§ 22.04.133: Application.
(a) Significant industrial users, as defined in section 22.04.002, shall complete and file with the city Southeast Water Reclamation Plant, P.O. Box 2000, Lubbock, TX 79457, phone 806-775-3221, an application in the form prescribed by the city, and accompanied by a fee of one thousand one hundred dollars ($1,100.00). Existing users shall apply for a wastewater contribution permit within thirty (30) days after the effective date of this article, and proposed new users shall apply at least ninety (90) days prior to connecting to or contributing to the POTW. Applications can be obtained from the Southeast Water Reclamation Plant, P.O. Box 2000, Lubbock, TX 79457, phone 806-775-3221. In support of the application, the user shall submit, upon request, in units and terms appropriate for evaluation, part or all of the following information: (1) Name, address, and location of actual facility (if different from the mailing address); (2) SIC number according to the current Standard Industrial Classification Manual, Bureau of the Budget; (3) Wastewater constituents and characteristics including but not limited to those mentioned in division 3 of this article as determined by a reliable analytical laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to section 304(g) of the act and contained in 40 CFR, part 136, as amended; (4) Time and duration of contribution; (5) Average daily and thirty-minute peak wastewater flow rates, including daily, monthly and seasonal variations if any; (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, and appurtenances by the size, location and elevation; (7) Description of activities, facilities and plant processes on the premises including all materials which are or could be discharged; (8) The nature and concentration of any pollutants in the discharge which are limited by any city, state, or federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet applicable pretreatment standards; (9) If additional pretreatment and/or O&M will be required to meet the pretreatment standards, and if so, the shortest schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule: (A) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, executing contract for major components, commencing construction, completing construction, etc.). (B) No increment referred to in subsection (A) above shall exceed nine (9) months. (C) Not later than fourteen (14) days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the director of water utilities including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine (9) months elapse between such progress reports to the director of water utilities. (10) Each product produced by type, amount, process or processes and rate of production; (11) Type and amount of raw materials processed (average and maximum per day); (12) Number of employees, hours of operation of plant and proposed or actual hours of operation of pretreatment system; (13) Any other information as may be deemed by the city to be necessary to evaluate the permit application; (14) Name and title of industrial user (IU) official; (15) List of any other environmental permits the IU has held; (16) Applicable categorical standards such as: The date IU commenced discharge to the city, date of receipt of baseline monitoring report (BMR), date of receipt of the 90 day report for categorical industrial users (CIUs); (17) Certification or the requirement of total toxic organics (TTO) monitoring; (18) Submittal of toxic organic management plan (TOMP), best management practices (BMP's) or other management plan; (19) Any planned changes in the production rate by the IU; (20) Identification of sources of discharge - such as regulated, dilution flow, unregulated, (used for the combined wastewater formula to derive pollutant limits); (21) Indication of the applicability of combined wastewater formula; (22) Estimation or measurement of process and nonprocess flows; (23) Identification of types of discharge, such as continuous or batch discharge; (24) Description of pretreatment facilities; (25) Submittal of slug discharge control plan as required under 40 CFR 403.8(f)(2)(v), if needed; (26) Description of manufacturing facilities; (27) Description of chemical spill prevention areas; and (28) List of hazardous waste and description of storage area of hazardous waste. (b) The city will evaluate the data furnished by the user and may require additional information. The city will document the evaluation for the need to develop a slug discharge control plan within one year from being designated as an SIU. After evaluation and acceptance of the data furnished, the city may issue a wastewater contribution permit subject to terms and conditions provided herein.
( 1983 Code, sec. 28-118 ; Ordinance 9294 , sec. 1, adopted 8/10/1989 ; Ordinance 2003-O0076 , sec. 8, adopted 7/24/2003 ; Ordinance 2014-O0151 , sec. 9, adopted 11/6/2014 ; Ordinance 2019-O0129 , sec. 15, adopted 9/10/2019 ; Ordinance 2020-O0150 , sec. 7, adopted 11/2/2020 ; Ordinance 2022-O0136 adopted 9/13/2022 ; Ordinance 2023-O0108 adopted 9/12/2023 ; Ordinance 2024-O0128 adopted 9/10/2024 )
Ask a question about Lubbock law
Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.