For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.08.044 — Water supply contracts

Code of Ordinances of the City of Lubbock, Texas (Lubbock Code of Ordinances, Charter and Unified Development Code current through Ordinance 2026-O0123 adopted September 22, 2026 (eCode360 publication LU6396, scraped 2026-11-17)) · Lubbock Code of Ordinances § 22.08.044

Corpus is an independent public-information project, not the official City of Lubbock website. Stable reference: corpuslaw.us/code/ad1ca719-de09-43fe-9ccb-7cfd1c3d4925

§ 22.08.044: Water supply contracts.

(a) It is a mandatory requirement for the city to require wholesale customers with any new or amended contracts or successor contracts to develop a water conservation plan. Minimum plan requirements for municipal wholesale customers entering or renewing city contracts include: (1) A completed TCEQ utility profile; (2) A record management system to record water pumped, water deliveries, water sales, and water losses which allows for the desegregation of water sales and uses into the following user classes: residential, commercial, public and institutional, and industrial; and (3) Specific, quantified five-year and ten-year targets for water savings to include goals for water loss programs and goals for municipal use, in gallons per capita per day; (4) Metering devices having accuracy within plus or minus 5 percent in order to measure and account for the amount of water diverted from the supply source; (5) A program for universal metering of both customer and public uses of water, for meter testing and repair, and for periodic meter replacement; (6) Measures to determine and control water loss (for example, periodic visual inspections along distribution lines, annual or monthly audit of the water system to determine illegal connections, abandoned services, etc.); (7) A program of continuing public education and information regarding water conservation; (8) A water rate structure which is not "promotional," meaning a rate structure which is cost-based and which does not encourage the excessive use of water; (9) A reservoir systems operation plan, if applicable, providing for the coordinated operation of reservoirs owned by the utility within a common watershed or river basin in order to optimize available water supplies; (10) A means of implementation and enforcement of conservation practices, as evidenced by either: (A) A copy of the ordinance, resolution, or tariff, indicating official adoption of the water conservation plan by the customer; or (B) A description of the authority by which the customer will implement and enforce the water conservation plan; and (11) Documentation of coordination with the regional water planning group(s) for the service area of the customer in order to ensure consistency with the appropriate regional water plan(s). (b) Water conservation plan must include the following additional elements if the customer serves, or plans to serve in the next 10 years, a population of 5,000 or greater: (1) A program of leak detection, repair, and water loss accounting for the water transmission, delivery, and distribution system in order to control unaccounted-for uses of water; and (2) For wholesale water customers, that they include a requirement that every wholesale water supply contract entered into or renewed after official adoption of the customer's water conservation plan, and including any contract extension, that each successive wholesale customer develop and implement a water conservation plan or water conservation measures using the applicable TCEQ requirements. (c) Other measures that the customer could adopt to meet the stated conservation goals might include but are not limited to: (1) Measurement and control of excessive pressure in the distribution system; (2) Ordinances to promote efficiency and avoid water waste; (3) Plumbing fixture replacement and retrofit programs; (4) Other beneficial reuse of water such as grey water and rainwater harvesting systems; and (5) Other measures as may be applicable. (d) All customer plans must be reviewed and approved by city council before water sales contracts are signed.

( Ordinance 2010-O0055 adopted 7/22/2010 ; Ordinance 2019-O0044 adopted 4/23/19 ; Ordinance 2024-O0076 adopted 6/11/2024 )

Ask a question about Lubbock law

Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.