For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-40 — Construction standards

Code of Ordinances of the City of Lewisville, Texas (Supp. No. 34: codified through Ordinance No. 0854-26-ORD, adopted July 6, 2026) · Lewisville City Code § 13-40

Corpus is an independent public-information project, not the official City of Lewisville website. Stable reference: corpuslaw.us/code/6dd3c8a7-d89a-4620-9d7b-cc2c6eda01e9

Sec. 13-40. - Construction standards.

(a) All construction shall be in conformance with all city codes and applicable local, state and federal laws. Facilities shall be installed, operated and maintained in such a manner so as not to unreasonably interfere with vehicular and pedestrian use of public rights-of-way, or with any existing publicly-owned or publicly-franchised water and wastewater lines, gas lines, electric lines, storm sewer lines, open drainage areas, cable, fiber optic cable, roadways, sidewalks, alleys, traffic control devices, public signs, or any other facilities permitted in the rights-of-way by the city. (b) Public notification of work to be performed. (1) For any closure of a traffic lane or blocking of a sidewalk or alley lasting six days or less, the permittee shall conspicuously mark its vehicles with the permittee's name and telephone number. (2) For projects scheduled to last seven days or more, a three feet by three feet informational sign stating the identity of the person doing the work, a local telephone number, and owner's identity shall be placed at the location where construction is to occur at least 48 hours prior to the beginning of work in the public right-of-way, and shall continue to be posted at the location during the entire time the work is occurring. The informational sign will be posted on public right-of-way at a location that is 100 feet before the construction location commences, unless other posting arrangements are approved or required by the responsible person. (3) When projects last seven days or more, the permittee shall also provide written notification to all adjacent property occupants at least 48 hours prior to the beginning of construction. Informational fliers shall include the person doing the work, a local telephone number, owner's identity, and the proposed construction schedule. (c) Erosion control measures (e.g., silt fence) and advance warning signs, markers, cones, and barricades must be in place before work begins. Owner shall be responsible for stormwater management, erosion control, and excavation safety measures that comply with city, state, and federal guidelines. Requirements shall include, but not be limited to, construction fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, and barricade fencing around open holes. High erosion areas will require wire backed silt fencing. Upon request owner may be required to furnish documentation submitted or received from federal or state government. (d) Permittee shall erect, place and maintain all warning signs, traffic control devices and barricades required by the manual or the responsible person. All such signs, devices and barricades should be in good condition, clean and legible and shall be of the type required by the manual; provided, that the responsible person may authorize the use of different or special devices and equipment if, in his opinion, such equipment will be at least as effective for its intended purpose as that set forth for such purpose in the manual. When additional regulatory signs are deemed necessary by the responsible person such signage will be installed as directed along with such regulator signs as are required to be provided by the city pursuant to the manual. (e) Without affecting the legal relationship between the owner and its contractor, owner is responsible for the workmanship of, and any damages by, its contractors or subcontractors. A responsible representative of the owner will be available to the director at all times during construction. (f) Owner or contractor or subcontractor will notify the director immediately of any damage to other utilities, either city- or privately-owned. (g) Installation of facilities must not interfere with city utilities, in particular gravity-dependent facilities. Facilities shall not be located over, or within two feet, horizontally or vertically, of any water or sanitary sewer mains, unless approved by the responsible person. (h) New facilities must be installed to a minimum depth required by state and federal codes and standards, but not less than 36 inches below grade. (i) All directional boring shall have a locator place bore marks and depths while the bore is in progress. Locator shall place a mark at each stem with a paint dot and depth at least every other stem. (j) Owner will be responsible for verifying the location, both horizontal and vertical, of all facilities. When required by the responsible person, owner shall verify locations by pot holing, hand digging, or other method approved by the responsible person prior to any excavation or boring. (k) Placement of all manholes and/or handholes must be approved in advance by the responsible person. Handholes or manholes will not be located in sidewalks, unless approved by the responsible person. (l) Locate flags shall not be removed from a location while facilities are being constructed. (m) When construction requires pumping of water or mud, the water or mud shall be contained in accordance with federal and state law and the directives of the director. (n) A person shall perform operations, excavations and other construction in the public rights-of-way in accordance with all applicable city requirements, including the obligation to use trenchless technology whenever commercially economical and practical, and consistent with obligations on other similar users of the public right-of-way. The city shall waive the requirements of trenchless technology if it determines that the field conditions warrant the waiver, based upon information provided to the city by the person. All excavations and other construction in the public rights-of-way shall be conducted so as to minimize interference with the use of public and private property. A person shall follow all reasonable construction directions given by the city in order to minimize any such interference. (o) On construction projects in which excavation will exceed a depth of five feet, the permittee must have detailed plans and specifications for excavation safety systems. The term "excavation" includes trenches, structural or any construction that has earthen excavation subject to collapse. The excavation safety plan shall be designed in conformance with state law and Occupational Safety and Health Administration (OSHA) standards and regulations. (p) Prior to any boring, permittee shall identify and verify the elevation of all existing utilities and adjust the bore to avoid contact by a minimum of 12 inches below existing utilities, and a minimum of two feet below city utilities, as per subsection (g) of this section. (q) The depth of conduit, measured from the top of the conduit to the surface of the ground, shall be a minimum of 36 inches. (r) Within the street right-of-way, with the exception of road crossings, city utility crossings and driveways, a four-inch capacity conduit should be used. (s) Trenching shall be promptly backfilled with earth and tamped with a mechanical tamper at six-inch lifts, so that the earth is restored to original grade to assure no hazard to vehicular, animal or pedestrian traffic. A density test may be required to ensure compaction at 95 percent standard proctor, with such test results to be furnished directly from the laboratory to the city engineer. All open trenches will be properly guarded or barricaded to prevent damage or injury. (t) All cable, where practical, shall be located to cross the roadbed at approximately right angles thereto. No cable shall be placed at any culvert or within five feet of the closed point of same. (w) In areas of potential erosion, the area shall comply with city stormwater pollution prevention ordinance. (u) Operations along roadways, walkways and sidewalks shall be kept clear of excavated material or other obstructions at all times. Barricades, warning signs and lights, and flagmen, when necessary, shall be provided by the contractor or the grantee. Operations involving traffic control shall be in accordance with the manual and an approved traffic control plan, which shall be submitted to city engineer's office. (v) Damage to banks, any public utilities, ditches, roads, fences, lawns, shrubbery, drives and any other property, public or private, caused from the equipment and installation of the facilities shall be immediately reported. Except for damage to city-owned public utilities, such damage shall be repaired to the satisfaction of the public authorities having jurisdiction over the public right-of-way involved, at the cost of the owner. Damage to any city-owned public utilities shall be repaired by the city at permittee's expense. (w) All bores shall be accomplished by the dry-bore method or horizontal directional drilling. (x) No appurtenances shall be located in existing or planned sidewalks.

(Ord. No. 4406-08-2017, § 2(Exh. A), 8-12-17)

Ask a question about Lewisville law

Corpus searches the Lewisville sections it holds and shows the ones that match, with their citations. Free, no sign-in.