For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 28-135 — Regulations governing a permit

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Code of Ordinances § 28-135

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/a30ddc04-065c-4cb6-a7fe-b040cd87efce

Sec. 28-135. - Regulations governing a permit.

The following regulations shall govern the granting of a permit under this article: (1) All expenses pertaining to the issuance, renewal or revocation of a permit shall be borne by the applicant or permittee; (2) Application for a permit shall be made to the building official. A permit shall be for a maximum of three (3) years, unless terminated sooner under the provision of (4), below; (3) Application for a renewal of a permit shall be made to the building official. A permit renewal shall be for a maximum of three (3) years, unless terminated sooner under the provision of (4), below; (4) The city council may terminate a permit at its discretion and with or without notice to the permittee; (5) An application for a permit shall have attached to it all plans, information, drawings and specifications necessary to fully advise the city planner and city engineer of the type, size, shape, location, construction and materials of the improvement or facility; (6) An application for a permit shall contain the location of the proposed facility or improvement in relation to property lines, abutting landowner's buildings or structures (including trees), fences or other structures on the frontage of abutting property; (7) An application for a permit shall contain an affidavit, lease or other express written permission of the abutting property owner or owners authorizing the erection of the facility or improvement; (8) An application for a permit shall contain a metes and bounds description of the area in which the sign is to be erected, and shall bear the certification of a surveyor; (9) If a permit is granted, it shall provide that the completion of the improvement or facility must be inspected by the city engineer and the permit endorsed as to his approval. If the work done on the improvement or facility does not meet building standards or the specifications and drawings as submitted and approved by the city engineer, the permit shall be revoked by the building inspector; (10) In no event shall a permit be granted by the city prior to the date that the required findings set forth in section 28-134 have been made by the city council; (11) An applicant shall set forth in his application his plan for the maintenance and upkeep of the proposed improvement or facility after it is installed or completed.

(Ord. No. 91-156, § 1, 7-1-91)

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.