than 150 F. The Engineer will select the temperature within 15 F. of the temperature selected. All asphalt heated above 400 F. will be rejected. Before the application of asphalt, the surface of the base shall be cleaned of dirt, dust, or other deleterious matter by sweeping or other approved methods and if required by the Engineer, lightly sprinkled with water. Asphalt shall be applied on the clean surface by an approved type of self-propelled pressure distributor so operated as to distribute the asphalt in the quantity specified evenly and smoothly under a pressure necessary for proper distribution. The Contractor shall provide all necessary facilities for determining the temperature of the asphalt in all the heating equipment and in the distributor for determining the rate at which it is applied and for insuring uniformity at the junction of two distributor loads. Asphalt shall be applied for the full width of the surface treatment in one application unless the width exceeds twenty-two (22) feet. No traffic or hauling will be permitted over the freshly applied asphalt. (2) Bituminous Tack Coat. a. Description. This item shall consist of an application of asphaltic material on the completed and prime base course or existing pavement in accordance with these specifications. b. Material. Cut Back Asphalt: The bituminous material shall conform to the following: GRADE RC-2 | MIN | MAX Viscosity (Furol) at 122 F., Sec. ..... | 200 | — Flash Point T.O.C. F. ..... | 80 | — The distillate, expressed as percent by volume of total distillate to 600 F., shall be as follows: MIN | MAX Off at 500 F., % ..... | 50 | 75 Off at 600 F., % ..... | 70 | 90 Residue from 680 F., Distillation, Volume % ..... | 70 | — The residue, when poured from the flash without cooling, immediately upon reaching the maximum temperature specified, shall have the following characteristics: MIN | MAX Penetration at 77 F., 100 g., 5 Sec. ..... | 110 | 150 Ductility at 77 F., 5 cm./min., cms. ..... | 100 | — Solubility in CCI, % ..... | 99.0 | — Spot Test ..... | Neg The material shall be free from water. RC-2 Cut back asphalt used for tack coat may upon written instructions from the Engineer, be further cut-back by the addition of not to exceed fifteen (15) percent by volume of an approved grade of gasoline. c. Construction Methods. Application of Asphalt: Asphalt shall not be applied when the air temperature is below 50 F and is falling, and it may be applied when the air temperature is above 40 F and is rising, the temperature being taken in the shade and away from artificial heat. All storage tanks, piping, retorts, booster tanks and distributors used in storing or handling asphalt shall be kept clean and in good operating condition at all times, and they shall be operated in such a manner that there will be no contamination of the asphalt with foreign material. Asphalt shall not be heated above 500 F., at any time and when applied, it shall be at a temperature of not less than 70 F., and not more than 150 F. All asphalt heated above 400 F. will be rejected. Before the application of asphalt the surface of the base shall be cleaned of dirt, dust, or other deleterious matter by sweeping or other approved methods and lightly sprinkled with water. Asphalt shall be applied on the clean surface by an approved type of self-propelled pressure distributor so operated as to distribute the asphalt in the quantity specified evenly and smoothly under a pressure necessary for proper distribution. Asphalt shall be applied for the full width of the surface treatment in one application unless the width exceeds twenty-two (22) feet. No traffic or hauling will be permitted over the freshly applied asphalt. (3) Flexible Base Course. Flexible base shall consist of a foundation course for surfacing, pavement, or other base courses; shall be composed of caliche and stone materials, and shall be constructed as herein specified in conformity with the typical sections shown on the plans. a. Materials. The material shall consist of argillaceous limestone, calcareous or calcareous clay particles with or without stone, conglomerate, gravel, sand or other granular materials. The material shall be type F (pit run caliche), conforming to Item No. 248 of the State Department of Highways and Public Transportation Specification, 1982. The plasticity index of caliche shall have a maximum of twelve (12) and a minimum of five (5). Stones greater than three (3) inches in any direction shall be removed during construction. b. Construction Methods. The flexible base material shall be placed on the approved subgrade in courses not to exceed the depth shown on plans. It shall be the responsibility of the Contractor that the required amount of material be delivered and uniformly spread and shaped. All material shall be moved from the place where it is dumped by cutting it windrows. After the material has been cut into windrows, it shall be sprinkled, spread and shaped, and rolled in proper sequence to prevent segregation and as necessary for required compaction. The surface upon completion shall be smooth and in conformity with typical sections and to the established lines and grades. Any deviation in excess of one-fourth (¼) inch in cross section and in length of 16 feet measured longitudinally shall be corrected. All irregularities, depressions, or weak spots which develop shall be corrected. Flexible base shall be compacted to an apparent dry density of not less than 90 percent (98%) of the maximum dry density as determined in accordance with Texas Department of Highways & Public Transportation 1982, Test Method Tex 113-E. Tests for density will be made within twenty-four (24) hours after compaction operations are completed. If the material fails to meet the density specified, it shall be reworked as necessary to meet the density required. Just prior to the placing of any succeeding course of flexible base or surfacing on a previously competed course, the density and moisture of the top four (4) inches of flexible base shall be checked and if test show the density to be more than two (2) percent (2%) below the specified minimum or the moisture content to be more than three percent (3%) above or below the optimum, the course shall be reworked as necessary to obtain the specified compaction and moisture content. Should the base course due to any reason or cause lose the required density or finish before the surface is completed, it shall be recompacted, refinished and retested at the sole expense of the contractor. (4) Hot Mix Asphaltic Concrete Pavement. Type D a. Description: This item shall consist of a base course, a leveling up course, a surface course or any combination of these courses as shown on the plans, each to be composed of a compacted mixture of mineral aggregate and asphaltic material. The mixture when designed and tested in accordance with these specifications and methods outlined in THD Bulletin C-14, shall have the 'following: DENSITY PERCENT | STABILITY PERCENT MIN. | MAX. | OPTIMUM | Not less than 35 nor more than 60 unless otherwise, shown on plans. 95 | 99 | 97 The pavement shall be constructed on the previously completed and approved subgrade, base, existing pavement, bituminous surface or in the case of a bridge, on the prepared floor slab, as herein specified and in accordance with the details shown on the plans. b. Materials: Materials used in Hot-Mix Asphaltic Concrete Pavement shall meet the requirements as set forth in Item 340 "Hot Mix Asphaltic Concrete Pavement" of the State Department of Highways and Public Transportation Specifications (1982). Prior to laying any asphalt, contractor shall submit a Hot-Mix Asphaltic Concrete mix design for approval. He shall also submit written assurance that material stockpiles are sufficient to produce a mix consistent with the design for the duration of the project. If material source change occurs prior to completion. Contractor shall provide a revised mix design at no additional expense to the Owner. The Contractor shall provide for quality control at the plant to ensure that paving material delivered to the site conforms to requirements of these specifications and the mix design. c. Construction Methods: Construction methods used in Hot-Mix Asphaltic Concrete Pavement shall meet the requirements as set forth in Item 340 "Hot-Mix Asphaltic Concrete Pavement" of the State Department of Highways and Public Transportation Specifications, 1982, with the following addition: Application of Hot-Mix Asphaltic Concrete Pavement shall not begin unless the temperature is at least fifty (50) degrees Fahrenheit in the shade and rising. d. Equipment: Mixing plants that will not continuously produce a mixture meeting all of requirements of Item 340.04, in the State Department of Highways and Public Transportation Specifications, 1982, shall not be allowed. DETAILS GENERAL NOTES: HOT-MIX ASPHALT-ITEM 340 STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION (S.D.H.P.T.) REINFORCING STEEL = A.S.T.M. - A-615 GRADE 60 OR 40 BARS REQUIRING BENDING SHALL BE GRADE 40. CONCRETE - 3000 PSI CONCRETE. COMPACTION REQUIREMENT - SUBGRADE TO 95% MAXIMUM DENSITY IN ACCORDANCE WITH TEX 113-E (S.D.H.P.T.) FLEXIBLE BASE TO 98% MAXIMUM DENSITY IN ACCORDANCE WITH TEX 113-E (S.D.H.P.T.). SURFACE SLOPE - MINIMUM 1% SLOPE ON PAVEMENT. LIGHT TRAFFIC [image omitted; see the official code] MEDIUM TRAFFIC [image omitted; see the official code] HEAVY TRAFFIC [image omitted; see the official code] (5) Pavement Markings. a. Part I - General. 1.1 Description. A. Work included: Provide pavement marking in the types and arrangements shown on the Drawings, as specified herein, and as needed for a complete and proper installation. 1.2 Quality Assurance. A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. 1.3 Submittals. A. Comply with pertinent provisions of Specifications and Drawings. B. Product Data: Within 60 calendar days after the Contractor has received the Owner's Notice to Proceed, submit: 1. Materials list of items proposed to be provided under this Section; 2. Manufacturer's specifications and other data needed to prove compliance with the specified requirements; 3. Photographs, scale drawings, or other data acceptable to the Engineer, showing types of graphics proposed to be used. 1.4 Product Handling. A. Comply with pertinent provisions of Specifications and Drawings. b. Part 2 - Products. 2.1 Pavement Marking Paint. A. Provide paint specifically formulated for use as pavement marking in vehicles/trucks traffic-areas; and in the colors selected by the Engineer from standard colors of the approved manufacturer. B. Acceptable Products (or equal): 1. "Traffic Paint" manufactured by J.E. Bauer Company. 2. "Traffic Paint" manufactured by Tnemec. 3. "Romark Traffic" manufactured by Glidden-Durkee. 4. "Traffic and Zone Marking Paint" manufactured by PPG. 2.2 Other Materials. A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Engineer. c. Part 3 - Execution. 3.1 Surface Conditions. A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the work. Do not proceed until unsatisfactory conditions are corrected. 3.2 Application. A. Secure the Engineer's approval of graphics design and layout prior to start of application. B. Using proper masking, stencils, and application equipment recommended for the purpose by the manufacturer of the approved paint, apply the approved paint in strict accordance with its manufacturer's recommendations. 3.3 Protection. A. Provide traffic cones, barricades, and other devices needed to protect the paint until it is sufficiently dry to withstand traffic. 3.4 Cleanup. A. When paint is thoroughly dry, visually inspect the entire application, and: 1. Touchup as required to provide clean, straight lines and surfaces throughout. 2. Using a permanently opaque paint identical in color to the surface on which the paint was applied, block out and eliminate all traces of splashed, tracked, and/or spilled pavement marking paint from the background surfaces. 3.5 Handicapped. A. Label on curb parking spaces as indicated on Drawings "Handicapped". Accessible parking spaces shall be identified and reserved for the Handicapped by a sign incorporating the symbol of accessibility and places so that it will not be obscured by parked vehicles. The signage shall be of such size that it is legible from a distance that would be reasonable for the condition. (6) Lights for Parking Area. a. Description: This item shall govern for the materials and equipment the installation of the various types of lights for the parking area as shown on the plans. The term "Lights" as used herein shall constitute the complete assemblage of parts, equipment and miscellaneous items, including foundations, erected as provided in the plans and in accordance with these specifications, forming a complete and independent lighting unit. b. Materials: All materials furnished, assembled, fabricated or installed under this item shall be new, and in strict accordance with the details shown on the plans. The contractor shall furnish six sets of shop drawings of the complete assembly in accordance with the Item, "Lights for Parking Area" with certification that all materials used in the fabrication are in accordance with the plans and specifications. No work shall be performed in the shop prior to approval of the above drawings by the Engineers. Any purchase of material prior to fabrication authorization shall be at the Contractor's risk. c. Construction methods: Lights for parking area shall be fabricated and placed in accordance with the details and dimensions shown on the plans or as directed by the Engineer. The careful erection and aligning of the poles furnished under this item shall be considered an essential feature of the installation of the assembly and shall be as near to true alignment as practicable. All circuits shall test clear of faults, grounds and open circuits. After satisfactory completion of the above tests and insulation resistance tests required, the illumination system shall be placed in operation. Final acceptance of the system will not be made until the system has operated satisfactorily for a period of 14 days (this includes energizing and de-energizing the lighting circuits at dusk and dawn). Final acceptance inspection of the system will be made at the end of a satisfactory 14-day test period.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.