§ 36.05.002: Filling of trenches.
All trenches shall be backfilled as soon as the pipe mains, electrical cable and/or power lines, television cable, telephone cables and apparatus, or any other type public utility facilities placed underground, are laid out and tested by the person, firm, corporation or public utility excavating such trench or causing such trench to be excavated. The backfilling shall be done in such a manner that the street, alley or sidewalk shall be in as good condition as before such work was done. If at any time after the pipe, mains, electrical cable and/or power lines, television cable, telephone cables and apparatus or any other public utilities facilities placed underground have been laid, the trench settles below the natural grade of the street, alley or sidewalk, the trench shall be refilled and brought to the proper grade at the expense of the person, firm, corporation or public utility responsible for making the cut. The city engineer may make such further requirements on filling as may be necessary to keep the streets, alleys and sidewalks in as good condition as before such cuts are made.
( Ordinance 378 , sec. 2, adopted 6/17/1927 ; 1959 Code, sec. 28-65 ; Ordinance 9015 , sec. 1, adopted 10/9/1980 ; Ordinance 8121 , sec. 1, adopted 12/18/1980 ; 1983 Code, sec. 24-117 )
Ask a question about Lubbock law
Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.